• Title/Summary/Keyword: Equipment Efficiency

Search Result 1,753, Processing Time 0.03 seconds

Development of the Rotary Electrostatic Painting Equipment with High Transfer Efficiency (높은 도착효율을 가지는 회전형 정전 도장기기의 개발)

  • Lee, Chan;Cha, Sang-Won;Ho, Kwang-Il
    • The KSFM Journal of Fluid Machinery
    • /
    • v.7 no.6 s.27
    • /
    • pp.7-14
    • /
    • 2004
  • A new electrostatic rotary atomizing painting equipment using air turbine was developed for high transfer efficiency. Based on the overall design requirements of painting equipment, basic design specifications of the equipment parts such as air turbine and atomizing disk ate defined from the present conceptual design model. Air turbine is designed with the section profile of NACA airfoil, and its internal flow field is analyzed by commercial CFD code. Atomizing disk is designed to achieve the ligament type spray of paint with the use of visualization technique. Various experiments and tests are conducted to investigate the spray and the transfer characteristics of newly-designed painting equipment, and the measurement results are compared with the those of conventional painting equipments. The comparison results show the present painting equipment is superior to the conventional ones in the aspects of transfer efficiency and coating surface characteristics.

CONSTRUCTION EQUIPMENT ACTIVITY RECOGNITION FROM ACCELEROMETER DATA FOR MONITORING OPERATIONAL EFFICIENCY AND ENVIRONMENTAL PERFORMANCE

  • Changbum R. Ahn;SangHyun Lee;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.188-195
    • /
    • 2013
  • Construction operations generate a significant amount of air pollutant emissions, including carbon emissions. The environmental performance of construction operations is closely relevant to the operational efficiency of each resource employed, which indicates how efficiently each resource (e.g., construction equipment) is utilized. In this context, monitoring the operational efficiency of construction equipment provides key information in managing and improving the environmental performance and productivity of construction operations. In this paper, we report our efforts to measure the operational efficiency of construction equipment, using low-cost accelerometers. An experimental study and real-world case studies are conducted to demonstrate the feasibility of the proposed approach. The results have shown the potential of this approach as an economically feasible means of monitoring the environmental performance of construction operations.

  • PDF

Automatic Measurement of Construction Equipment Efficiency Using a 11-Axis Composite Sensor (11축 복합센서를 통한 건설기계 효율성 측정 자동화 방안)

  • Kwon, Jae-bum;Cho, Dae-gu;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.59-60
    • /
    • 2012
  • A large-scale construction project relies much on the efficiency of construction equipment. Therefore, efficient and accurate measurement on the productivity of construction equipment is one of important task in the construction industry. Based on the motivation, this paper proposes a 11-axis composite sensor for an automatic measurement of construction equipment. A 11-axis composite sensor is composed of a gyroscope, geomagnetic and accelerometer sensor for the purpose of real-time motion captures of construction equipment. It is expected that the proposed system can save considerable time, effort and cost of measuring a efficiency of construction equipment.

  • PDF

Implementation and Effectiveness of Smart Equipment Engineering System (스마트 설비관리시스템 구축 및 효과분석)

  • Sim, Hyun-Sik
    • Journal of the Semiconductor & Display Technology
    • /
    • v.16 no.3
    • /
    • pp.121-126
    • /
    • 2017
  • EES System support to maximize equipment efficiency by providing real-time information of main equipment which has a significant effect on product quality and productivity, and to prevent equipment failure by detecting equipment abnormality in advance. Smart Equipment Engineering System(S-EES) integrates the activities performed at equipment that are the core of production activities and manages them by system so as to maximize the efficiency of equipment and raise the quality level of products to one level. In other words, when the product is put into the equipment, the recipe is downloaded through the RMS, the recipe is set to the optimal condition through R2R(process control), and the system detects and controls the abnormality of the equipment during operation through the FDC function in real time it means. In this way, we are working with the suitable recipe that matches the lot of product, detecting the abnormality of the equipment during operation, preventing the product from being defective, and establishing a system to maximize the efficiency through real-time equipment management. In this study, we review the present status and problems of equipment management in actual production lines, collect the requirements of the manufacturing line for the PCB line, design and develop the system, The measurement model was studied.

  • PDF

Estimation of Construction Equipment Production Rates: Focus on Efficiency Rate (건설기계 시공능력 산정에 관한 연구 : 작업효율 중심으로)

  • Park, Hee-Sung;Han, Ye Lyeong;Huh, Youngki;Ahn, Bang Ryul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.67-72
    • /
    • 2008
  • Heavy equipment is a very important factor for successful construction implementation. Also, the cost for heavy equipment is a major part of construction cost. Therefore, the estimation of equipment cost is a critical job in the construction planning phase. A formula for production rates shown in 'Standard Unit Labor' has been used to estimate construction equipment capability per hour and cost. Although the performance of equipment has been improved, the efficiency rates in the formula are not updated lately. Therefore, this research performed several site visits to measure construction equipment working time and then calculates the efficiency rates for hydraulic backhoe, loader, and dump truck. The results show that the measured efficiencies of backhoe and loader are higher than current ones and vice versa for dump truck. This research proposes the needs for a standardized calculation formula and systematic and long-term data collection and measurement for updating efficiency rates for heavy equipment.

