• Title/Summary/Keyword: Estimated Construction Cost

Search Result 307, Processing Time 0.029 seconds

The Study to Derive Empirical Formula of Rainfall Intencity in Korea (한국에 있어서 강우강도의 효과에 관한 연구)

  • 박성우
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.11 no.2
    • /
    • pp.1644-1650
    • /
    • 1969
  • In the design of general hydrological structures, it is well know that the design flood is of importance in the design of those structures. As the design flood is estimated using the design storm, the design storm is defined by the rainfall intensity itself. Though I had studied and reported many times the reports about the rainfall-intensity in my country, poorly I did not study the long-period variation of the intensity through each section in my country before. But now, in the basin area of the Han river and the Keum river, the self-recorded rainfall charts of the single storms, which are mostly above rainfall amount of 30mm and data of about 4500 with the 150 stationyear, were analyzed, And then, the intensity formula of the hourly unit is estimated using the period from 10 minutes to 5 days. The method to analyze and estimate them, and the final results will be summarized as mentioned below: (i) At first I intended to select out the homogeneous watersheds of three, one in the Han river and two in the Keum river. But I would select the northern and the sourthern river basins, and westward from Koan station, in the basins of the Han river. Also I would select the upstream area, and the downstream area including the watershed of Chungioo, Kongjoo, Chupungryung, and the Mt. Sock, in the basins of the Keum river. Finally, I could find that there couldn't in the Keum river basin. So, I decided out and analyze only river basins of the Han river with limitation mentioned above. (ii) The statistical method to select out the homogenous watersheds is the test of homogeneous variance, and it is estimated from the following equation: $$X_{k1}^2=[{\Sigma}(n_i-1)log\bar{S^2}-\Sigma(n_i-1)log\bar{S^2}]{\times}loge$$ (iii) Actually, each homogeneous watershed has individually its own intensity formula, But I would express them as the actual amount, because the equation of intensity variance is experiential and theoretical equation of the variance. Therefore the caluating equation is actually more convenient in the actual uses. (iv) This report is one of the series for me to give the basis to the actual designs. The cost for this study is provided by the Ministry of Construction. And the designs of the hydrological structures in the watersheds with limitation mentioned above may be concerned with and based upon this report.

  • PDF

Study on Forecasting Urban Rail Demand Reflecting Transfer Fare Value in a Non-integrated Fare System (독립.환승할인요금체계하의 환승요금가치를 고려한 도시철도 수요추정 연구)

  • Lee, Jong-Hun;Son, Ui-Yeong
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.155-162
    • /
    • 2009
  • The recent increase of light rail construction by the private sector in Korea has caused a new issue in forecasting rail demand. Integrated fare systems between several rail operators is convenient and brings cost savings to users, and therefore is also very effective in increasing demand. However, it causes some short-term revenue loss to operators so that the private sector often suggests a non-integrated fare system. The current rail demand forecasting model is based upon an integrated fare system. Thus this model cannot be used to forecast the demand with a non-integrated fare system. Some value of transfer fare should be estimated and applied to forecast the demand in a non-integrated fare system. This study conducted a stated preference (SP) survey on urban railway passengers and estimated the value of transfer fare. The estimated value is 2,609 Won/hr, which is about 52% of in-vehicle time. This shows railway users have a tendency to pay more for transfer fares to save time or distance. This value has some limitations since it is derived from the SP survey. If some non-integrated fare system is applied in the future and a RP survey is conducted and compared with these study results, a more clear value of the transfer fare will be derived.

Economic Impact Analysis of the Ready-Operational Physical Properties Laboratory on Geoscience and Mineral Resources (지질자원 연구개발을 위한 상시가동 물성실험실 구축의 경제적 파급효과 분석)

  • Ahn, Eun-Young;Lee, Sang-Kyu
    • Economic and Environmental Geology
    • /
    • v.40 no.6
    • /
    • pp.805-814
    • /
    • 2007
  • To offer R&D infrastructure on geoscience and mineral resources area, a new project was launched in KIGAM to build-up of a 'Ready-Operational Physical Properties Laboratory'. In this study, we evaluate the economic impact of the concentration of physical properties measurements equipment and facilities in KIGAM. As centralization of physical properties measurements of earth samples, the direct effects, annual measurement cost reduction and equipment opportunity cost are expected 1,095 million Won (US$1.095 million) and 1,440 million Won (US$1.440 million) in present aspects, and 1,110 million Won (US$1.110 million) and 1,527 million Won (US$1.527 million) in future aspects. The indirect economic effect by increasing of the relative papers is estimated 7,524 million Won (US$7.524 million) by the input cost approach, and the contributions of gross domestic product are 8,010 billion Won (US$8.010 billion) in the heavy construction industry and 260 billion Won (US$0.260 billion) in the mining and quarrying industry.

