1 |
MOTIE, "The Seventh Basic Plan of Electrical Supply and Demand", 2015
|
2 |
MOTIE, "The Second Energy Master Plan", 2014
|
3 |
Koo-Hyung Chung, Man-Geun Park, Don Hur, "A Proposal of Institutional Prerequisites to the Participation of Virtual Power Plant in Electricity Market under the Smart Grid Paradigm", The Transactions of the Korean Institute of Electrical Engineers, Vol. 64, No. 3, March 2015.
|
4 |
Yong Kuk Park, Min Goo Lee, Kyung Kwon Jung, Yong-Gu Lee, "Large-scale Virtual Power Plant Management Method Considering Variable and Sensitive Loads", Journal of The Institute of Electronics and Information Engineers Vol.52, NO.5, May 2015
|
5 |
Hyun-Sung Lim, "A Study on Current Status Survey and Utilization of Emergency Generator Installation", Journal of the Korean Institute of IIIuminating and Electrical Installation Engineers, Vol29, NO. 10, October 2015.
|
6 |
Korea Smart Grid Institute, "VPP related laws and institutional and policy research and analysis research", 2015
|
7 |
Korea Smart Grid Institute, "Study of Economic Analysis Considering VPP operating system", 2015
|
8 |
Korea Smart Grid Institute, "Research of VPP operating systems and business models", 2015
|
9 |
Pike Research Report, "Virtual Power Plants : Demand Response, Supply-Side, Mixed Asset, and Wholesale Auction Smart Grid Aggregation and Optimization Networks", 2013
|
10 |
http://www.kpx.or.kr/
|