• Title/Summary/Keyword: Electrical Installation

Search Result 6,497, Processing Time 0.03 seconds

Optimum design of PV system used by parameter design method (파라미터 설계방식을 이용한 PV시스템의 최적설계)

  • Jeong, B.H.;Choi, Y.O.;Choi, M.H.;Lee, K.Y.;Baek, H.L.;Cho, G.B.
    • Proceedings of the KIPE Conference
    • /
    • 2007.07a
    • /
    • pp.64-66
    • /
    • 2007
  • Photovoltaic power systems convert sunlight directly into electricity. A residential PV power system enables a homeowner to generate some or all of their daily electrical energy demand on their own roof, exchanging daytime excess power for future energy needs In this paper, It was suggested that new design method for PV system installation for the purpose of system efficiency improvement. and according to loss parameter compensation method, designed for the PV system and investigated through the simulation practically.

  • PDF

Analysis of Touch Voltage and Step Voltage using a Potential Distribution Characteristic (전위분포특성을 이용한 접촉전압과 보폭전압의 분석)

  • Lee, Bok-Hee;Jung, Hyun-Uk;Choi, Jong-Hyuk;Cho, Sung-Cheol;Beak, Young-Hwan;Lee, Kyu-Sun;Ahn, Chang-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2006.07c
    • /
    • pp.1474-1475
    • /
    • 2006
  • This paper describes touch and step voltage in the reinforced concrete and steel poles. Ground surface potential rises were measured as a function of the separation between pole and ground rod. Touch and step voltage are calculated on the basis of the distribution of ground surface potential rises. As a result, touch and step voltages strongly depend on the position of installation of ground rod.

  • PDF

Development status of Photovoltaic Generation System for the Electrification of Remote Islands (도서전원용 태양광발전시스템 개발 동향)

  • Hwang, In-Ho;Oh, Sung-Up;Chung, Cheon-Kee;Kim, Jin-Joong
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1298-1300
    • /
    • 1996
  • The application field of photovoltaic system which has no-pollution and no-fuel distinctives is being spreaded inspite of its high installation cost. At present, there are three PV systems within the country, which were already installed and have been operated to supply the electric power in remote island. In this paper, the electrification plan of our government on the unelectrified or subelectrified islands is introduced, and the operation results of three PV systems are investigated to discuss the diffusion possibility of PV system as a power supply option.

  • PDF

Comparative Study on Transient Stability Improving Capability of Series and Shunt Compensation (비용함수에 의한 직병렬보상장치의 과도안정도 향상 특성 비교)

  • Choi, Kyu-Hyoung;Jeoug, Chang-Yang;Oh, Tae-Kyoo
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.655-657
    • /
    • 1996
  • The objective of this paper is to compare the series and shunt approaches of controlled reactive power compensation to improve power system transient stabilities. Including main circuit considerations of series and shunt compensators, application aspects are thought to have major impacts on efficiency and economy of the installation of the compensators. The concept is studied by means of EMTP simulations on one machine-Infinite Bus Test System which consists of a 612MVA steam turbin generator and transformer and double circuit 345KV transmission line. Idealized dynamic models of Thyristor Controlled Series Compensation and Shunt Compensation are used for the comparative study of the series and shunt compensation approach to damp power system oscillations.

  • PDF

The Operating Method of Superconducting Fault Current Limiter for Total Superconducting Power System (초전도전류제한기의 초전도 전력시스템에서의 운전방안)

  • Hong, Won-Pyo
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.764-767
    • /
    • 1996
  • Design & operation of power system for meeting increase of electric power demands is becoming more difficult and complex. One of reasons is increase of fault current. As one of the most effective methods for suppressing the fault currents, installation of SFCL are expected. An image of future hybrid & total SC power system which have introduced SC generator cable transformer, fault current limiter, SMES & shunt reactor, etc. are presented. In the SC power system, it is pointed that a SFCL should play an, important part of quenching current level coordination to prevent the other SC devices from quench.

