• 제목/요약/키워드: Electricity Supply

검색결과 649건 처리시간 0.024초

자동전원 계폐장치에 관한 연구 (Study on Divice for the Automatic Shut Off of Equipment Stand-by Power)

  • 김형광;현기웅;배종일;양순용;박성태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 F
    • /
    • pp.2626-2627
    • /
    • 1999
  • The device we have developed is the automatic shut off equipment which will reduce energy consumption when an equipment is in stand by power state. The principle for this system is when a man is moving, electricity will flow by setting a on-off light system. At night, in the stand-by power state the electric supply will be shut off immediately which will reduce energy consumption. Energy consumed by 24hour operating machines and stand-by electronic devices will be reduced by pulse signals which will give power supply when needed.

  • PDF

전력산업 인력수급 예측모형 개발 연구

  • 이용석;이근준;곽상만
    • 한국시스템다이내믹스학회:학술대회논문집
    • /
    • 한국시스템다이내믹스학회 2006년도 춘계학술대회 발표논문집
    • /
    • pp.101-122
    • /
    • 2006
  • A series of system dynamics model was developed for forecasting demand and supply of human resource in the electricity industry. To forecast demand of human resource in the electric power industry, BLS (Bureau of Labor Statistics) methodology was used. To forecast supply of human resource in the electric power industry, forecasting on the population of our country and the number of students in the department of electrical engineering were performed. After performing computer simulation with developed system dynamics model, it is discovered that the shortage of human resource in the electric power industry will be 3,000 persons per year from 2006 to 2015, and more than a double of current budget is required to overcome this shortage of human resource.

  • PDF

대용량 MCFC 발전시스템의 비상부하 전력 공급 장치 설계 및 제어 기법 (Design and Control Method for Critical Load Supply Equipment of MCFC Electricity Generation Systems)

  • 김동희;김종수;이병국;곽철훈;차인호
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2010년도 하계학술대회 논문집
    • /
    • pp.200-201
    • /
    • 2010
  • 본 논문에서는 동특성이 매우 느린 용융탄산염 연료전지 (Molten Carbonate Fuel Cell, MCFC) 스택이 계통 사고 시 추가적인 UPS (Uninterruptible Power Supply) 없이 비상부하로 전력 공급이 가능하고, 사고 제거 후 즉시 정격전력 발전하여 계통으로 주입할 수 있는 비상부하 추종형 백업 시스템을 제안한다. 제안된 MCFC 발전 시스템용 비상부하 추종형 백업 시스템은 3상 인버터로 구성된 PCS (Power Conditioning System) 출력단에 3상 PWM 컨버터를 연결한 구조이고, 비상부하 추종 및 부하량 조절이 가능한 추가적인 제어 알고리즘으로 PWM 컨버터를 제어한다. 제안된 비상부하 추종형 백업 시스템의 회로와 제어 알고리즘의 타당성을 컴퓨터 시뮬레이션을 통하여 검증한다.

  • PDF

배전용 변압기 단락강도 시험설비 개발 (Development of Short-circuit Testing Facility for Distribution Transformers)

  • 박지훈;민윤홍;강영학;유호근;안규선;함길호;오창주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.64-67
    • /
    • 2002
  • To increase the short-circuit testing capacity of distribution transformers, testing facility has been installed for KEPCO in Vi-wang. The power supply of testing facility is directly supplied from the network substation located closely. Testing can be performed up to 300 kVA for single-phase transformers, 500 kVA for three-phase transformers. Operating with this facility, the distribution company is able to maintain the reliable supply of electricity. Also the critical quality of transformers from manufacturers can be verified by short-circuit testing. This paper describes the design concept and specification of newly developed equipment and the procedure of short-circuit test.

  • PDF

기어형 높이 조절식 맨홀 개발 (Development of a Gear-shaped Manhole with Height Adjustment)

  • 김창호;박준홍;최정일
    • 한국산업융합학회 논문집
    • /
    • 제7권1호
    • /
    • pp.63-68
    • /
    • 2004
  • There are a lot of manholes such as for water supply, sewage, telecommunication cable, traffic sign, electricity supply, and rainwater, etc. Conventional manholes installed on a road are impossible to adjust height, so that they should be entirely excavated to reinstall or repair. This entire excavation of a manhole causes too much time-consuming work, waste of resources, and obstruction of traffic. In this study, in order to solve the above mentioned problems, a cover, outer and inner parts of a manhole are integrated by gear-shaped parts located between outer and inner parts of a manhole. Mechanical design is performed to determine dimension of gear-shaped parts by Taguchi orthogonal array table. Cast molds for a gear-shaped manhole are also manufactured.

