• Title/Summary/Keyword: Environmental load

Search Result 3,394, Processing Time 0.034 seconds

Integration of Total Pollution Load Management System and Environmental Impact Assessment related System (수계 오염총량관리제와 환경영향평가제도의 통합운영방안)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.5
    • /
    • pp.359-367
    • /
    • 2003
  • The total pollution load management system of watershed has been implemented upon Special Law pertaining to the Han River Watershed Water Quality Improvement and Residents Support, Special Law pertaining to the Nakdong River Watershed Water Management and Residents Support, Special Law pertaining to the Youngsan River Watershed Water Management and Residents Support, and Special Law pertaining to the Seomjin River Watershed Water Management and Residents Support in Korea since 2002. But many other similar systems with total pollution load management system of watershed are being operated separately or independently, even though its purpose is nearly same with those of the total maximum pollutants load management in Law on Water Quality Environmental Protection, environmental impact assessment(EIA) in Law of Impact Assessment on Environment, Transportation and Disaster and Pre-environmental assessment of Environmental Policy Act. Therefore the contents of total pollution load management system of watershed and many other related systems could be overlapped and at some times have inconsistency among them. This study suggests first the integrated operation of total pollution load management system of watershed, EIA, pre-environmental assessment, urban planning, and sewage planning and secondly EIA system development by integration of EIA and pre-environmental assessment and strategic environmental assessment(SEA).

A Study on the Final Evaluation Criteria of Allocation Exceedance Regional in Total Maximum Daily Load (오염총량관리 할당부하량 초과지역의 최종 평가기준에 관한 연구)

  • Oh, Seung Young;Han, Mideok;Kim, Seok Gyu;Ahn, Ki Hong;Kim, Oksun;Kim, Yong Seok;Park, Ji Hyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.5
    • /
    • pp.450-457
    • /
    • 2016
  • The Total Maximum Daily Load (TMDL) is a watershed management system that involves the establishment of the target water quality, the calculation of permission loading (allocation loading), and the control of total pollutants for each unit watershed. Allocation loading is assessed through the comprehensive implementation assessment of the previous year's plan. Assessment results are used for follow-up management measures such as the limit of development and updating of TMDL Management Implementation Plans for the next planning period. Although detailed assessment criteria are important, they are not currently available. Therefore, we suggested assessment criteria by comparing two methods('integration method' and 'separation method') using combination point and non-point discharge loading. We also examined the penalty criteria considering controllable load local government and updating methods of the TMDL Management Implementation Plan for the next planning period.

Anlysis of the Environmental Load Impact Factors for IPC Girder Bridge Using Principal Component Anlysis (주성분 분석을 활용한 IPC 거더교의 환경부하량 영향요인 분석)

  • Kim, Joon-Soo;Jeon, Jin-Gu;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.46-54
    • /
    • 2018
  • In the 21st century, the Earth has continued its efforts to reduce carbon emissions to overcome the crisis caused by climate change. The construction industry, which is a representative industry that produces large amounts of the environmental load during construction, should actively reduce the amount of the environmental load. From the planning stage of the construction facility, it is necessary to consider the environmental load such as route selection and structure type selection to reduce the environmental load. However, the environmental load can be estimated based on the input resource amount. However, in the planning stage, it is difficult to accurately calculate the environmental load due to lack of information on the construction amount. The purpose of this study is to select the environmental load factors for IPC girder bridges to be used in the environmental load estimation model in the planning stage. Specific information related to the environmental load was selected from a list of information available in the planning stage, reflecting the Life Cycle Assessment(LCA), correlation, principal components analysis and expert opinion. The list of selected planning stage information is 10 such as span length and bridge extension, and it is expected to be used as a basic data for the future development of environmental load estimation model.

Rainfall Effects on Discharged Pollution Load in Unit Watershed Area for the Management of TMDLs (수질오염총량관리 배출부하량에 대한 강우영향 분석연구)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.648-653
    • /
    • 2010
  • Discharged pollution load for the management of Total Maximum Daily Loads (TMDLs) is calculated on the basis of rainfall data for reference year. Rainfall has an influence on discharged pollution load in unit watershed with combined sewer system. This study reviewed the status of discharged pollution load and rainfall conditions. We also investigated rainfall effects on discharged pollution load by analyzing change of the load in accordance with increase of rainfall. The change ratio of discharged pollution load was 18.6% while inflow load only 5.8% for 5 years from 2004 to 2008 in Daejeon district. The greatest rainfall and rain days were over 2 times than the least during the period. This change in rainfall could have great effect on discharged pollution load. The analysis showed that discharged pollution load increased 2.1 times in case rainfall increased 2 times and 1.2 times in case rain days increased 2 times. Rainfall effects, therefore, should be considered to make resonable evaluation of discharged pollution load in the assessment of annual performances.

A Study on the Allocation of Permissible Water Pollution Load in the Total Water Pollution Load Management Plan (수질오염 총량관리계획과정의 오염부하량 할당에 관한 연구 - 경기도 광주시를 사례로 -)

  • Kim, Sie-Heon;Rim, Jay-Myung
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.337-346
    • /
    • 2005
  • Pollution load allocation can likely be much controversial, which is essential to formulate the total water pollution load management plan. Existing rules(or guidances) in Korea, can provide no specific criteria for load allocation. Therefore, this paper studied(comprehensively) possible standards how or why to choose any particular allocation method, which was applied in the Gwangju City's load allocation for the satisfaction of set water quality goal. This load allocation is basically focused on the load reduction of domestic wastewater rather than industrial wastewater, because the land-use is strictly regulated and larger sources of pollution are few in the Gwangju City. This paper recommends the city to increase the capacity of sewage treatment plants, promote sewerage maintenance, and set higher effluent standards.

