An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects (현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안)

  • Park, Yang-Ho;Kown, Beom-Jun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.435-439
    • /
    • 2006
  • The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

  • PDF

Intraperitoneal Paclitaxel Combined with S-1 Plus Oxaliplatin for Advanced Gastric Cancer with Peritoneal Metastasis: a Phase I Study

  • Kim, Dong-Wook;Seo, Won Jun;Youn, Sang Il;Jee, Ye Seob;Jang, You-Jin;Kim, Jong-Han
    • Journal of Gastric Cancer
    • /
    • v.21 no.4
    • /
    • pp.418-425
    • /
    • 2021
  • Purpose: We designed a new regimen by combining intraperitoneal (IP) paclitaxel (PTX) with systemic S-1 plus oxaliplatin (SOX) for the treatment of advanced gastric cancer with peritoneal metastasis. This dose-escalation study aimed to determine the maximum tolerated dose (MTD) and recommended dose (RD) of IP PTX administered weekly to patients. Materials and Methods: Eight cycles of IP PTX plus SOX regimen were administered to the patients. S-1 was administered orally twice daily at a dose of 80 mg/m2/day for 14 consecutive days, followed by 7 days of rest. Intravenous oxaliplatin was administered at a fixed dose of 100 mg/m2 on day 1, while IP PTX was administered on days 1 and 8. The initial dose of IP PTX was 40 mg/m2, and the dose escalation was set in units of 20 mg/m2 up to 80 mg/m2. Dose-limiting toxicities (DLTs) were defined as grade 3 non-hematologic toxicities, grade 4 leukopenia, grade 3 febrile neutropenia, and grade 3 thrombocytopenia. Results: Nine patients were included in the study. No DLTs were observed in any of the enrolled patients. Therefore, the MTD was not reached, and the RD of IP PTX was determined to be 80 mg/m2. Four patients (44%) showed a decreased peritoneal cancer index score on second-look laparoscopic examination. Conclusions: The present study determined the dose for further clinical trials of IP PTX to be 80 mg/m2, when combined with a systemic SOX regimen.

Lifetime Escalation and Clone Detection in Wireless Sensor Networks using Snowball Endurance Algorithm(SBEA)

  • Sathya, V.;Kannan, Dr. S.
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.16 no.4
    • /
    • pp.1224-1248
    • /
    • 2022
  • In various sensor network applications, such as climate observation organizations, sensor nodes need to collect information from time to time and pass it on to the recipient of information through multiple bounces. According to field tests, this information corresponds to most of the energy use of the sensor hub. Decreasing the measurement of information transmission in sensor networks becomes an important issue.Compression sensing (CS) can reduce the amount of information delivered to the network and reduce traffic load. However, the total number of classification of information delivered using pure CS is still enormous. The hybrid technique for utilizing CS was proposed to diminish the quantity of transmissions in sensor networks.Further the energy productivity is a test task for the sensor nodes. However, in previous studies, a clustering approach using hybrid CS for a sensor network and an explanatory model was used to investigate the relationship between beam size and number of transmissions of hybrid CS technology. It uses efficient data integration techniques for large networks, but leads to clone attacks or attacks. Here, a new algorithm called SBEA (Snowball Endurance Algorithm) was proposed and tested with a bow. Thus, you can extend the battery life of your WSN by running effective copy detection. Often, multiple nodes, called observers, are selected to verify the reliability of the nodes within the network. Personal data from the source centre (e.g. personality and geographical data) is provided to the observer at the optional witness stage. The trust and reputation system is used to find the reliability of data aggregation across the cluster head and cluster nodes. It is also possible to obtain a mechanism to perform sleep and standby procedures to improve the life of the sensor node. The sniffers have been implemented to monitor the energy of the sensor nodes periodically in the sink. The proposed algorithm SBEA (Snowball Endurance Algorithm) is a combination of ERCD protocol and a combined mobility and routing algorithm that can identify the cluster head and adjacent cluster head nodes.This algorithm is used to yield the network life time and the performance of the sensor nodes can be increased.

