청소년수련과 건설사업 타당성분석 (A Feasibility Study on Construction of the Youth Complex Center)

  • 노병옥;송진우;최상현;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문 발표회
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities arc to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is and effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260㎡ come into analysis to the best gross area. The finally, it is to study on economical efficiency. Income Statement estimated was came out ₩1,7billion. in addition, it offer various benefit by public facilities.

  • PDF

청소년수련관 건설사업 타당성분석 (A Feasibility Study on Construction of the Youth Complex Center)

  • 노병옥;송진우;최상현;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.125-128
    • /
    • 2003
  • This study aims to feasibility study of the Youth Center. Welfare of adolescents is appeared to a matter of concern and interest as social problems of various kinds related adolescents including the fire at a beer bar in Inchon occur recently. In view of government, in addition to fairness of facility location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. A feasibility study is an effective tool in determining the decision of investment or not and the level of investment priority on projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected three and two by consideration of facilities distribution and connection with others. Five proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. It was estimated by analysis of catchment area, similar facilities, programs, in result 7,260$m^2$ cone into analysis to the best gross area The finally, it is to study on economical efficiency. Income Statement estimated was came out \1.7billion. in addition, it offer various benefit by public facilities.

  • PDF

택지조성원가와 발생원가의 오차에 관한 실증연구 : 택지개발사업지구를 중심으로 (An Empirical Study on the Differential Ratio between Construction Cost for Land Development and Incurred Cost: Case of Housing Business District for Land Development in LH)

  • 김태균;장인석;이덕복;김옥연
    • 토지주택연구
    • /
    • 제3권1호
    • /
    • pp.59-68
    • /
    • 2012
  • 현행 우리나라 택지조성원가 산정체계는 택지조성과정에서 준공이전에 추정한 조성원가와 조성과정에서 돌발적으로 발생하는 변동요인이 고려된 준공시의 발생원가로 구분된다. 따라서 두 원가사이에 발생되는 격차로 인해 분양가격에 영향을 미치는 발생원가는 산정체계에 대한 문제점을 지적 받아오고 있으므로 발생원가의 객관성을 높이기 위해서는 예측가능한 돌발상황에 대해 조성원가 산정시 반영되는 방안이 모색되어야 한다. 이에 본 연구에서는 조성원가와 발생원가 사이에 발생되는 격차율 가운데 예측이 가능한 규모를 유효격차율로 정의하고 각 사업지구의 다양한 특성을 고려한 유효격차율을 추정하고자하였다. 따라서 각 사업지구의 다양한 특성을 유형으로 분류하기 위해 5개의 주제별 카테고리를 설정하고, 카테고리들을 복합화한 복합카테고리를 이용하여 유효격차율을 추정하고자 하였으며 추정모형 검정결과 신뢰성이 매우 높은 것으로 분석되었다. 향후 지속적인 자료축척으로 안정화된 추정모형의 유효격차율이 조성원가에 반영되었을 경우 발생원가와의 격차해소에 기여할 것으로 기대된다.

상수도강관 용접접합의 방법별 비교분석 (The Comparison Analysis of Welding Techniques in Water Distribution Steel Pipes)

  • 김응석;정원식;김성표
    • 한국산학기술학회논문지
    • /
    • 제12권6호
    • /
    • pp.2859-2865
    • /
    • 2011
  • 본 연구에서는 상수도관의 도 송수관등 대형관(700mm 이상)에 주로 사용되고 있는 도복장강관의 품질 및 시공, 유지관리에 영향을 미치는 용접접합의 현황을 조사 분석하고 용접접합의 개선방안에 대하여 연구하였다. 이를 위해 강관의 사용현황 등의 문제점을 조사하고 용접접합별 특성, 그리고 수동 및 자동 용접접합을 비교 분석하여 기술적, 경제적으로 효과적인 방안을 제시하고자 하였다. 본 연구에서 비교 분석한 용접접합별 특성 검토 결과, 상수도 관로의 관경 700mm - 3,000mm의 현장 시공시 자동용접공법이 수동용접공법에 비해 순공사비 대비 평균 9% 절감되며, 용접공정만 비교시에는 평균 13.5% 이상 절감될 것으로 판단된다. 특히, KS상 강관 진원도에 대한 허용치가 크며 대부분 겹치기 이음으로 되어있는 국내 현실에서 작업환경이 열악한 경우 진원확보를 위한 시간이 무한정 소요될 수 있어 실제적인 절감액은 더욱 차이를 보일 것으로 사료된다.

