Browse > Article
http://dx.doi.org/10.9717/kmms.2015.18.1.081

Developing a Simulator on the Manufacturing Process of Electrical Substation System  

Kim, Hyuk (SCIEX Co. Ltd.)
Lee, Kwang-Soo (Peace % Inc.)
Cho, Gyu-Sung (Dept. of Port Logistics System, TongMyong University)
Publication Information
Abstract
This research suggests a simulator regarding the Manufacturing Process of Electrical Substation System using a simulation method. This study is to propose and apply a new concept of simulation modeling, referred to as integrated Aspect-Oriented Modeling Approach (i-AOMA), in order to efficiently support the design and analysis of a Manufacturing Process of Electrical Substation System. The modeling based on i-AOMA can support easy generation of lots of alternative processes to meet simulation requirements of Manufacturing Process of Electrical Substation System in real case studies.
Keywords
Electrical Substation System; Simulation; System Performance;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 J.I. Choi, K.R. Kim, and T.Y. Kim, "A Situational Training System based on Augmented Reality for Developmental Disabled People," Journal of Korea Multimedia Society, Vol. 16, No. 5, pp. 629-636, 2013.   DOI
2 L. Manuj, J.T. Mentzer, and M.R. Bowers, "Improving the Rigor of Discrete-Event Simulation in Logistics and Supply Chain Research," International Journal of Physical Distribution & Logistics Management, Vol. 39, Issue 3, pp. 172-201, 2009.   DOI
3 G.S. Cho and H.G. Kim, "A Method for Simulation Design of Refrigerated Warehouses using Aspect-Oriented Modeling Approach," International Journal of Industrial Engineering, Vol. 20, No. 12, pp. 24-35, 2013.
4 G.S. Cho and K.Y. Ryu, "A Study on the Business Process Management and Modeling using i-AOMA," ICIC Express Letters, Vol. 6, No. 3, pp. 845-850, 2012.
5 Brooks Automation Inc., AutoMod 12.0 User’s Guide, USA, 2005.
6 K.K. Cho and B.U. Lee, "A Method of Component-Machine Cell Formation for Design of Cellular Manufacturing Systems," Journal of the Korean Society for Precision Engineering, Vol. 13, No. 4, pp. 143-151, 1996.
7 B.H. Jeon, S.Y. Jang, W.Y. Lee, and J.H. Oh, "An Evaluation of Development Plans for Rolling Stock Maintenance Shop using Computer Simulation," Journal of the Korea Society for Simulation, Vol. 18, No. 3, pp. 23-34, 2009.
8 C.H. Yoon, K.H. Ryu, I.C. Lee, and E.S. Byun, “A Simulation Study for Analyzing Digital Doorlock Mixed Assembly Process,” Journal of Korea Academia-Industrial Cooperation Society, Vol. 10, No. 7, pp. 1439-1445, 2009.   DOI
9 D.H. Moon, C. Song, and J.H. Ha, "A Simulation Study on the Operation of the Painted Body Storage in an Automobile Factory," IE Interfaces, Vol. 18, No. 2, pp. 136-147, 2005.
10 H.S. Hwang and G.S. Cho, “Assembly Performance Evaluation using FACTOR/AIM for Main Body of Automobile Assembly Line,” Journal of the Korean Institute of Industrial Engineers, Vol. 27, No. 1, pp. 95-102, 2001.   DOI
11 T.G. Kim and J.J. Lee, "Development of a Graphical Modeler for Manipulating Series Data Based on Object-Oriented Technique," Journal of The Korean Society of Agricultural Engineers, Vol. 51, No. 2, pp. 43-49, 2009.   DOI