An approximate study on flood reduction effect depending upon weir or gate type of lateral overflow structure of washland (강변저류지 월류부에서 월류제 또는 수문 형식에 따른 홍수저감효과에 관한 개략적 연구)

  • Ahn, Tae Jin
    • Journal of Wetlands Research
    • /
    • v.15 no.4
    • /
    • pp.573-583
    • /
    • 2013
  • Construction of large-scale structures such as dams would be suggested actively to cope with change of flood characteristics caused by climate change. However, due to environmental, economic and political issues, dams are not ideally constructed. Thus flood damage reduction planning projects would get started including washland or detention pond for sharing the flood in basin. The washland made artificially by human being is an area of floodplain surrounded by bank to be intentionally inundated by overflowing through overflow structure adjacent to main channel during flood season. Flood reduction capacity at just downstream of each washland could be affected by type, length, and crest elevation of overflow structure in addition to shape of design hydrograph, storage volume of washland, etc.. In this study flood reduction effects of washland are estimated for overflow weir type and gate type to compare the results of flood reduction respectively subjected to given hydrograph in sample site, the Cheongmicheon stream. It has been shown that even if gate type at overflow structure could yield more flood reduction than overflow weir type, economic aspect such as initial cost, operation cost and maintenance cost should be considered to select the type of overflow structure because flood reduction rate by gate type could not be significant value from engineering point of view.

A preliminary study on economical efficiency of a room-and-pillar excavation method in comparison with 2-arch tunnelling method (2아치 터널 굴착 공법과의 비교를 통한 주방식 굴착 공법의 예비 경제성 검토 연구)

  • Lee, Chulho;Chang, Soo-Ho;Ahn, Sung-Youll;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.599-612
    • /
    • 2013
  • This study aims to investigate an economical efficiency of two excavation methods with respect to the room-and-pillar method for the underground space and conventional excavation method, i.e. 2-arch tunnelling method. For feasibility study, an excavation cost for both room-and-pillar method and 2-arch tunnelling method was estimated when the same space in operation was required. It was assumed that properties of reinforcements and rock were adopted from literatures. However, an excavation shape of the room-and-pillar method was assumed not to be the rectangular shape which is a general type in the room-and-pillar method but to be an arch shape in order to compare with the conventional excavation method (2-arch tunnelling) and to achieve the maximum bearing capacity of the structure during excavation. Consequently, the wider space in use or required and the better condition of rock we assumed, the more economical advantage we have in the room-and-pillar method than the 2-arch tunnelling method.

A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation (BIM 견적 작업 생산성 향상을 위한 업무 환경 조성에 관한 연구)

  • Kim, Seong-Ah;Park, Gweon;Song, Byeong-Seob;Choi, Chel-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.56-65
    • /
    • 2016
  • Many cases have mentioned the effect by applying BIM on the media such as at conferences, workshops, reports, ect. These cases reported that costs could be saved directly by prevention the need to re-do and reconstruct caused by using BIM. BIM users mentioned that using BIM has potential value in saving costs. The benefits of the BIM include intangible value that cannot be estimated in costs, such as reducing work time and improving productivity. However, the financial value of using BIM, such as Return on Investment, has not yet been exposed, and BIM users have a negative view of the financial value of BIM in Korea. Therefore, this study has researched the effects of applying BIM on construction estimate services in view of business productivity, not finance. This study compared the traditional and BIM based estimation, and verified the effect of estimating BIM through work sampling. This study investigated a precondition for getting the effects of BIM based estimation. The results show a need for BIM education, 3D Modeling standards, and database on quantity in order to improve product ivity and reduce work time on BIM based estimation

A Study on the Power Supply and Demand Policy to Minimize Social Cost in Competitive Market (경쟁시장 하에서 사회적 비용을 고려한 전력수급정책 방향에 관한 연구)

  • Kwon, Byung-Hun;Song, Byung Gun;Kang, Seung-Jin
    • Environmental and Resource Economics Review
    • /
    • v.14 no.4
    • /
    • pp.817-838
    • /
    • 2005
  • In this paper, the resource adequacy as well as the optimum fuel mix is obtained by the following procedures. First, the regulation body, the government agency, determine the reliability index as well as the optimum portfolio of the fuel mix during the planning horizon. Here, the resources with the characteristics of public goods such as demand-side management, renewable resources are assigned in advance. Also, the optimum portfolio is determined by reflecting the economics, environmental characteristics, public acceptance, regional supply and demand, etc. Second, the government announces the required amount of each fuel-type new resources during the planning horizon and the market participants bid to the government based on their own estimated fixed cost. Here, the government announces the winners of the each auction by plant type and the guaranteed fixed cost is determined by the marginal auction price by plant type. Third, the energy market is run and the surplus of each plant except their cost (guaranteed fixed cost and operating cost) is withdrew by the regulatory body. Here, to induce the generators to reduce their operating cost some incentives for each generator is given based on their performance. The performance is determined by the mechanism of the performance-based regulation (PBR). Here the free-riding performance should be subtracted to guarantee the transparent competition. Although the suggested mechanism looks like very regulated one, it provides two mechanism of the competition. That is, one is in the resource construction auction and the other is in the energy spot market. Also the advantages of the proposed method are it guarantee the proper resource adequacy as well as the desired fuel mix. However, this mechanism should be sustained during the transient period of the deregulation only. Therefore, generation resource planning procedure and market mechanisms are suggested to minimize possible stranded costs.