터널 건설 예정지구에서의 전기비저항 탐사와 전자탐사의 적용을 통한 연약대 탐지에 대한 사례 연구 (A case histories on the detection of weak zone using electrical resistivity and EM surveys in planned tunnel construction site)

  • 권형석;송윤호;이명종;정호준;오세영;김기석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.63-70
    • /
    • 2002
  • In tunnel construction, the information on the rock quality and the location of fault or fracture are crucial for economical design of support pattern and for safe construction of the tunnel. The grade of rock is commonly estimated through the observation with the naked eye of recovered cores in drilling or from physical parameters obtained by their laboratory test. Since drilling cost is quite expensive and terrains of planned sites for tunnel construction are rough in many cases, however, only limited information could be provided by core drilling Electrical resistivity and EM surveys may be a clue to get over this difficulty. Thus we have investigated electrical resistivity and EM field data providing regional Information of the rock Quality and delineating fault and fracture over a rough terrain. In this paper, we present some case histories using electrical resistivity and EM survey for the site investigation of tunnel construction. Through electrical resistivity and EM survey, the range and depth of coal seam was clearly estimated, cavities were detected in limestone area, and weak zones such as joint, fault and fracture have been delineated.

  • PDF

공사비 예측을 위한 수량기반 데이터 분석방법 : 공공 아파트 수장공사 중심으로 (Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project)

  • 지세현;박문서;이현수;성기훈;윤유상
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.235-243
    • /
    • 2008
  • 건설산업은 발주자가 생산활동(시공) 이전에 소요되는 비용을 예측하여 수급자에게 도급주는 형식을 취한다. 따라서 공사비 예측은 건설 프로젝트 전 단계에 걸쳐 수차례 이루어져야 하며, 발주자와 수급자 모두에게 중요하다. 그러나 국내의 경우 단가물량내역 완료전 공사비 예측은 실적자료를 이용한 면적당 단가방식을 벗어나지 못하고 있으며 이를 보완하기 위한 정형화된 절차와 방법이 미비한 것이 현실이다. 이에 본 연구는 국내 공공 아파트 사업 주동을 대상으로 수량기반 공사비 분석 방법인 면적형 세대별 수량분석 방법을 제안하고 데이터베이스를 구축한 후 유효성과 세목수량 예측중심 공사비 예측방법의 적용성을 확인하였다. 이로써 건설프로젝트 전체 라이프사이클에 대한 공사비정보의 일관성 있고 상호 연계된 관리가 가능할 것으로 예상되며, 예측 결과가 세목 수량과 단가의 곱으로 이루어져 각종변경 및 연계확보, 시점의 변화, 제도의 변화에 탄력적으로 적용될 수 있다. 따라서 본 연구는 건설 공사비정보를 수량기반 데이터 형태로 집 관리할 수 있는 방법을 제시하고 그 효용성을 확인하였다는데 그 의미가 있다.

사무소건물 조명기기와 열원기기의 고효율기기로의 교체에 관한 경제성 검토 (Feasibility Study on Retrofitting Lighting and Heat Source Equipments in Office Buildings)