Solving the Problem about Requirements Commitment on CMMI (CMMI의 요구사항 협의 확정에 대한 문제점 및 개선방안)

  • 김홍기;백인섭
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2004.10b
    • /
    • pp.484-486
    • /
    • 2004
  • CMMI는 조직의 역량 성숙도를 향상시키기 위한 소프트웨어 프로세스 개선(SPI) 모델이다 CMMI의 단계적 형태(Staged Representation)의 2레벨을 획득하기 위해서 요구되는 요구사항 관리 프로세스 영역은 요구사항에 대한 협의 확정(Commitment) 활동을 포항하고 있다. 요구사항 관리 프로세스 영역은 이전에 협의 확정된 요구사항이 필요한 경우 변경이 가능하도록 허용하고 있는데, CMMI와 같이 프로세스 중심적인 모델에서 이러한 변경 가능성은 협의 확정 사항의 무한정 확대(Escalation of Commitment)와 같은 문제점을 야기할 수 있다. 본 논문에서는 SPI학계에서 사용되는 협의 확정에 대한 정의를 살펴보고, 이 정의를 CMMI에 적용함으로써 요구사항 관리 프로세스 영역의 협의 확정을 수행하는 활동에서 발생할 수 있는 문제점을 해결하기 위한 방안을 제시한다. 협의 확정의 개념은 Brown에 의해서 정의된 속성(1)과 Meyer에 의해서 제안된 형태(2)를 적용하여 정성적이고 정량적인 관리가 가능할 수 있다. 이를 통하여, 요구사항의 협의 확정에 대한 체계적인 관리가 가능해질 수 있다.

  • PDF

Domestic earthquake prediction using bayesian approach (베이지안 기법을 이용한 국내 지진 사고 예측)

  • Yang, Hee-Joong
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.4
    • /
    • pp.119-125
    • /
    • 2009
  • We predict the earthquake rate in Korea following Bayesian approach. We make a model that can utilize the data to predict other levels of earthquake. An event tree model which is a frequently used graphical tool in describing accident initiation and escalation to more severe accident is transformed into an influence diagram model. Prior distributions for earthquake occurrence rate and probabilities to escalating to more severe earthquakes are assumed and likelihood of number of earthquake in a given period of time is assessed. And then posterior distributions are obtained based on observed data. We find that the minor level of earthquake is increasing while major level of earthquake is less likely.

Technical Development and Direction of Sustainable Agriculture in Korea (우리나라 친환경 농업의 현황과 발전방향)

  • Park Moo-Eon
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 2001.09a
    • /
    • pp.3-33
    • /
    • 2001
  • A review on the technical development and agricultural policy direction for sustainable agriculture has been made to clarify the present conditions of agricultural environment for food production and natural resource conservation and to study prospects and solutions successfully to achieve food safety and environment conservation as the 21st agricultural paradigm. Although great improvement of environmentally sound and resource-conserving techniques, sustainability of Korean agriculture has been damaged by quantitative reduction and quality deterioration of agricultural land resources, insufficient implementation of low-input and organic matter recycling techniques and also improper cropping system. It is concluded that goal of sustainable agriculture can be successfully achieved by further improvement of environmentally friendly techniques, and stronger escalation of national implementation programmes with more financial supports including direct payments for sustainability of agriculture under systematical support and cooperation of AKS (agricultural knowledge system).

  • PDF

Development of Knowledge Information Modeling System using DB construction of manufacturing process (생산공정의 DB 구축을 통한 지식정보모델링 시스템 개발)

  • Ban C.W.;Lee H.S.;Jang D.Y.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.191-194
    • /
    • 2005
  • Over the past decade, changes in product development processes and increased consumer demands have dramatically influenced engineering working practices and targets. The information technology revolution has made its appearance concurrent to this relentless escalation in product engineering requirement. It has offered hopes for improved productivity despite these increasing demands. The wide availability of personal computing power, virtually inexhaustible sources of information and an abundance of computerized engineering tools have created great expectations. Knowledge information modeling system and database were developed using ASP and Microsoft SQL 2000 Server to share the DB that can be utilized to process on the web.