  • PDF

Mechanical Characteristics of Dredged and Reclaimed Ground with Low Plasticity from Western Coastal Site (서해안 저소성 준설매립 지반의 역학적 특성)

  • Jeong, Sang Guk
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.97-104
    • /
    • 2015
  • When carrying out design for soft ground improvement before reclamation of dredged soil, it is very important to appropriately evaluate design parameters such as compression index and undrained strength in order to estimate optimum construction cost. In this study, consolidation and strength parameters were estimated by the samples obtained from the similar reclaimed land. Water content and compression index of dredged soil reclaimed by hydraulic fill method were quite decreased in comparison with those of in-situ conditions at Incheon site. Relationships between compression index(Cc) and water content (wn), and between undrained strength (su) and water content (wn) for dredged soil were obtained by field vane test and oedometer test, respectively. Applicability of Schmertmann correction method (compression index) for low plasticity silty soil was discussed according to comparison with designed and measured settlements.

Estimation of Design Wave Height for the Waters around the Korean Peninsula

  • Lee, Dong-Young;Jun, Ki-Cheon
    • Ocean Science Journal
    • /
    • v.41 no.4
    • /
    • pp.245-254
    • /
    • 2006
  • Long term wave climate of both extreme wave and operational wave height is essential for planning and designing coastal structures. Since the field wave data for the waters around Korean peninsula is not enough to provide reliable wave statistics, the wave climate information has been generated by means of long-term wave hindcasting using available meteorological data. Basic data base of hindcasted wave parameters such as significant wave height, peak period and direction has been established continuously for the period of 25 years starting from 1979 and for major 106 typhoons for the past 53 years since 1951 for each grid point of the North East Asia Regional Seas with grid size of 18 km. Wind field reanalyzed by European Center for Midrange Weather Forecasts (ECMWF) was used for the simulation of waves for the extra-tropical storms, while wind field calculated by typhoon wind model with typhoon parameters carefully analyzed using most of the available data was used for the simulation of typhoon waves. Design wave heights for the return period of 10, 20, 30, 50 and 100 years for 16 directions at each grid point have been estimated by means of extreme wave analysis using the wave simulation data. As in conventional methodsi of design criteria estimation, it is assumed that the climate is stationary and the statistics and extreme analysis using the long-term hindcasting data are used in the statistical prediction for the future. The method of extreme statistical analysis in handling the extreme vents like typhoon Maemi in 2003 was evaluated for more stable results of design wave height estimation for the return periods of 30-50 years for the cost effective construction of coastal structures.

Evaluation of Regression Models in LOADEST to Estimate Suspended Solid Load in Hangang Waterbody (한강수계에서의 부유사 예측을 위한 LOADEST 모형의 회귀식의 평가)

  • Park, Youn Shik;Lee, Ji Min;Jung, Younghun;Shin, Min Hwan;Park, Ji Hyung;Hwang, Hasun;Ryu, Jichul;Park, Jangho;Kim, Ki-Sung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.57 no.2
    • /
    • pp.37-45
    • /
    • 2015
  • Typically, water quality sampling takes place intermittently since sample collection and following analysis requires substantial cost and efforts. Therefore regression models (or rating curves) are often used to interpolate water quality data. LOADEST has nine regression models to estimate water quality data, and one regression model needs to be selected automatically or manually. The nine regression models in LOADEST and auto-selection by LOADEST were evaluated in the study. Suspended solids data were collected from forty-nine stations from the Water Information System of the Ministry of Environment. Suspended solid data from each station was divided into two groups for calibration and validation. Nash-Stucliffe efficiency (NSE) and coefficient of determination ($R_2$) were used to evaluate estimated suspended solid loads. The regression models numbered 1 and 3 in LOADEST provided higher NSE and $R_2$, compared to the other regression models. The regression modes numbered 2, 5, 6, 8, and 9 in LOADEST provided low NSE. In addition, the regression model selected by LOADEST did not necessarily provide better suspended solid estimations than the other regression models did.