• Title/Summary/Keyword: Earth works

Search Result 265, Processing Time 0.024 seconds

An Experimental Study of Soil-nailed Structures in Sands (모래를 사용한 지반네일 구조물의 실험적 연구)

  • Kim, Jun-Seok;Lee, Sang-Deok;Lee, Seung-Rae
    • Geotechnical Engineering
    • /
    • v.13 no.2
    • /
    • pp.91-100
    • /
    • 1997
  • The soil nailing method has been developed on the basis of experimental works as well as theoretical backgrounds. As for the experimental research works, most of the data have been measured during the application of load in service. However, not only the soil-nailed structure behavior in service but also the failure behavior of the structure is major concern to evaluate and even establish a design method of soil-nailed walls. In this study, a relatively large-scale experiment was carried out to figure out the failure behavior of soil-nailed wall. A number of data such as displacement of soil-nailed walls, soil pressure in soil-nailed walls, atrial strain and axial force of nail etc.'have been acquired and analysis.

  • PDF

Experiment of Computation of Ground Cutting Volume Using Terrestrial LiDAR Data (지상 LiDAR 자료의 절토량 산정 실험)

  • Kim, Jong-Hwa;Pyeon, Mu-Wook;Kim, Sang-Kuk;Hwang, Yeon-Soo;Kang, Nam-Gi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.17 no.2
    • /
    • pp.11-17
    • /
    • 2009
  • Terrestrial LiDAR can measure high capacity 3D-topography coordinates and try to apply to various public works such as tunnel surveying, facility deformation surveying. This experiment is about how to calculate ground cutting volume because the stage of the earth work spend lots of money and time among civil engineering works. Surveying cutting area using Terrestrial LiDAR and then calculating cutting area in planned area comparing sectional plan before construction and planned section and LiDAR data. Also, the values of the calculating ground cutting volume by three different resolution LiDAR has are compared and analyzed.

  • PDF

A Study on the Costume Work Applying Kkot Mun(Floral Doors) (꽃문을 응용한 의상 작품 제작에 관한 연구)

  • Moon, Myeng-Ok
    • Fashion & Textile Research Journal
    • /
    • v.9 no.3
    • /
    • pp.270-277
    • /
    • 2007
  • Buddhist temples and halls signify paradise on earth. Buddhist sutras refer to paradise as a place where flowers fall down like snow, fragrance and music fill the air, flowers blossom and butterflies fly. The Kkot Mun of Buddhist temples are an essential part of the creation of this paradise and are ornamented with elaborate sculptures of flowers and animals. The ornamentation of the Kkot Mun is truly admirable for its artistry and beauty. Although the Kkot Mun is an element of Korean traditional Buddhist architecture, it could also be applied to costume work. I thought the characteristic elements of the Kkot Mun for the costume work were the flower, the lattice and the transparent effect that was made with the lattice and Dagjongee. I used the technique of strap cutting, strap twisting and cut-out for the lattice of Kkot Mun and flower making, knitting, cut-out and quilting for the flower of Kkot Mun. I represented the transparent effect of Kkot Mun with the lapped materials. I selected six remarkable Kkot Mun of Korean temples, revised shapes of these and made six costume works. These six costume works would be the suggestion of costume design if an element of Korean traditional architecture was applied to modern costume making.

GPS receiver and orbit determination system on-board VSOP satellite

  • Nishimura, Toshimitsu;Harigae, Masatoshi;Maeda, Hiroaki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1991.10b
    • /
    • pp.1649-1654
    • /
    • 1991
  • In 1995 the VSOP satellite, which is called MUSES-B in Japan, will be launched under the VLBI Space Observatory Programme(VSOP) promoted by ISAS(Institute of Space and Astronautical Science) of Japan. We are now developing the GPS Receiver(GPSR) and On-board Orbit Determination System. This paper describes the GPS(Global Positioning System), VSOP, GPSR(GPS Receiver system) configuration and the results of the GPS system analysis. The GPSR consists of three GPS antennas and 5 channel receiver package. In the receiver package, there are two 16 bits microprocessing units. The power consumption is 25 Watts in average and the weight is 8.5 kg. Three GPS antennas on board enable GPSR to receive GPS signals from any NAVSTARs(GPS satellites) which are visible. NAVSATR's visibility is described as follows. The VSOP satellite flies from 1, 000 km to 20, 000 km in height on the elliptical orbit around the earth. On the other hand, the orbit of NAVSTARs are nearly circular and about 20, 000 km in height. GPSR can't receive the GPS signals near the apogee, because NAVSTARs transmit the GPS signals through the NAVSTAR's narrow beam antennas directed toward the earth. However near the perigee, GPSR can receive from 12 to 15 GPS signals. More than 4 GPS signals can be received for 40 minutes, which are related to GDOP(Geometric Dillusion Of Precision of selected NAVSTARs). Because there are a lot of visible NAVSTARs, GDOP is small near the perigee. This is a favorqble condition for GPSR. Orbit determination system onboard VSOP satellite consists of a Kalman filter and a precise orbit propagator. Near the perigee, the Kalman filter can eliminate the orbit propagation error using the observed data by GPSR. Except a perigee, precise onboard orbit propagator propagates the orbit, taking into account accelerations such as gravities of the earth, the sun, the moon, and other acceleration caused by the solar pressure. But there remain some amount of calculation and integration errors. When VSOP satellite returns to the perigee, the Kalman filter eliminates the error of the orbit determined by the propagator. After the error is eliminated, VSOP satellite flies out towards an apogee again. The analysis of the orbit determination is performed by the covariance analysis method. Number of the states of the onboard filter is 8. As for a true model, we assume that it is based on the actual error dynamics that include the Selective Availability of GPS called 'SA', having 17 states. Analytical results for position and velocity are tabulated and illustrated, in the sequel. These show that the position and the velocity error are about 40 m and 0.008 m/sec at the perigee, and are about 110 m and 0.012 m/sec at the apogee, respectively.

