• Title/Summary/Keyword: Electrical Facility

Search Result 689, Processing Time 0.021 seconds

The Study on the Actual Condition about Facility Accident Case and PL Recognition of the Safety Manager in Electric Installation for Private Use (수용가 전기설비 관리자의 PL인식 및 설비사고사례에 관한 실태연구)

  • Kim, Young-Seok;Shong, Kil-Mok;Jung, Jong-Wook;Jung, Jin-Su;Kim, Sun-Gu;Lee, Jun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.309-312
    • /
    • 2008
  • In this paper, we investigated electric safety manager's PL recognition and accident occurrence of electric power facilities(power cable, transformer, circuit breaker) in electric installation for private use. The target of questionnaire survey is 450 electric installations for private use, 154 responded the questionnaire among these and it occupied 35.8%. Most of receiving voltage were 22.900kV. The questionnaire survey says that 58% of electric safety manager knew well about PL contents and 42% of them did not recognize about PL contents, About the PL application of electrical facility accidents, 82.4% of them must applied PL law, 5.8% of them did not need the PL law. Reason of PL application occupied 64% for stability of electrical facility and product, 19% for prevention of same accident. The accident of transformer occupied most and the power cable accident were much next. The questionnaire survey results, electric safety managers are interested in PL content. thev expected necessity of PL application about electrical accident strongly.

  • PDF

Development of On-line/Off-line Light Facility Management Program (온라인/오프라인 조명시설 관리 프로그램의 개발)

  • Jeon, Chang-Dae;Chang, Byong-Kun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.91-95
    • /
    • 2004
  • This paper concerns developing a real time on-line light facility management system using internet and building a database system for control box and street light. Also, we designed the system to minimize the disparity with the conventional management system by referring to a old management ledger format. Thus, the proposed method may enable the system manager to administer the light facility efficiently and to reduce the manpower cost, and time economically.

  • PDF

Development of a new test facility for the evaluation of thrusters mounted on a small scale underwater vehicle (소형 잠수정에 장착된 추진기의 특성 평가를 위한 새로운 시험 설비 개발)

  • Kim, Ki-Ho;Yi, Keon-Young
    • Proceedings of the KIEE Conference
    • /
    • 2006.07d
    • /
    • pp.1789-1790
    • /
    • 2006
  • This paper reports a new test facility to investigate the characteristics of the thrusters mounted on the small scale underwater vehicle using Force/Torque sensor. With the test facility proposed here, No disassembly needs be made to the target vehicle, which makes us possible to get the realistic forces of the vehicle rather than the fortes of the thrusters themselves. Experimental data analyses, heave, sway, and surge, for the QI ROV are given as an example of this method.

  • PDF

Simplified Synthetic Testing Facility with Modified TRV Circuit

  • Chong, Jin-Kyo;Lee, Kyung Seob;Lee, Chang-Hoon;Kim, Gyu-Tak
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.881-885
    • /
    • 2018
  • In order to develop a gas circuit breaker (GCB), the breaking performance of the short line fault (SLF) should be prioritized over that of the breaker terminal fault (BTF). In brief, it is necessary to evaluate the thermal characteristics of the insulating gas that is filled in a GCB. In the process of developing a GCB, many companies use the simplified synthetic testing facility (SSTF).In order to evaluate the SLF breaking performance of a GCB with a long minimum arcing time, a modifications to the conventional SSTF was proposed. In this study, we developed the SSTF with a modified transient recovery voltage circuit. The performance of the newly developed SSTF was verified by an $L_{90}$ breaking performance test on a rating combination of 170 kV, 50 kA, and 60 Hz.

Human Hazard by Outdoor Electrical Facilities in Submerged Area (옥외 전기시설물 침수시 누설전류에 의한 인체영향)

  • 하태현;이현구;배정효;김대경
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.12
    • /
    • pp.602-607
    • /
    • 2003
  • We show three-dimensional distribution of voltages resulted from the leakage current originated from outdoor electrical facilities in a submerged area. In case these facilities are grounded by the neutral line multiple grounding method, the existence of ungrounded electrical facilities can cause a disastrous effect on near-by passengers. In order to investigate this situation, we installed a real-scale test field for the experiment type I (for the leakage current path between a enclosure grounded electrical facility and another enclosure grounded one), and that for the experiment type II (for the leakage current path between a enclosure grounded electrical facility and another ungrounded one). For both cases, we carried out three-dimensional monitoring of the voltage distribution while varying additional conditions such as the exposure of the underground cables and the finishing of cable connection part. The result shows that a disastrous effect on human safety can arise from the leakage current without a pertinent measure for the construction and maintenance of outdoor electrical facilities.

On the Improvement of the Process by Analyzing Precision Diagnosis of Deteriorated Railroad Communication Facilities

  • Hwang, Sun Woo;Kim, Joo Uk;Park, Jeong Jun;Kim, Hyung Chul;Park, Jin Hyuk;Kim, Young Min;Lee, Gye Chool
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.2
    • /
    • pp.136-144
    • /
    • 2021
  • Railroad Systems, which are national infrastructure industries, cause unexpected property and human damage if they fail to function while operating. Accordingly, railroad facilities supporting the railroad system are areas where high reliability and safety are required. However, it is time for systematic and scientific maintenance to be taken away from the traditional maintenance methods, as the nation's railroad facilities are now aging seriously. The purpose of this study was to secure the safety and reliability of the aging railroad communication facilities and to improve their performance. The research subjects were selected as a precision diagnosis process for railroad communication facilities, and improvement points were derived through detailed precision diagnosis process analysis. It is deemed that this study can contribute based on securing stability, improving reliability, and continuous improvement of railroad communication facilities should be conducted in the operation of the entire railroad system.

Advanced electricity electron information communication facility obstacle factor and countermeasure investigation in digital age (디지털시대의 첨단 전기 전자 정보 통신설비 장애요인과 대책 고찰)

  • Kang, Tae-Keun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.110-115
    • /
    • 2004
  • Examine merits and demerits and obstacle factor that exist to all direction of digital infratechnology that is supplied on industry whole according to development special quality of computer by development of computer and Information Technology and electricity electron information communication facility that basic impulse insulation level does not exist examined scorched earth or an interference problem factor and countermeasure of semiconductor degauss of factor and electricity electron information transmission system that is numbed or causes system down.

  • PDF

Investigation for construction of the control system for KSTAR NBI (KSTAR NBI 운전 제어 시스템 제작을 위한 고찰)

  • Chang, D.S.;Oh, B.H.;Kim, Y.M.
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.295-296
    • /
    • 2006
  • Prototype NBI(Neurtal Beam Injector), which Is tested at KAERI(Kaeri Atomic Energy Research Instutide), is the facility for tokamak plasma Ignition of the advanced nuclear fusion KSTAR(Korea Superconducting Tokamak Advanced Research). New NBI facility, which is the part of KSTAR tokamak, will be constructed during next three years. This investigation is focused on the preliminary test to construct the control system for KSTAR NBI, before KSTAR NBI facility is constructed.

  • PDF