• Title/Summary/Keyword: Electricity Supply

Search Result 648, Processing Time 0.027 seconds

Analysis of Effective Soil Thermal Conductivities and Borehole Thermal Resistances with a Power Supply Regulation (부하변동에 의한 지중유효열전도도와 보어홀 전열저항 해석)

  • Ro, Jeong-Geun;Yon, Kwang-Seok;Song, Heon
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.4
    • /
    • pp.80-86
    • /
    • 2011
  • Investigation of the effective soil thermal conductivity(k) is the first step in designing the ground loop heat exchanger(borehole) of a geothermal heat pump system. Another important factor is the borehole thermal resistance($R_b$). Thermal response tests offer a good method to determine the ground thermal properties for the total heat transport in the ground. This is done by supplying a constant heat power into a borehole heat exchanger. There are two methods to supply a constant heat power. One is to employ the electricity provided by Korea Electric Power Corporation(KEPCO). The other is to use electricity generated by a generator. In this study, the power supply regulation was found to reduce when the electricity generated by the generator was used. This is because the generator evaluated with the power supply characteristically reduces the power supply regulation between an overload and a complex using. But it sometimes occurs a power supply regulation in In-situ thermal response test. In this case getting of k,$R_b$ requires delay times and restored normal state. However, the effect of the delay times and restored normal state on the soil thermal conductivity and borehole thermal resistance is very small. Therefore it is possible to use a generally accepted delay times and restored normal state in the analysis. In this work, it is also shown that an acceptable range of ${\Delta}k$, ${\Delta}R_b$ for normal state and regulation state might be approximately 0.01-0.16W/m k, and -0.004-0.007m K/W, respectively. Thus, restored normal state of power supply regulation is valuable to recommend.

Development of System Dynamics model for Electric Power Plant Construction in a Competitive Market (경쟁체제 하에서의 발전소 건설 시스템 다이내믹스 모델 개발)

  • 안남성
    • Korean System Dynamics Review
    • /
    • v.2 no.2
    • /
    • pp.25-40
    • /
    • 2001
  • This paper describes the forecast of power plant construction in a competitive korean electricity market. In Korea, KEPCO (Korea Electric Power Corporation, fully controlled by government) was responsible for from the production of the electricity to the sale of electricity to customer. However, the generation part is separated from KEPCO and six generation companies were established for whole sale competition from April 1st, 2001. The generation companies consist of five fossil power companies and one nuclear power company in Korea at present time. Fossil power companies are scheduled to be sold to private companies including foreign investors. Nuclear power company is owned and controlled by government. The competition in generation market will start from 2003. ISO (Independence System Operator will purchase the electricity from the power exchange market. The market price is determined by the SMP(System Marginal Price) which is decided by the balance between demand and supply of electricity in power exchange market. Under this uncertain circumstance, the energy policy planners such as government are interested to the construction of the power plant in the future. These interests are accelerated due to the recent shortage of electricity supply in California. In the competitive market, investors are no longer interested in the investment for the capital intensive, long lead time generating technologies such as nuclear and coal plants. Large unclear and coal plants were no longer the top choices. Instead, investors in the competitive market are interested in smaller, more efficient, cheaper, cleaner technologies such as CCGT(Combined Cycle Gas Turbine). Electricity is treated as commodity in the competitive market. The investors behavior in the commodity market shows that the new investment decision is made when the market price exceeds the sum of capital cost and variable cost of the new facility and the existing facility utilization depends on the marginal cost of the facility. This investors behavior can be applied to the new investments for the power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate production. A computer model was developed to sturdy the possibility that construction will appear in waves of boom and bust in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester(MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford(Energy Policy, 1999). This model was designed based on the Energy Policy results(Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach. Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as unclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investment by investors in the market. This model may be used to learn if government investment in new unclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of unclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market.