Evaluation for Operational Efficiency of Road Management Equipment using Analytical Hierarchy Process (계층분석법을 이용한 도로관리장비 운영의 효율성 평가)

  • Yang, Choong-Heon;Kim, In-Su
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.157-164
    • /
    • 2012
  • PURPOSES: Regional offices of the Ministry of Land, Transport and Maritime Affairs use a computerized system called KAMIS so as to manage road equipment systematically. Road agencies can record number of operating days by equipment, actual working hours, accumulated operating hours (or distance) by equipment, and operating cost. However, KAMIS does not provide critical information, although it is strongly related to efficient road management equipment operation. In other words, road agencies do not know whether they have sufficient equipment to handle their actual work. METHODS: Therefore, this study suggests a methodology to evaluate for operational efficiency of road management equipment using analytical hierarchy process(AHP). First of all, estimated weights related criteria can be produced by AHP, and then use operational history by pieces of equipment. RESULTS: Results show that importance of management work can differ from weather conditions through five areas. CONCLUSIONS: Commonly, this results can imply to help save money for the purchase and maintenance of road management equipment, and they would improve the functional performance of KAMIS.

Efficiency and Productivity on ICT Industry (ICT 제조업과 서비스업의 효율성과 생산성)

  • Jeong, Boon-Do
    • International Commerce and Information Review
    • /
    • v.16 no.4
    • /
    • pp.55-75
    • /
    • 2014
  • Non-parametric method such as technology efficiency, DEA/Window model and Malmquist Productivity Index (MPI) are used to measure efficiency and productivity of ICT (Information and Communication Technology) manufacturing industry and service industry over the period 2007-2011. The results of this paper indicate following: (1) Technology efficiency of the ICT manufacturing industry were found as the range of 0.34 and 0.39 over the sample period. Technology efficiency of the ICT service industry were found as the range of 0.16 and 0.20 over the sample period. (2) The geometric average of the Malmquist TFP indexes on ICT manufacturing industry indicated the productivity improvement an average of 8.3 percent. The geometric average of the Malmquist TFP indexes on ICT service industry indicated the productivity improvement an average of 1.6 percent. (3) TIER analysis result on ICT manufacturing industry showed that optimal bench marking made by storage devices${\rightarrow}$wireless communication equipment${\rightarrow}$broadcasting equipment${\rightarrow}$radio, recording and playback devices${\rightarrow}$computers, printers, video and audio-visual equipment path. TIER analysis result on ICT service industry indicated that optimal bench marking made by computers and packaged software${\rightarrow}$wired communication${\rightarrow}$communication, information, detection equipment${\rightarrow}$consulting and construction for computer systems integration${\rightarrow}$industrial machinery and equipment rental${\rightarrow}$telecommunications reseller${\rightarrow}$system software development and delivery${\rightarrow}$hosting path.

  • PDF

A Study of the Effect of Hotel Kitchen Facilities on Production Efficiency (호텔주방설비가 직무만족, 자기유능감, 생산효율에 미치는 영향에 관한 연구)

  • Kim, In-Hwan;Park, Heon-Jin;Jung, Jin-Woo
    • Culinary science and hospitality research
    • /
    • v.13 no.1 s.32
    • /
    • pp.235-243
    • /
    • 2007
  • The results of hotel management have revealed a lot of problems in regard to the suitable placement of kitchen facilities, equipment and utensils, appropriate positioning of kitchen workers, and management of kitchen supplies. To solve these problems, this study examined the relationships among kitchen equipment, layouts, job satisfaction, a sense of self-competence, and production efficiency, proposing the efficient management measures of a reasonable kitchen system. The following are the results. Kitchen facilities had a significant effect on job satisfaction, not on a sense of self-competence. Hotel cooks' awareness of kitchen utensils as well as kitchen layouts had significant influence on both job satisfaction and a sense of self-competence whereas hotel cooks' job satisfaction and their sense of self-competence had great influence on production efficiency.

  • PDF

The NPS Analysis and CSO Management Based on SWMM for Oncheon Basin (SWMM 모형을 이용한 비점오염 분석 및 CSO 관리방안 연구 - 부산시 온천천 유역 대상 -)

  • Shin, Hyun Suk;Son, Jeong Hwa;Jang, Jong Kyung;Shon, Tae Seok;Kang, Dookee;Cho, Dukjoon
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.268-280
    • /
    • 2009
  • Oncheon basin which are located in Busan is divided into 43 basin on the basis of main pipe, constructed with Storm Water Management Model (SWMM). Occurrence situation for Outflow and pollutant loads by long-term continuous rainfall is examined for treatment district and river analysis point of Oncheon basin and a reduction vs effectiveness table for effective CSOs managements is made for each of treatment districts according to each of managements. In case that treatment equipment is located at the discharge point of CSO, treatment efficiency is analysed. It is supposed that treatment equipment have an efficiency on the basis of a concentration and runoff discharge over a critical flow is discharged with it untreated and treating runoff discharge with treatment equipment at each of runoff discharge points and treating it gathered at sewage treatment plant (STP) through trunk sewer is compared for a relative treatment efficiency.

Investigation on Construction Process and Efficiency of Underwater Construction Equipment for Rubble Mound Leveling works (수중 고르기 장비의 건설 공정 및 효율성 분석)

  • Won, Deokhee;Jang, In-Sung;Shin, Changjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.372-378
    • /
    • 2016
  • A mound was constructed to install a caisson and sofa blocks underwater. The mound riprap, which were of uniform grade, size, shape, and specific gravity, formed the foundation for the support superstructure. Also, rubble leveling works were performed before installing structures such as caissons. In this study, underwater construction equipment was developed with a remotely controlled operating system and underwater environment monitoring system for unmanned underwater rubble leveling work. The performance of the developed equipment was verified using on-land and underwater tests. In addition to the performance verification, the construction process and economic efficiency of the equipment should be checked before applying it to the real construction field for commercial purposes. In this paper, a construction process using the developed equipment was proposed and compared with the existing rubble leveling method. The results demonstrated that the new construction method has higher economic efficiency and safety than the existing construction method.