• Title/Summary/Keyword: Electrical Substation System

Search Result 504, Processing Time 0.032 seconds

Developing a Simulator on the Manufacturing Process of Electrical Substation System (전력용 변전시스템 제조공정 시뮬레이터 개발)

  • Kim, Hyuk;Lee, Kwang-Soo;Cho, Gyu-Sung
    • Journal of Korea Multimedia Society
    • /
    • v.18 no.1
    • /
    • pp.81-87
    • /
    • 2015
  • This research suggests a simulator regarding the Manufacturing Process of Electrical Substation System using a simulation method. This study is to propose and apply a new concept of simulation modeling, referred to as integrated Aspect-Oriented Modeling Approach (i-AOMA), in order to efficiently support the design and analysis of a Manufacturing Process of Electrical Substation System. The modeling based on i-AOMA can support easy generation of lots of alternative processes to meet simulation requirements of Manufacturing Process of Electrical Substation System in real case studies.

A Study on the Load Flow Program for 765[㎸] Substation Simulator (765[㎸] 변전소 시뮬레이터를 위한 조류계산 프로그램에 관한 연구)

  • 여상민;김철환;이종포
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.4
    • /
    • pp.201-206
    • /
    • 2003
  • Power system is analyzed by three methods of load flow, fault calculation, and voltage stability. Among there, load flow is calculated to flow of power in power in system at steady state. But, load flow is difficult to analyze to flow of power in substation, because power flow frequently alter by various equipments such as circuit bleaker, disconnect switch and shunt reactor. Particular, in 765[㎸] system, because of form of 1.5GB for stable operation, structure of substation has been very complex. In this paper, we describe technique for application of load flow algorithm in simulator for 765[㎸] substation. For this technique, we built each database for various equipments and considered form of 1.5GB Data as form of bus and line, for application of load flow, are acquired from built database, and then calculate load flow in substation. And. results of load flow are outputted in screen of operator console program.

Study on the Supervisory Monitoring System for Substation Automation (변전소 자동화를 위한 상태감시 시스템에 관한 연구)

  • Lee, Heung-Jae;Lee, Eun-Jae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.84-91
    • /
    • 2014
  • This paper introduces the application of supervisory monitoring system for substation automation based on IEC 61850. The objective of proposed system is detection of such a malfunction or degradation of devices. The supervisory monitoring procedure consists of a two step - topology processor and state estimation. The topology processor using artificial intelligence is a preprocessing step of state estimation. Topology processor identifies the topology structure of switches in substation and detects an error of ON/OFF state data. The state estimation is an algorithm that minimizes an error between optimal estimation values and real values. The proposed system is applied to standard digital substation based on IEC 61850 for performance verification.

Bus Reconfiguration Strategy Based on Local Minimum Tree Search for the Event Processing of Automated Distribution Substation (자동화된 변전소의 이벤트 발생시 준최적 탐색법에 기반한 모선 재구성 전략의 개발)

  • Ko Yun-Seok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.10
    • /
    • pp.565-572
    • /
    • 2004
  • This paper proposes an expert system which can enhance the accuracy of real-time bus reconfiguration strategy by adopting local minimum tree search method and minimize the spreading effect of the fault by considering totally the operating condition when a main transformer fault occurs in the automated substation. The local minimum tree search method to expand the best-first search method. This method has an advantage which can improve the performance of solution within the limits of the real-time condition. The inference strategy proposed expert system consists of two stages. The first stage determines the switching candidate set by searching possible switching candidates starting from the main transformer or busbar related to the event. And, second stage determines the rational real-time bus reconfiguration strategy based on heuristic rules for the obtained switching candidate set. Also, this paper studies the generalized distribution substation modelling using graph theory and a substation database is designed based on the study result. The inference engine of the expert system and the substation database is implemented in MFC function of Visual C++. Finally, the performance and effectiveness of the proposed expert system is verified by comparing the best-first search solution and local minimum tree search solution based on diversity event simulations for typical distribution substation.

Development of an Intelligent Station HMI in IEC 61850 Based Substation

  • Rim, Seong-Jeong;Zeng, Sheng-Wu;Lee, Seung-Jae
    • Journal of Electrical Engineering and Technology
    • /
    • v.4 no.1
    • /
    • pp.13-18
    • /
    • 2009
  • Because the existing Human-Machine Interface (HMI) for the conventional substation cannot dynamically indicate the configuration information of the Substation Automation System (SAS). In this paper, an intelligent station HMI is proposed for IEC 61850 based substation. The program of the proposed HMI not only can automatically generate the layout of single line diagram, but can also indicate the communication network and functions of IEDs by reading SCL files. It greatly helps monitor the operation status, communication network and each IED dynamically, such as failure detection in SAS. Furthermore, this paper presents the possibility of developing new software for SAS with the full use of IEC 61850-6. Once the software is complete, there is no need to change it when the substation is upgraded or when it is migrated to other IEC 61850 based substations, which is a cost-effective solution.