  • PDF

Analysis of Power Supply Cost According to Nuclear and Renewable Energy Policies (원전 및 신재생에너지 정책에 따른 전력공급비용 분석)

  • Woo, Pil Sung;Kim, Kang-won;Hwang, Soon-hyun;Kim, Balho H.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.16-21
    • /
    • 2018
  • As a result of the Fukushima disaster and climate change due to excessive greenhouse gases, international energy affairs are currently focused on establishing safe and environment-friendly policies. To achieve this, Republic of Korea has established a plan for environment-friendly energy supplies. It is expected that policy enforcement will be accompanied by an increase in energy supply costs. An analysis of energy supply costs is necessary before the establishment of any national energy policy. This paper analyzes and compares the energy supply costs accompanying environmental and nuclear energy policies, based on the Korean National Energy Master Plan and the Basic Plan for Long-Term Electricity Supply and Demand, in order to understand the implications of these national energy policies.

Analysis of Electricity Price Cap Transacted via Interstate Electric Power System in Northeast Asia (동북아 전력계통 연계를 통한 융통전력 도입 시 가격상한 수준에 대한 분석)

  • Chung, Koo-Hyung;Kim, Hong-Geun;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.772-774
    • /
    • 2005
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. Moreover, since Korean electric power system has a great difficulty in a geographical condition to interrupt electricity transaction with other countries, it has been expanded as an independent system to supply all demand domestically. As a result, Korean electric power system makes considerable payment for maintaining system security and reliability and expands costly facilities to supply a temporary summer peak demand. Under this inefficiency, if there are electricity transactions with Russia via the North Korea route then economic electric power system operation may be achieved using seasonal and hourly differences in electricity price and/or load pattern among these countries. In this paper, we estimate price cap of transacted electricity via interstate electric power system in northeast asia. For this study, we perform quantitative economic analysis on various system interconnection scenarios.

  • PDF

A Study on the Participation of Virtual Power Plant Based Technology Utilizing Distributed Generation Resources in Electricity Market (분산발전자원을 활용한 가상발전소 기반 기술의 전력시장 참여 방안에 대한 연구)

  • Lee, Yun-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.2
    • /
    • pp.94-100
    • /
    • 2016
  • A virtual power plant (VPP) technology is a cluster of distributed generation installations. VPP system is that integrates several types of distributed generation sources, so as to give a reliable overall power supply. Virtual power plant systems play a key role in the smart grids concept and the move towards alternative sources of energy. They ensure improved integration of the renewable energy generation into the grids and the electricity market. VPPs not only deal with the supply side, but also help manage demand and ensure reliability of grid functions through demand response (DR) and other load shifting approaches in real time. In this paper, utilizing a variety of distributed generation resources(such as emergency generator, commercial generator, energy storage device), activation scheme of the virtual power plant technology. In addition, through the analysis of the domestic electricity market, it describes a scheme that can be a virtual power plant to participate in electricity market. It attempts to derive the policy support recommendation in order to obtain the basics to the prepared in position of power generation companies for the commercialization of virtual power plant.

Estimation of Electricity Price of the Imported Power via Interstate Electric Power System in North-East Asia (동북아 전력계통 연계를 통한 융통전력 도입 시 가격상한 수준에 대한 분석)

  • Kim, Hong-Heun;Chung, Koo-Hyung;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.3
    • /
    • pp.128-132
    • /
    • 2006
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. Moreover, since Korean electric power system has a great difficulty in a geographical condition to interrupt electricity transaction with other countries, it has been expanded as an independent system to supply all demand domestically. As a result, Korean electric power system makes considerable payment for maintaining system security and reliability and expands costly facilities to supply a temporary summer peak demand. Under this inefficiency, if there are electricity transactions with Russia via the North Korea route then economic electric power system operation nay be achieved using seasonal and hourly differences in electricity price and/or load pattern among these countries. In this paper, we estimate price cap of transacted electricity via interstate electric power system in northeast asia. For this study, we perform quantitative economic analysis on various system interconnection scenarios.