  • PDF

A Study on the Change of Work and Improvement in the Private Forest Road of Chungcheongnam Province (충청남도 민유임도에 적용된 공종의 변화 및 개선방안에 관한 연구)

  • Lee, Joon Woo;Kim, Ju Baek;Choi, Yeon Ho;Kim, Myeong Jun;Park, Bum Jin;Park, Jong-Min
    • Journal of Forest and Environmental Science
    • /
    • v.23 no.1
    • /
    • pp.21-28
    • /
    • 2007
  • In my study, I analysed and criticised the change of applied works based on a design drawing of a private forest road in Chungchengnam province from 1990 to 2003. The aim of this study is to obtain the fundamental resources for establishment the green forest road which is environment friendly. Working expenses of forest road was gradually increased by a business year. In particular, the working expenses dramatically increased in 1999-2000. In change rate of cost of construction by works, earth work rate of the cost of constructions was declined: from 25.4% in 1990-1999, to 18.5% in 2000-2003. However, the total cost of the construction of slope protection work and structural work increased. Nevertheless the rate of the cost of constructions are not increased where as the earth work rate of the cost of constructions were reduced. The rate of the price construction materials and the cost of construction was the main causes which was led by the extension of the standard requirement of applied work and the increase of the materials of applied work. In other word, materials of structural work and slope protection work increased. If the increase of the cost of construction has seem through the increase of contractual materials and extension of the standard requirement would led to weak competitiveness of forest road. Therefore, diverse method of constructions need to apply and a new method should be developed.

  • PDF

A Study of the Characteristics of Skylights and Roof Structures in the Works of Mario Botta (마리오 보타 작품에 나타난 천창과 지붕구조의 특성 연구)

  • 김용립
    • Archives of design research
    • /
    • v.16 no.4
    • /
    • pp.243-254
    • /
    • 2003
  • The aim of this study is to analyze the skylights and roof structures designed by Marie Botta from the viewpoint of the space, the form and the light source, and thus to find out their characteristics. For this purpose, his 13 major works were selected and analyzed according to the principle of design, which could explain the characteristics of skylight and roof structures sufficiently. Trough this study, the followings are realized. 1) The skylights are the main light source in the interiors of his buildings that are comparatively dark, being enclosed by thick materials such as bricks. The roof structures have been precisely designed to disperse the light effectively 2) The skylight and roof structures play the role of form-creating elements in his buildings. They create the unique images for the exteriors and endow form to the interiors. 3) The skylight also serves as a window to communicate with nature outside. Through the skylight, people in his buildings are able to perceive the flow of time and enjoy the scenery of the sky. 4) The light that showers through the skylight and adjusted by roof structures produces special atmosphere in his projects. In his interiors, people can experience a somewhat miraculous and sacred feeling with the light from above. 5) The skylight has meaning as a symbol. It symbolize the relationship between the earth and the sky. Also, in religious projects, a skylight provides a symbolic vision of Heaven for Christians. Comparing with recent works presented in our country, which emphasize simple interiors using artificial light, Botta's works suggest another form of design differentiated from the works of our designers in that Botta's works not only take advantage of natural light by using skylights and roof structures but also utilize them as form-creating elements.