  • PDF

정보통신공사비지수 개발에 관한 연구

  • Kim, Tae-Gyun;Jo, Hun-Hui;An, Cheol-Mo;Gwak, Jeong-Ho;Seo, Sun-Seok;Kim, Yeong-Sam;Kim, Seo-Gyeong;Kim, Jin-Ho
    • Information and Communications Magazine
    • /
    • v.29 no.7
    • /
    • pp.89-96
    • /
    • 2012
  • 정보통신공사의 공사비 산정은 그동안 원가계산 방식으로 이루어져 왔으나, 최근 들어 건설 및 전기분야에서와 같이 실적공사비를 활용할 수 있도록 제도 시행을 추진하고 있다. 그러나 실적공사비를 적용하기 위해서는 과거 공사비 실적자료를 현가화 할 수 있는 지수의 개발이 전제되어야 함에도, 그동안 정보통신공사는 한국건설기술연구원의 통신공사비지수(기타 특수건설의 최하위지수)나 한국은행의 생산지물가지수를 이용할 수밖에 없는 한계를 지니고 있었다. 이에 본 연구에서는 실적적산 데이터를 기반으로 정보통신공사의 특성을 고려한 정보통신공사비지수를 제시하고자 한다. 개발된 지수는 실적공사비 자료의 현가화 뿐 아니라, 물가변동에 따른 계약단가 조정(Escalation), 정보통신분야의 거시적인 동향을 파악할 수 있는 주요 지표로 정보통신공사의 사업비산정 및 관련 분야의 기초자료로 활용될 수 있다.

An Effect Analysis of Lead Time Changes on Investment Evaluation of a Nuclear Power Plant Construction : A Trade-Off Analysis Between a Construction Cost and Lead Time (원자력발전소 건설 리드타임의 변화가 투자프로젝트 평가에 미치는 효과분석: 발전소 건설비용과 리드타임 간의 상쇄효과분석)

  • Kim, Gyu-Tai;Lee, Byung-Gook;Oh, Chi-Jae
    • IE interfaces
    • /
    • v.12 no.3
    • /
    • pp.414-423
    • /
    • 1999
  • A nuclear power plant requires a huge amount of initial investment and long construction lead time. As we expect that there may exist a relationship between investment and construction lead time, a number of researchers have reported that nearly a half of investments is incurred due to time factors such as the time value of money and inflation or escalation rates. Therefore, we investigated in this paper a relationship between the initial investment and the construction lead time of a nuclear power plant construction, and proposed a method for a trade-off analysis between the annual equivalent worth and the investment alternatives to reduce the construction lead time. Finally, we presented a real case to numerically explain the steps of the method presented in this paper.

  • PDF

(A Study on Optimization for Connected-(r,s)-out-of-(m,n):F System ) ((m,n)중 연속(r,s):F시스템의 최적화 연구)

  • Lee, Sang-Heon;Gang, Yeong-Tae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.618-629
    • /
    • 2006
  • This Paper is about optimizing preventive maintenance period of connected (r,s) out of(m,n) : F lattice system that one of multi-component system, (m,n) matrix failure of whole system is occurrence when parts that belong in (r,s) matrix part procession of parts arranged with procession are breakdown all. The preventive maintenance about system is very important viewing from system reliability and operational expense viewpoint. Preventive maintenance that misses a time calls big loss by system failure and expense of frequent full equipment is paid excessively in preventive maintenance itself but expense is paid much in preventive maintenance itself and whole expense escalation can be achieved preferably. Through this research, reliability model is constructed that do expense by smallest under full equipment policy chosen through comparison of each full equipment policy and preventive maintenance expense full equipment cycle and r ,s value are made using simulated annealing algorithm and simulated annealing algorithm that converge fast in multi-component system certified most suitable to optimization decision

  • PDF