Load Control between PV Power Plants and Diesel Generators

  • Mohamed Khalil Abdalla MohamedAli;AISHA HASSAN ABDALLA HASHIM;OTHMAN KHALIFA
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.6
    • /
    • pp.33-40
    • /
    • 2024
  • Introducing renewable energy sources, such as wind and photovoltaic arrays, in microgrids that supply remote regions with electricity represents a significant leap in electricity generation. Combining photovoltaic panels and diesel engines is one of the most common ways to supply electricity to rural communities. Such hybrid systems can reduce the cost of electricity generation in these remote power systems because they use free energy to balance the power generated by diesel engines. However, the combination of renewable energy sources and diesel engines tends to complicate the sizing and control of the entire system due to the intermittent nature of renewable energy sources. This study sought to investigate this issue in depth. It proposes a robust hybrid controller that can be used to facilitate optimum power sharing between a PV power source and diesel generators based on the dynamics of the available PV energy at any given time. The study also describes a hybrid PV-diesel power plant's essential functional parts that produce electricity for a microgrid using a renewable energy source. Power control needs to be adjusted to reduce the cost of power generation.

Development of Vending Machine for Electricity Based on Z-Wave Mesh Network (Z-Wave 메쉬 네트워크 기반의 전기 자판기 개발)

  • Kang, Ki-beom;Ahn, Hyun-kwon;Kim, Han-soo;Lee, Seung-hyun;Jwa, Jeong-woo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.10
    • /
    • pp.1256-1262
    • /
    • 2016
  • As the population of camping is increased in campsites and auto camp sites, the electrical equipment can safely supply electricity to users in a variety of electricity bill policy is required in the campsite. In this paper, we develop the vending machine for electricity that can control the outdoor electrical outlet from the management server using the Z-Wave WPAN and android mobile application. The developed vending machine for electricity consists of the management server, the controller, the outdoor outlet box, and the mobile application. The management server provides reservation and electricity bill payment to users. The management server controls the electrical outlet box through the controller to safely supply electricity to users. The controller that is a relay device between the management server and the switch controls switches based on Z-Wave mesh network. Outdoor electrical outlet box has 2 meter switches. We receive the relevant authorization to provide commercial electricity services using the outdoor electrical outlet box in the campsite.

Assessment of electricity demand at domestic level in Balochistan, Pakistan

  • Urooj, Rabail;Ahmad, Sheikh Saeed
    • Advances in Energy Research
    • /
    • v.5 no.1
    • /
    • pp.57-64
    • /
    • 2017
  • Electricity is basic need for country development. But at the present time proper planning and policy is require at high pace for power generation network extension due to the increasing population growth rate. Present study aimed to analyze the present and future demand for electricity at household level in Province of Balochistan of Pakistan via simulation modeling. Data of year 2004-2005 was used as baseline data for electricity consumption to predict future demand of electricity at both rural and urban domestic level up to subsequent 30 years, with help of LEAP software. Basically three scenarios were created to run software. One scenario was Business-As-Usual and other two were green scenarios i.e., solar and wind energy scenarios. Results predicted that by using alternative energy sources, demand for electricity will be fulfill and will also reduce burden on non-renewable energy sources due to the greater potential for solar and wind energy present in Balochistan.

The Study on the Development of Electricity Market System and Resource Adequacy (전력시장제도 발전 및 공급안정성 확보 방안에 관한 연구)

  • Park, Jong-Bae;Lee, Joo-Won;Shin, Joong-Rin;Kim, Kwang-In
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.423-425
    • /
    • 2008
  • This paper presents a study on the development of the electricity market system and resource adequacy. Recently the market system and the power supply-demand system has limitations of evolution which has to be complementary developed by the changes of the power system environment. In this paper we proposed a fundamental step-by-step progress direction for our electricity market system and the supply-demand system by using the Korean power industry environment and overseas resource adequacy systems.

  • PDF