The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to. the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling.
Generally, the shipbuilding industry has finite resources and limited workspace. Due to finite resources, limited workspace and state of block preparation, erection process in shipbuilding industry is frequently delayed than erection process scheduling which is planned at long-term plan stage. In this study, considering variability of block reserve ratio, the degree of delay in real erection process is measured and compared to scheduling which is planned at long-term plan stage in shipbuilding industry including finite capacity and variative lead time. Also, the erection process scheduling which has minimum lead time can be checked through simulation. The results of this study could be improved the accuracy of erection process scheduling by checking the main event compliance ratio by block reserve ratio and calculating the optimum erection pitch for the main event compliance.
본 연구에서는 스트라치 시스템의 긴장설치과정 해석을 수행하기 위한 개선된 명시적 해석법을 제안하였다. 스트라치 시스템은 Stressed-Arch에서 유래한 용어로 슬리브에 의한 갭이 도입된 유동 하현재가 내부의 긴장재에 의한 초기장력의 도입으로 서서히 닫히게 되고, 이에 따라 전체 구조물이 상승하여 최종적인 아치형태의 구조물을 형성하는 독창적인 구조시스템이다. 스트라치 시스템의 초기장력 도입과정을 긴장설치(stress-erection process) 과정이라 하며, 초기곡률의 도입에 따라 유동 상현재에는 과도한 초기변형이 발생하여 소성거동에 의한 강체회전이 발생하는 불안정 구조물이 된다. 본 연구에서는 이러한 스트라치 시스템의 불안정 거동특성을 해석하기 위해서 소성힌지가 적용된 보-기둥요소를 사용하여 유동상현재를 모델링하였고, 불안정 구조물의 해석법에 효과적으로 사용되는 동적이완법의 개선된 알고리즘을 개선하여, 실제 스트라치 구조물의 긴장설치과정 해석을 수행하였으며, 실제 프로젝트에 대한 해석결과의 분석을 통하여 제안된 해석법의 적용성을 검증하였다.
This paper explains a way of describing the erection sequence using the connecting relationship among blocks of a hull in shipbuilding industry. The information of the adjacent blocks such as upper, lower, right, left, front, rear, and their erection status, etd., is defined and the proper use of this allows us to determine one of the possible erection sequences. The methodology suggested also includes some useful benefits of avoiding insert blocks or maintaining stability in erection process. Further, an algorithm for generating the initial erection network is shown and this network may be a basis for designing daily erection scheduling. Some examples illustrate the procedure developed in this study and the results support the model's fidelity.
There are hundreds of ship blocks which are under the block assembly, painting, and outfitting assembly works in the pre-erection shops of shipyard. Generally, each block is planned to be processed in a pre-erection shop according to the block type by the long-term production-scheduling before six months. However, many blocks can't be processed in the planned time and the planned shop since the before and after block-processing changes or delays the planned sequential works in pre-erection shops. Therefore, it is essential to monitor the current location of each block and work in process to cope with the changed situation of pre-erection shops. Present study integrates PDA, GPS, and CDMA not only to chase the location of each block but also to exchange the pre-erection work order and the work report between the production-scheduling server and the production managers in the pre-erection shops. This study shows a prototype for the block tracing and process monitoring in the pre-erection shops.
The cable staying roof structure of Jeju worldcup stadium should be erected with correct prestressed force that is required by the structural engineer who designs this structure. This study evaluated and adapted the erection process of cable, the erection force and the measurement of cable force for Jeju worldcup stadium. The process of erection is required not only to calculate erection force but also to check structural stability, following process, construction period and using cranes. Considering the site conditions and technical problems, this study can attain successfully the erection of cable staying roof structure of Jeju worldcup stadium with allowable errors.
탑재 공정 계획은 도크 공기를 만족토록 탑재 전략과 탑재 블록 순서를 결정하는 것이며, 탑재일정 계획은 결정된 탑재 순서에 따라 블록의 탑재일을 결정하는 것이다. 일정 계획에 따라 부하 분포가 다양한 양상을 보이며, 이는 생산 비용에 영향을 미친다. 제한된 가용 자원을 효율적으로 사용하면서 최단 공기에 탑재를 완료할 수 있는 최적의 공정 계획을 수립하기 위해서는 공정 계획과 일정 계획의 다양한 조합에 대해 시뮬레이션해 볼 수 있어야 한다. 최적 탑재 공정 계획 시스템 구축을 위해서는 탑재 순서를 자동으로 생성하는 시스템과 부하 평준화 시스템이 요구된다. 본 논문에서 탑재 순서 자동 생성 방안을 약술하였다. 부하 평준화는 같은 도크 기간에 건조하는 모든 선박에 대해 동시에 행하여야 신뢰성 있는 결과를 얻을 수 있다. 이럴 경우 탐색 범위가 매우 넓어짐으로 효율적인 최적화 기법이 필요하다. 본 연구에서는 유전 알고리즘을 이용한 부하 평준화 시스템을 구현하였다. 본 시스템 개발로 일정 계획이 고려된 다양한 공정 계획 시뮬레이션이 가능하다.
The flutter stability of long-span suspension bridges during erection can be more problematic and more susceptible to be influenced by many factors than in the final state. As described in this paper, numerical flutter stability analyses were performed for the construction process of Zhongdu Bridge over Yangtze River using the commercial FE package ANSYS. The effect of the initial wind attack angle, the sequence of deck erection, the stiffness reduction of stiffening girders, the structural damping, and the cross cables are discussed in detail. It was found that the non-symmetrical sequence of deck erection was confirmed to be aerodynamically favourable for the deck erection of long-span suspension bridges and the best erection sequence should be investigated in the design phase. While the initial wind attack angle of $-3^{\circ}$ is advantageous for the aerodynamic stability, $+3^{\circ}$ is disadvantageous compared with the initial wind attack angle of $0^{\circ}$ during the deck erection. The stiffness reduction of the stiffening girders has a slight effect on the flutter wind speed of the suspension bridge during erection, but structural damping has a great impact on it, especially for the early erection stages.
In this paper, we develope a genetic algorithm for the erection scheduling in shipbuilding. Erection, the final manufacturing stage of shipbuilding, involves the landing and joining of blocks at drydock. Since several ships are built simultaneously at the same drydock and they compete with the common constrained production resource such as labor, space, and crane, we should consider both ship-specifics and common resource constraints for the desirable erection scheduling. Ship erection should also satisfy the predetermined dock cycle given from higher level production planning. Thus, erection schedule of a ship can be represented as a PERT/CPM project network with its own deadline. Since production resources are shared, the erection scheduling become the so-called multi-project scheduling problem with limited resources, which can not be solved easily due to the large size of project network. We propose a function as a minimization of load index which represented the load deviation over time horizon considering the yard production strategy. For the optical parameter setting, we tried various experiments. We verified that the proposed approach was effective to deal with the erection scheduling problem in shipbuilding.
Construction of roof structure, cable suspended structure, for Pusan main stadium is adapted a lifting method that is VSL lifting system. 5 processes are practiced for erection of the roof structure including the first lifting process for erection of upper cables and the second lifting process for erection of lower cables. Since all cables of this roof structure with two open spelter sockets are determined their length, some cable were wrong length, he roof structure would be unstable. But, At complete of erection for the roof structure each cable is attained to theoretical tension force with average 4% errors.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.