• 제목/요약/키워드: Emergency plan

검색결과 486건 처리시간 0.023초

철도화재 안전개선대책수립을 위한 위기관리프로그램 개발 연구 (A study on the development of emergency management program for railway fire safety improvement)

  • 왕종배;곽상록;홍선호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.235-240
    • /
    • 2003
  • In this paper, the fire safety management plan and the emergency action program for the railway safety improvement were reviewed. In the fire safety management plan, a series of preventive methods answering to such as a smoke exhaust installation, a fire warning device and a guide inducement will be come into preparation. Also, the damage reducing methods such as complement of fire safety equipments, establishment of refuge & escape system, consolidation of real-time control on fire response and operation procedure will be required for early repressing fire and minimizing fatality.

  • PDF

고관절 탈구 정복 후 발견된 좌골 신경 마비의 자기공명영상을 통한 치료방향 결정: 증례 보고 (Role of MRI in Deciding on a Treatment Plan for Sciatic Nerve Palsy after Reduction of a Hip Dislocation: Case Report)

  • 조준호;여운형;김지완
    • Journal of Trauma and Injury
    • /
    • 제26권3호
    • /
    • pp.229-232
    • /
    • 2013
  • Traumatic fracture-dislocations of the hip frequently result from high-energy injury, and hip dislocations are commonly associated with severe concomitant injuries. Sciatic nerve injury often accompanies traumatic fracture-dislocation of the hip, but neurologic examination at the time of injury is difficult in severely traumatized patients with decreased consciousness. We present such a case of multiple traumas with traumatic hip dislocation and sciatic nerve injury after reduction, and we found that magnetic resonance image (MRI) played an important role in developing a management plan.

국가비상사태에 신속히 대응 할 수 있는 응급구조 의무부사관인력 양성 발전방안 연구 - 현장 Needs를 반영한 학·군 연계 교육프로그램을 중심으로 - (A Study on the Development Plan to quickly respond to a national emergency rescue Medical Non-Commissioned officer workforce - Focusing on the Educational Programs Connecting Academy to Army which Reflects the Site Needs -)

  • 이창훈;복혜정
    • 융합보안논문지
    • /
    • 제16권3_1호
    • /
    • pp.37-45
    • /
    • 2016
  • 본 연구에서는 육군에 근무하는 의무부사관 80명과 의무부사관과 재학생 80명을 대상으로 응급구조 의무부사관에 대한 필요로 하는 능력과 지식 등을 알아보고 응급구조의무부사관의 자질을 갖추기 위한 교육목표 수립과 핵심직무를 선정하고 교과목 도출을 위한 프로세스에 의해 국가비상사태시 신속 대응할 수 있는 응급구조 의무부사관인력 양성 프로그램을 개발 하였다.

응급의료 이송정책에 관한 실증적 연구 (An Empirical Study on Emergency Medical Care Transportation Policy)

    • 한국화재소방학회논문지
    • /
    • 제17권4호
    • /
    • pp.42-56
    • /
    • 2003
  • 본 연구에서는 우리나라의 응급의료 이송정책을 구성하고 있는 병원 전 단계인 응급환자 발생에서 현장의 응급처치 단계, 환자의 이송단계, 통신망 구축단계 등의 상호 유기적인 협조체계의 기틀 속에서 119구급대원을 대상으로 직무와 관련된 일반적인 내용을 중심으로 설문조사를 실시하여 분석한 결과, 발생된 문제점으로는 구급대원들이 의료분쟁에 휘말리지 않도록 제도적 장치를 마련하여야하고, 그리고 응급 구호장비의 현대화, 구급전문 요원의 확보, 적절한 인력배치가 이루어져야 되는 것으로 조사되었다. 따라서 응급의료 이송체계를 현실적 환경에 적합한 모형으로 개선하기 위하여 구조와 기능적인 측면에 초점을 맞추어 그 정책 방안을 제안하고자 한다.

Considerations of the Optimized Protective Action Distance to Meet the Korean Protective Action Guides Following Maximum Hypothesis Accidents of Major KAERI Nuclear Facilities

  • Goanyup Lee;Hyun Ki Kim
    • Journal of Radiation Protection and Research
    • /
    • 제48권1호
    • /
    • pp.52-57
    • /
    • 2023
  • Background: Korea Atomic Energy Research Institute (KAERI) operates several nuclear research facilities licensed by Nuclear Safety and Security Commission (NSSC). The emergency preparedness requirements, GSR Part 7, by International Atomic Energy Agency (IAEA) request protection strategy based on the hazard assessment that is not applied in Korea. Materials and Methods: In developing the protection strategy, it is important to consider an accident scenario and its consequence. KAERI has tried the hazard assessment based on a hypothesis accident scenario for the major nuclear facilities. During the assessment, the safety analysis report of the related facilities was reviewed, the simulation using MELCOR, MACCS2 code was implemented based on a considered accident scenario of each facility, and the international guidance was considered. Results and Discussion: The results of the optimized protective actions were 300 m evacuation and 800 m sheltering for the High-Flux Advanced Neutron Application Reactor (HANARO), the evacuation to radius 50 m, the sheltering 400 m for post-irradiation examination facility (PIEF), 100 m evacuation or sheltering for HANARO fuel fabrication plant (HFFP) facility. Conclusion: The results of the optimized protective actions and its distances for the KAERI facilities for the maximum postulated accidents were considered in establishing the emergency plan and procedures and implementing an emergency exercise for the KAERI facilities.

A Bundled Educational Solution to Reduce Incorrect Plaster Splints Applied on Patients Discharged from Emergency Department

  • Chia Wei Jennifer Ting;Shu Fang Ho;Fatimah Lateef
    • 한국의료질향상학회지
    • /
    • 제29권2호
    • /
    • pp.64-84
    • /
    • 2023
  • Purpose:Plaster splints are routinely performed in the Emergency Department (ED) and avoidable complications such as skin ulcerations and fracture instability arise mainly due to improper techniques. Despite its frequent use, there is often no formal training on the fundamental principles of plaster splint application for a medical officer rotating through ED. We aim to use Quality Improvement (QI) methodology to reduce number of incorrect plaster splint application to improve overall patient care via a bundled educational solution. Methods: We initiated a QI program implementing concepts derived from the Institute for Healthcare Improvement models, including Plan-Do-Study-Act (PDSA) cycles, to decrease the rate of incorrect plaster splint application. A bundled education solution consisting of three sequential interventions (practical teaching session, online video lecture and quick reference cards) were formulated to specifically target critical factors that had been identified as the cause of incorrect plaster splints in ED. Results: With the QI intervention, our overall rate of incorrect plaster splints was reduced from 84.1% to 68.6% over a 6-month period. Conclusion: Following the QI project implementation of the bundled educational solution, there has been a sustained reduction in incorrect plaster splints application. The continuation of the training program also ensures the sustainability of our efforts in ED.