  • PDF

An Experimental Guide to Predictable Fuel Cell Operations by Controlling External Gas Supply (외부 유입 가스 조절을 통한 연료전지 구동 성능 안정화)

  • Jang, Hansaem;Park, Youngeun;Lee, Jaeyoung
    • Applied Chemistry for Engineering
    • /
    • v.29 no.5
    • /
    • pp.626-629
    • /
    • 2018
  • Fuel cell is one of the promising electrochemical technologies enabling power production with various fuel sources such as hydrogen, hydrocarbon and even solid carbon. However, its long-term performance is often unstable and unpredictable. In this work, we observed that gasification-driven hydrocarbons were the culprit of unpredictability. Therefore, we controlled the presence of hydrocarbons with the help of external gas supply, i.e. argon and carbon dioxide, and suggested the optimal amount of carbon dioxide required for predictable fuel cell operations. Our optimization strategy was based upon the following observations; carbon dioxide can work as both an inert gas and a fuel precursor, depending on its amount present in the reactor. When deficient, the carbon dioxide cannot fully promote the reverse Boudouard reaction that produces carbon monoxide fuel. When overly present, the carbon dioxide works as an inert gas that causes fuel loss. In addition, the excessive carbon monoxide may result in coking on the catalyst surface, leading to the decrease in the power performance.

Research on the factors affecting the development of shrinkage cracks of rammed earth buildings

  • Zhao, Xiang;Cai, Hengli;Zhou, Tiegang;Liu, Ling;Ding, Yijie
    • Earthquakes and Structures
    • /
    • v.20 no.4
    • /
    • pp.365-375
    • /
    • 2021
  • Rammed earth (RE) buildings have existed all over the world for thousands of years, and have gained increasing attention because of its sustainable advantages, however, the shrinkage cracks reduce its bearing capacity and seriously affect its durability and applicability. In this study, the shrinkage cracks test was carried out to investigate the effects of initial water content, proportion of sand and gravel, compaction degree, thickness and the additives (polypropylene fiber, cement and sodium silicate) of shrinkage cracks in RE buildings, ten groups of RE samples were prepared and dried outdoors to crack. Four quantitative parameters of geometrical structure of crack patterns were used to evaluate the development of cracks. The results show that the specimens cracking behavior and the geometrical structure of crack patterns are significantly influenced by these considered factors. The formation of crack can be accelerated with the increase of initial water content and thickness of specimen, while restricted with the increase of the compaction degree and the proportion of sand and gravel. Moreover, the addition of 1% polypropylene fiber, 10% cement and 0.5 volume ratio sodium silicate can significantly restrain the form and development of cracks. In RE construction, these factors should be considered comprehensively to prevent the harm caused by shrinkage cracks. Further works should be carried out to obtain the optimum dosage of the additives, which can benefit the construction of RE buildings in future.

The Effect of Remedial Works to Control the Leakage Problem in Earth Fill Dam by Compaction Grouting (콤팩션 그라우팅에 의한 흙댐의 누수복원 공사효과 분석)

  • Chun, Byung-Sik;Lee, Yong-Jae;Chung, Ha-Ik
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.13-23
    • /
    • 2006
  • The sinkhole and leakage in dam core were detected at one of earth fill dams in Korea. The damage areas in the core of the dam were repaired by compaction grouting method. This study is to evaluate compaction grouting activity by in-situ and laboratory experiments before, during and after the remedial work. The intensive site investigation and geophysical survey were conducted during and after the compaction grouting work. The compaction grouting work was carried out for the damaged dam core between June 16 and August 24, 2000. The leakage reduction generally occurred in the core of the dam after the remedial work. The use of compaction grouting was considered the proper countermeasures for repairing the damaged dam. It shows that the loose or voided zones have been properly filled and the leakage has been reduced by about 96% of that before the treatment of the remedial work performed at dam core by compaction grouting.

Analysis of the Restoration Actual Conditions on the Quarries II (토석채취지의 복구 실태 분석 II)

  • Park, Jae Hyeon
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.4
    • /
    • pp.558-566
    • /
    • 2012
  • This study was conducted to offer preliminary data for a natural restoration by the actual condition survey of quarries after extracting rock materials. The mountain restoration area according to a farming and fishing village organize project was restored by green landscape after quarry. However, planting tree species were died due to poor maintenance and administration after restoration works and surface soil loss and erosion occurred during a summer rainfall season because of poor slope greening. It will be needed to review restoration constructions to establish a natural friendly and flawless construction through the selection of optimum restoration works and the examination of soil and geological characteristics. In addition, it is necessary to apply cost-reducing program of restoration constructions. Quarry areas could be restored by the selection of simple and optimum construction works because the most areas were dominant in earth-sand rocks, soft-rocks, and weather-rocks. In addition, the restoration construction project should be examined thoroughly by restoration specialists during green restoration planning and review processes.