Construction of Cable Roof Structure for Pusan Main Stadium

부산종합운동장 주경기장 케이블 지붕구조물의 시공

  • 이주영 (현대건설㈜ 기술연구소) ;
  • 유상현 (현대건설㈜ 기술연구소)
  • Published : 2002.03.15

Abstract

Construction of roof structure, cable suspended structure, for Pusan main stadium is adapted a lifting method that is VSL lifting system. 5 processes are practiced for erection of the roof structure including the first lifting process for erection of upper cables and the second lifting process for erection of lower cables. Since all cables of this roof structure with two open spelter sockets are determined their length, some cable were wrong length, he roof structure would be unstable. But, At complete of erection for the roof structure each cable is attained to theoretical tension force with average 4% errors.

Keywords