  • 이철구;김종대;임태순
    • 한국지열·수열에너지학회논문집
    • /
    • 제12권2호
    • /
    • pp.13-18
    • /
    • 2016
  • Energy saving has been main concern, thus government supporting policies which are based on Fundamentals of Low-carbon Green Growth Act', 'Green Building Support Act, have been prepared in Korea. The objective of this study is to estimate energy conservation effectiveness and economic advantage assuming that lighting equipments and heat source equipments would be retrofitted. Office building, which has total floor area of $30,000m^2$, was a subject of this study. From the estimations, electric rate will be decreased by 62,886,000 won per year due to lighting equipments retrofit, and gas rate will be decreased 11,141,000 won or 17,332,000 won per year due to heat source equipments retrofit (in case of COP 1.2 or 1.5). Payback period of each case that are calculated by energy saving cost and retrofit cost are estimated 27.9 year, 38.6 year and 29.2 year, thus economic supporting policies is necessary for effective energy saving in buildings. Meanwhile payback period of heat source equipment for new building is estimated 6.1 year and 8.3 year.

신도시 U-City 서비스 표준화 방법론에 관한 연구 (A Study on the Methodology of U-City Services Standardization)

  • 이상훈;양동석
    • 디지털산업정보학회논문지
    • /
    • 제8권4호
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

관 부설 및 접합공사 공사비산정기준 개선에 관한 연구 (A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work)

  • 오재훈;안방율
    • 한국산학기술학회논문지
    • /
    • 제21권7호
    • /
    • pp.675-684
    • /
    • 2020
  • 노후 인프라로 인한 각종 안전사고 발생과 수질관리 등으로 인하여 상·하수도 관에 대한 공사가 전국적으로 활발하게 진행 되고 있다. 하지만 현장에서는 공사비적용에 있어, 공사비기준의 개정내용을 분석하는 연구나 자료가 없어 어려움을 겪고 있다. 따라서, 본 연구에서는 관 부설 및 접합공사의 공사비산정을 위한 기준현황과 현장조사내용, 개정사항을 분석하였다. 주요 개정요인으로는 시공범위의 불분명, 시설물유형에 따른 배관 재질 적용한계, 보통인부 중심의 인력구성, 인력부설의 한계, 공구손료 및 기계경비 계상기준 미비로 분석되었다. 실제 현장조사를 통해 관종별 특징을 정하여 구분하였고, 양중장비와 경장비의 투입현황 등을 파악하였다. 또한, 관부설과 병행되는 터파기 및 검측에 대한 작업내용, 기능공 투입실태를 조사하였다. 그 결과, 공통사항의 신설을 통한 작업범위의 명확화, 관 재질별 편제구성, 기능공 중심의 인력비율 조정, 기계경비의 계상근거를 마련하였다. 더불어 관의 유지관리를 위한 관 세척 기준을 제정하였으며, 주기개정을 통한 곡관, 이형관의 계상기준을 명확히 하였다. 이러한 개정결과로 인한 공사비영향성을 분석한 결과 사업별로 약 1.28%의 공사비 절감효과가 나타났다.

확률적 모의실험법을 이용한 석탄화력발전소의 건설사업비 추정 (Estimation of the Project Cost for a Coal-fired Power Plant using Stochastic Simulation)

  • 한형기;문승재
    • 플랜트 저널
    • /
    • 제8권4호
    • /
    • pp.45-54
    • /
    • 2012
  • 석탄화력발전소의 건설사업비를 국내 500 MW급 석탄화력발전소를 대상으로 확률적 모의실험 방법인 몬테카를로 시뮬레이션을 통해 추정하였다. 물가상승률을 적용한 실적 건설사업비에 확률적 모의실험 이론을 적용하였고, 전산 모사 소프트웨어를 통하여 건설사업비를 추정하였다. 확률적 모의실험을 통한 국내 500 MW급 석탄화력발전소의 총 건설사업비는 2011년 12월 불변가 기준, 신뢰수준 95%에서 인접발전소가 없는 경우 약 1조 8,700억 원에서 2조 3,300억 원이며 토목공사의 비중과 민감도가 높은 것으로 나타났고, 인접발전소가 있는 경우 약 1조 2,400억 원에서 1조 5,900억 원이며 기자재비의 비중과 민감도가 높으며, 건설사업비 추정시 물가상승률을 적용해야 적합한 결과가 도출되는 것으로 나타났다.

  • PDF