A Study on the Digital DC Protection Relay through with Field Adoption Test in the DC Distribution System (직류급전시스템 시험적용 사례를 통한 디지털 직류 보호계전기에 관한 연구)

  • Ko, In-Suk;Cha, Kwang-Seok;Min, Byung-Hoon
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.55 no.12
    • /
    • pp.646-652
    • /
    • 2006
  • This study identifies the comparison of Technical specification and Characteristics of DC Protection Relay(ETCPU200) used in DC Distribution System in Korea. ETCPU200 has completed Field Test and approved its capability by finding out causes of recent operations through lately developed digital DC protection relay in parallel operation at Maebong-Substation, Sangbong-Substation, Nakseongdae-Substation, Euljirosaga-Substation, Jegi-Substation and Chongyangri T/P area. It also examines additional features for efficient System Analysis and Operations.

Design of a Prototype Fibre Optic Based Monitoring and Control System for Future KEPCO's 765kV Substation (765kV 변전소 감시제어용 시범시스템)

  • Jiang, Moon-Myung;Chung, Sang-Jin;Choi, Jong-Hyoub;Park, Jong-Myung
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.883-886
    • /
    • 1996
  • Instead of point-to-point hard wiring between substation yard equipments and SCADA RTU(Remote Terminal Unit), fibre optic cable will be used in the portion between Local Units and Central Unit in the future KEPCO 765kV substation. The connections between substation yard equipments and nearby Local Unit remain the same hard wiring. The new fibre optic system will provide security especially during ground faults and is immune to electrical noise. A prototype system will be manufactured and installed in the existing 154kV Yeosan Substation by the end of July this year and operated for one year. By incorporating the operation experiences acquired in the system, an improved system will be commercially applied to 765kV Shin-An-Seong Substation where 345kV GIS will be installed initially and act as the switching station in the year 1998. The system is composed of one Central Unit and several Local Units. The Central Unit is composed of two workstation level computers, one is in operation and the other backup, and a Communication Control Unit. The Local Unit uses the existing SCADA RTU technology and takes the form of a distributed one. Between the Communication Control Unit and Local Units, the fibre optic system with star-coupler is used.

  • PDF

Capacity Determination of ESS for Peak Load Shaving Based on the Actual Measurement of Loads in the Substation of Urban Railway (도시철도 실측 부하에 기반한 첨두부하 절감용 ESS 용량 산정)

  • Park, Jong-Young;Jung, Hosung;Kim, Hyungchul;Shin, Seungkwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.6
    • /
    • pp.860-865
    • /
    • 2014
  • This paper proposes the method for determination of the capacities of ESS (Energy Storage System) and PCS (Power Conditioning System) for the peak load shaving based on the load data in the substation of urban railway. In addition, this paper analyze the actual measurement of loads in the substation of urban railway. The load of a weekday in the substation of urban railway is high around rush hours in the morning and evening, which is different from that of a normal substation. The required capacities of ESS and PCS become larger as the amount of peak load shaving is higher, and are affected from the patterns of daily load in the substation.

A Reliability Enhancement Methodology of the IEC61850 based Substation Automation System (IEC61850 기반 변전소자동화시스템인 신뢰도 향상기법)

  • Lim, Seong-Il
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.9
    • /
    • pp.75-81
    • /
    • 2008
  • The effect of the fault could be propagated to healthy region when the fault on the power system is not cleared in time. In order to enhance reliability of the protective relay, a dual and/or backup system is adopted for the power system protection. The IEC61850 has become an international standard of the substation automation system for interoperability between heterogeneous IEDs from different vendors. This paper introduces a reliability enhancement technique for the substation automation system using characteristics of the IEC61850.

A Study on Description of IEC 61850 based Substation Topology for Implementing the Engineering Tool of Digital Substation (디지털변전소 엔지니어링 툴 구현을 위한 IEC 61850 국제규격 기반의 변전소 토폴로지 표현에 관한 연구)

  • Lee, Nam-Ho;An, Yong Ho;Jang, Byung-Tae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.23-32
    • /
    • 2015
  • In order to complete engineering works of the digital substation, Both Data transmission among a variety of IEDs and HMIs, and single line diagram of the substation might be done based on XML documents published in IEC 61850 international standards. This kind of XML based engineering process for the digital substation must be implemented not by manual written work but by the engineering tool using a computer. But most of the engineering tools do not support system based engineering works such as single line diagram of the substation but have only function to set IEDs as single device unit. Accordingly, this paper presents a new design method of the system based engineering description applicable to real IEC 61850 based substation through analyzing the current international standard and its sampled engineering file, and shows implementation of the engineering tool of the digital substation with the result of this study.