Excessive State of Pollutant Load Allocation and Penalty Application Schemes based on Pollutant Reduction Plan Types for Solving Excessive Problem of Allocation (오염할당부하량의 초과현황 및 초과해소를 위한 삭감계획 유형에 따른 페널티 적용방안)

  • Park, Jae Hong;Park, Bae Kyoung;Oh, Seung Young;Hwang, Ha Sun;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.66-73
    • /
    • 2013
  • Total Maximum Daily Loads (TMDLs) system was introduced to manage pollution load of watershed and to improve water quality of unit watershed so that it is possible to protect dringking water soureces. Load allocation observation is the most important factor in TMDLs system. Because if load allocation is not observed, it is difficult to achieve water quality goal of unit watershed. Also it is impossible to improve water quality of the drinking water sources. Therefore it is necessary to apply some kind of sanctions (penalty) in case of excess of load allocation. The sanctions have to be, however, applied differently based on various reduction plan types, i.e., using the reduction load planed in 2nd phase, delay the completion, additional reduction in 2nd phase, error of the pollution sources, etc. Moreover, the penalty load should be properly imposed, lest it should be overburden the provence. The reduction load trade inter province must be restrictively permmitted only the same unit watershed.

A Study on Improved Allocations of Permissible Water Pollution Load at the Implementing Stage of Tatal Water Pollution Load Management Plan (수질오염총량관리계획의 시행단계에서 오염부하량 할당방안 개선에 관한 연구)

  • Kim Sie-Heon;Rim Jay-Myung
    • Journal of environmental and Sanitary engineering
    • /
    • v.20 no.3 s.57
    • /
    • pp.51-56
    • /
    • 2005
  • Allocation of water pollution load from loading capacity can be much essential, controversial, and its standards can be applied case-by-case to the various situations. Allocation methods to point sources are generally 'Equal effluent concentration', 'Equal percent Treatment', Loading capacity at planning stage consists of basic pollution load, development pollution load, reserved pollution load and margin of safety. But at the implementing stage loading capacity can be consisted of allocatable load and margin of safety to give more flexibility in the total water pollution load management plan. In that case, we can re-adjust and altogether use the pollution load of point sources of series and non-point sources at the implementing stage.

A study on the optimal configuration of harbor structure under the combined loads

  • Cho, Kyu-Nam
    • Structural Engineering and Mechanics
    • /
    • v.32 no.3
    • /
    • pp.371-382
    • /
    • 2009
  • Response of harbor structure to environmental loads such as wave load, impact load, ship's contacting load, is a fundamental factor in designing of the structure's optimal configuration. In this paper, typical environmental loads against coastal structures are investigated for designing of the optimal harbor structure. Loads to be considered here are wave load, impact load and contacting load due to ship mooring. Statistical analysis for several harbor structure types under the corresponding loads is carried out, followed by investigation of effect of individual environmental load. Based on these, the optimal configuration for the harbor structure is obtained after considerable engineering process. Estimation of contacting load of the ship is suggested using effective energy concepts for the load, and analysis of structural behavior is done for the optimal designing of the structure in the particular load. A guideline for the design process of the harbor structure is established, and safety of the structure is examined by proposed scheme. For verification of the analytical approach, various steel-piled coastal structures and caissons are chosen and relevant structural analyses are carried out using the Finite Element Methods combined with MIDAS/GTS and ANSYS code. It is found using the Morison equation that impact load cannot be a major load in the typical harbor structure compared with the original wave load, and that configuration shape of the structure may play an important role in consideration of the response criteria.

The Life Cycle Assessment of Infrastructure considering Environmental Load;A Case Study of Emergency Spillway for Korean Multipurpose Dam (환경부하량을 고려한 토목시설물 전과정평가;국내 다목적댐 비상여수로 시설 사례연구)

  • Kwun, Suk-Hyun;Kim, Sang-Kywi;Jung, Won-Ji;Kim, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.519-522
    • /
    • 2006
  • This study aims to provide useful information when making a decision for the environmental assessment of infrastructure, based on Life Cycle Assessment(LCA). It estimates environmental load on environmental pollutants that are possible to occur by locations and by types of emergency spillway for Korean multipurpose dam, which is selected as a study case. For this purpose, this study examines the theories of LCA and calculates environmental load on environmental pollutants that generate during life cycle, to apply the suggested infrastructure to the case study of emergency spillway at the multipurpose dam. It also evaluates environmental load of emergency spillway by the estimated result, and draws the optimum alternative that is environmental friendly.

  • PDF

Comparison of Environmental Load per Constructional Methods (Focus on Reinforced Concrete Structures and Steel-Frame Structures) (구조공법별 환경부하 산출·비교분석에 관한 연구 (철근콘크리트구조와 철골구조를 중심으로))

  • Moon, Joon-Ho;Lee, Hyun-Joo;Jung, Young-Chul;Kim, Tae-Hee;Kim, Kwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.193-195
    • /
    • 2011
  • Nowadays, climatic environment change has become a major issue in the world. This causes major emissions of carbon dioxide industries steel industry, thermal power industry, cement industry is essential in the reduction of carbon dioxide, which is based on total carbon dioxide emissions account for most of the construction industry in an effort to minimize the environmental load is needed. accordingly, through case studies, It can be induce the selection to minimize environmental load by comparing the output of quantitative energy consumption and carbon dioxide emissions per constructional methods. As a result of this study, RC Structure was less environmental load than SC structure.

  • PDF