• 제목/요약/키워드: Estimate of BIM

검색결과 51건 처리시간 0.028초

BIM 기반 개산견적을 위한 DB구축 기초연구 (Preliminary Study on the Construction of Database for BIM-based preliminary estimate.)

  • 전기현;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 - (BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -)

  • 이해찬;김진만;최철호;송상훈
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발 (A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique.)

  • 배성재;서봉교;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례 (A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management)

  • 박영진;송경철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF

IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크 (Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge)

  • 박상헌;박형진;구교진
    • 한국산학기술학회논문지
    • /
    • 제16권6호
    • /
    • pp.4176-4184
    • /
    • 2015
  • 건설사업 전 생애주기 중 설계단계에서의 대안별 비용 예측은 사업의 수익성 및 타당성 분석을 위한 판단기준이 된다. 설계도서가 완성되지 않은 초기 설계단계에서 과거의 유사자료를 바탕으로 개산견적이 실시되고 있다. 견적자의 경험과 산정방법에 따라 물량이 상이하고 누락되는 경우가 발생한다. 최근 IT기술 발전으로 BIM 기술이 주목을 받으면서 건설 전반에 걸쳐 기획, 설계, 시공, 유지관리 기술의 패러다임을 변화 시키고 있다. BIM을 활용한 다양한 연구가 시도되고 있지만, 활용 효과는 건설 사업의 기대에 미치지 못하고 있다. 본 연구에서는 국제 표준 IFC와 견적 관련 지식정보를 연계한 개산견적 프레임워크를 제안한다. 그 결과, 초기 설계단계에서 의사결정을 위한 공사비 예측을 수행하며, 그리고 선행연구의 한계점을 일부분 극복이 가능할 것으로 기대된다. 또한, 개산견적 프레임워크는 프로세스 일부를 자동화하였기 때문에 변경에 대한 능동적인 대처가 가능하다.

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안 (A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase)

  • 정준호;진상윤
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.23-34
    • /
    • 2011
  • 건설현장에서 정확한 진도를 관리하기 위해서는 비용정보와 일정정보를 결합한 통합정보가 요구되며 프로젝트의 성과측정을 위한 기초자료가 된다. 그러나 국내 건설공사는 비용과 일정정보를 각각 관리함으로써 객관적인 성과측정이 어려우며 내역서상의 물량을 액티비티에 분개하는 작업을 통해 생산성을 감소시킨다. 한편, BIM을 활용한 연구가 진행되면서 BIM을 통해 보다 효율적으로 진도관리하는 연구가 필요한 실정이며 현장에서는 일일 작업관리에 대한 필요성이 요구되고 있다. 이러한 건설 산업의 흐름에 따라 본 논문에서는 BIM 모델의 위치정보와 BIM기반의 견적데이터를 활용하여 3가지 타입의 진도관리단위를 생성하고 이를 통해 일일 진도율 및 일일 기성액을 파악하는 정보모텔을 제시하고자 한다.

BIM 기반 형상코드를 이용한 기둥 철근길이 자동 산정 기초 연구 (A Basic Study of Automatic Rebar Length Estimate Algorithm of Columns by Using BIM-Based Shape Codes Built in Revit)

  • 오진혁;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2023
  • In reinforced concrete constructions, reinforcing bar generates more CO2 per unit weight than other construction materials. In particular, cutting and bending rebar is the main source of rebar waste in the construction industry. Rebar-cutting waste is inevitable during the construction of a reinforced concrete structure since the rebar is not manufactured as designed. Large amounts of waste can be avoided by utilizing optimal cutting patterns and schedules. This research provides a fundamental analysis of the automatic calculation of column rebar length using BIM-based shape codes to minimize cutting waste to near zero. By employing this approach in practice, it is possible to minimize the rate of rebar-cutting waste, reduce costs, shorten construction duration, and reduce CO2 emissions. In addition, the development of this research will serve as a clue for the development of BIM-based rebar layout automation algorithms.

  • PDF