The Effect of Remedial Works to Control the Leakage Problem in Earth Fill Dam by Compaction Grouting  

Chun, Byung-Sik (Dept. of Civil Engrg., Hanyang Univ.)
Lee, Yong-Jae (Dept. of Civil Engrg., Hanyang Univ.)
Chung, Ha-Ik (Geotechnical Engrg. Dept., Korea Institute of Construction Technology)
Publication Information
Journal of the Korean Geotechnical Society / v.22, no.11, 2006 , pp. 13-23 More about this Journal
Abstract
The sinkhole and leakage in dam core were detected at one of earth fill dams in Korea. The damage areas in the core of the dam were repaired by compaction grouting method. This study is to evaluate compaction grouting activity by in-situ and laboratory experiments before, during and after the remedial work. The intensive site investigation and geophysical survey were conducted during and after the compaction grouting work. The compaction grouting work was carried out for the damaged dam core between June 16 and August 24, 2000. The leakage reduction generally occurred in the core of the dam after the remedial work. The use of compaction grouting was considered the proper countermeasures for repairing the damaged dam. It shows that the loose or voided zones have been properly filled and the leakage has been reduced by about 96% of that before the treatment of the remedial work performed at dam core by compaction grouting.
Keywords
Compaction grouting; Dam core; Earth fill dam; Injection; Leakage; Repair;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Seemel, R. N. and Colwell, C. N. (1976), 'Drainage provision and leakage investigations of churchill falls dams and dykes', International Congress on Large Dams, Mexico, Q. 45, R. 8
2 Stewart, R. A., P. C. Gaffran, B. D. Watts, J. C., Sobkowicz, and A. G. Kupper. (1998), WAC Bennett Dam-The characterization of a crest sinkhole, geotechnical site characterization, edited by Robertson and Mayne, Balkema, Rotterdam
3 Salembier, M., G. Vassiliadis, Y. Le Nindre, and A. A. Souhangir (1998), 'Leakage investigations, safety analysis and proposed remedial measures at large dam', Proc., 66th ICOLD Annual Meeting, New Delhi, 85-95
4 Saman Construction Technology Co. (2000), Repair and reinforcement works of Unmum Dam
5 Youngnam University & Daebon Engineering Co. (2001), Final report on stability assessment and countermeasures of repair and reinforcement for Unmun Dam
6 Lim, H.D. Lee, K.H. Lee, J.Y. and B.H. Oh. (2004), 'Leakage investigation, remedial work and its effects on seepage control of Unmum dam', International Conference On Large Dam (ICOLD) nod Annual Meeting, Proceedings Workshop on Dam Safety Problems and Solutions-Sharing Experience, 225-243
7 Bemell, L. (1976), 'Control of leakage through dams founded on glacial till deposits', International Congress on Large Dams, Mexico, Q. 45, R.-56
8 Denver Korea Grouting Co. and Hayward Baker International. (2000), Final report on investigation and reinforcement of sink hole in Unmum Dam Core (I, II, III Step)
9 Weaver, K. D. (1993), 'Some considerations for remedial grouting for seepage control', Specialty Conference on Geotechnical Practice in Dam Rehabilitation, Geotechnical Division ASCE, New York
10 Warner, J. (1982), 'Compaction grouting-The First Thirty Years', Proceedings of the Conference on Grouting in Geotechnical Engineering, ASCE, 694-706
11 Dhar, D.K. (2004), 'Environmental considerations for sustainable dam projects', International Conference On Large Dam (ICOLD) 72nd Annual Meeting, Proceedings Workshop on Dam Safety Problems and Solutions-Sharing Experience, 36-43
12 Korea Water Resources Corporation (KOWACO) (2000), Report on precise safety diagnosis of Gyeongbuk Cheongdo-gun Unmun Dam
13 Brown, D. R. and Warner, J. (1973), 'Compaction grouting', Journal of the Soil Mechanics and Foundation Division, ASCE, Vol.99, No.SM8, pp.589-601
14 Korea Infrastructure Safety and Technology Corporation (2005), Report on detail safety investigation for Unmun Dam