  • PDF

전력산업 인력수급 예측모형 개발 연구 (The Study on the Human Resource Forecasting Model Development for Electric Power Industry)

  • 이용석;이근준;곽상만
    • 한국시스템다이내믹스연구
    • /
    • 제7권1호
    • /
    • pp.67-90
    • /
    • 2006
  • A series of system dynamics model was developed for forecasting demand and supply of human resource in the electricity industry. To forecast demand of human resource in the electric power industry, BLS (Bureau of Labor Statistics) methodology was used. To forecast supply of human resource in the electric power industry, forecasting on the population of our country and the number of students in the department of electrical engineering were performed. After performing computer simulation with developed system dynamics model, it is discovered that the shortage of human resource in the electric power industry will be 3,000 persons per year from 2006 to 2015, and more than a double of current budget is required to overcome this shortage of human resource.

  • PDF

Characteristics of Superposed Discharge type Ozonizer by Variation of Inner Dielectric Vacuum

  • Chun, Byung-Joon;Lee, Kwang-Sik;Song, Hyun-Jig
    • KIEE International Transactions on Electrophysics and Applications
    • /
    • 제3C권6호
    • /
    • pp.230-235
    • /
    • 2003
  • In this paper, a superposed discharge type ozonizer with an internal dielectric that can be made into a vacuum tube has been designed and fabricated. Ozone generation and discharge characteristics have been investigated in accordance with output voltage of power supply, flow-rate, discharge power and vacuum of inside internal dielectric. Pure oxygen was used as the supply gas of the ozonizer. Ozone concentration and ozone generation are gradually increased when discharge power is increased at the same flow-rate and they are both proportional to the vacuum level. As such, the maximum ozone concentration of 8840 ppm was obtained at vacuum 0.1 Torr and flow-rate 0.5 $\ell$/min.

한국형 통합자원계획을 위한 다속성 의사결정 (Integrated Resource Planning using Multi-Attribute Decision Analysis)

  • 김창수;권영한
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 B
    • /
    • pp.546-549
    • /
    • 1995
  • Recently, electric utility is facing substantially new stream of business environment, such as pressure of business restructuring, competition with private IPPs, diversification of supply-side and demand-side resource options, environmental externalities and uncertainties. Integrated resource planning(IRP) is very useful and powerful approach for solving complex and diversified electricity supply and demand problems. This paper presents a standardized IRP procedure using multi-attribute decision analysis approach. The selection of the most desirable plan is based on multi-attribute trade-off/risk analysis method and score ranking method. As a case study, 50 plans with 12 scenarios are analyzed.

  • PDF

높이 조절식 맨홀 개발에 관한 연구 (A Study on Development of a Manhole with Height Adjustment)

  • 김창호;박준홍
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2004년도 춘계학술대회
    • /
    • pp.710-715
    • /
    • 2004
  • There are a lot of manholes such as for water supply, sewage, telecommunication cable, traffic sign, electricity supply, and rainwater, etc. Conventional manholes installed on a road are impossible to adjust height, so that they should be entirely excavated to reinstall or repair. This entire excavation of a manhole causes too much time-consuming work, waste of resources, and obstruction of traffic. In this study, in order to solve the above mentioned problems, a cover, outer and inner parts of a manhole are integrated by gear-shaped parts located between outer and inner parts of a manhole. Mechanical design is performed to determine dimension of gear-shaped parts by Taguchi orthogonal array table. Cast molds for a gear-shaped manhole are also manufactured.

  • PDF

풍력 발전시스템의 효율적인 연계운전을 위한 0.5MW급 PCS 개발 (Development of a 0.5MW PCS for efficient connection operation of wind power system)

  • 이윤재;최은식;이충우;류강열;조장호;이진
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2012년도 전력전자학술대회 논문집
    • /
    • pp.498-500
    • /
    • 2012
  • According to the climatic characteristics of the wind power output is difficult to predict and a severe strain due to a change in output has been very influential in the grid. Jeju Hangwon wind farm, many of the wind generator is installed in a wide area because it is not have this device that artificially Smoothing is needed. In addition, By the requirements of the power company active power supply / control and improve power system reliability and energy storage during the peak demand for electricity using the energy stored in the power supply is needed. In this paper, Unit 12 in Jeju Hangwon demonstrated 0.5MW PCS and energy storage system associated with the wind through the stabilization of output and the leveling of output and test results will be introduced.

  • PDF