  • PDF

Development of Integrated Simulator for Intelligent Building Control Systems (인텔리젼트 빌딩 제어 시스템의 통합 시뮬레이터 개발)

  • Bae, Joong-Won;Lim, Dong-Jin;Hong, Seung-Ho;Song, Kyoo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1199-1201
    • /
    • 1996
  • To Provide pleasant building environment and the ease of maintenance and facility management, many new office buildings are being built as intelligent buildings. Building control systems which are employed in intelligent buildings require advanced types of controllers and varieties of control schemes. Designing and installation of these types of advanced building control systems take a lot of effort and also they are costly. In order to design these systems, it is necessary for the designers to have means to analyze and estimate the performance of control systems. In this paper, the results of the simulator for HVAC and elevator system are presented as the first stage of the development of the integrated simulator. For the development of simulator, ARENA which is the general-purpose software tool for the simulation with reinforced GUI is used.

  • PDF

The Influence of The Starting Permanent Magnet on Average Torque of The Salient Pole Rotor Type Single Phase SRM (영구자석 기동장치가 회전자 돌극형 단상 SRM의 평균 토오크에 미치는 영향)

  • Kim, Jun-Ho;Lee, Eun-Woong;Lee, Chung-Won;Seo, Jung-Min;Kim, Gyeon-Muk
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1030-1032
    • /
    • 2003
  • Single phase SRM(switched reluctance motor) can not be start by itself because positive torque is generated in limited section. Therefore single phase SRM need starting device which is place the rotor in positive torque section when motor is begun to start. The prototype of salient pole rotor type single phase SRM, fabricated in previous research, has permanent magnet starting device. It is installed in bottom of the rotor for starting by itself. But, it is affected the motor when driving and cause the decrease of torque and speed. On this paper, average torque of the prototype was measured according to installation of the starting device or not. And influence of the staring device on average torque was confirmed by comparison of the results.

  • PDF

Reliability estimation and optimal capacity and allocation by distributed generation installation (분산전원 설치에 따른 신뢰도 평가와 최적용량과 위치결정)

  • Park, Jung-Hoon;Shin, Dong-Suk;Kim, Jin-O;Kim, Kyu-Ho;Cho, Jong-Man
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.151-153
    • /
    • 2003
  • This paper proposes determining a optimal number, size and allocation of DGs(Distributed Generations) needed to minimize operation cost of distribution system, obtains economic benefit in operation planning of DG and improves system reliability. System reliability is assessed whether DG install and reliability cost consider. DG optimal allocations are determined to minimize total cost with power buying cost, operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm). And it was determined installed load-point and order.

  • PDF

A study on the moving picture transmission method between the accident sites and control center (철도 사고현장의 동영상 전송방안에 관한 연구)

  • Cho, B.K.;Chang, S.G.;Ryu, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1300-1302
    • /
    • 2003
  • CCTV network has been implemented to transmit the image information of platform, ticket gate and transfer section to local headquarters in the KNR(Korean National Railroad). But, communication system for transferring image information around accident field or wayside has not been established yet. thus, at present implementation of communication equipment is necessary for dynamic image of unspecified accident to be transmitted to headquarters. Copper cable communication network is run by KNR, but it is processing installation of optical cable in connection with the implemental plan for high-speed network from now on. And, the capacity of communication channel will be guaranteed much more than now between station and station, station and central headquarters when optical cable is completed. This study analyzes the image equipment of field for transmission and estimated matters to transmit image information of accident field to headquarters with using communication infrastructure. And, the study considers implemental method of communication network for long-distance image transmission from dozens to hundreds kilometers.

  • PDF

A Study on the Facility Installation for Safety Operation of Urban Transit (도시철도의 안전운행을 위한 시설물 설치에 관한 연구)

  • Lee, Woo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1323-1325
    • /
    • 2003
  • In field of Urban transit safely, It must be not only secured vehicle but also every areas like power, signal, communication, track, tunnel, operating facilities. Likewise it is very important not only hardware system like vehicles, facilities but also software system like action of engine driver, duty officer. In other to secure safety of hardware, soft ware, it is very important systemic process. In Korea, Many operating companies neglect to invest in safely and ignore technical development about safety because of management. Safely was considered in subway system and many studies were accomplished about safety in subway system in advanced county like U.K, USA. Hence, in this paper, Conditions and improvement of minimum considerable hardware and software are proposed for safe operation in Urban transit.

  • PDF