• 제목/요약/키워드: Early design stage

검색결과 853건 처리시간 0.024초

수정된 K-means 알고리즘 (Modified K-means algorithm)

  • 김형철;조제황
    • 한국음향학회:학술대회논문집
    • /
    • 한국음향학회 1999년도 학술발표대회 논문집 제18권 2호
    • /
    • pp.115-118
    • /
    • 1999
  • One of the typical methods to design a codebook is K-means algorithm. This algorithm has the drawbacks that converges to a locally optimal codebook and its performance is mainly decided by an initial codebook. D. Lee's method is almost same as the K-means algorithm except for a modification of a distance value. Those methods have a fixed distance value during all iterations. After many iterations. because the distance between new codevectors and old codevectors is much shorter than the distance in the early stage of iterations, the new codevectors are not affected by distance value. But new codevectors decided in the early stage of learning iterations are much affected by distance value. Therefore it is not appropriate to fix the distance value during all iterations. In this paper, we propose a new algorithm using each different distance value between codevectors for a limited iterations in the early stage of learning iteration. In the experiment, the result show that the proposed method can design better codebooks than the conventional K-means algorithms.

  • PDF

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

Factors Clustering Approach to Parametric Cost Estimates And OLAP Driver

  • JaeHo, Cho;BoSik, Son;JaeYoul, Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.707-716
    • /
    • 2009
  • The role of cost modeller is to facilitate the design process by systematic application of cost factors so as to maintain a sensible and economic relationship between cost, quantity, utility and appearance which thus helps in achieving the client's requirements within an agreed budget. There are a number of research on cost estimates in the early design stage based on the improvement of accuracy or impact factors. It is common knowledge that cost estimates are undertaken progressively throughout the design stage and make use of the information that is available at each phase, through the related research up to now. In addition, Cost estimates in the early design stage shall analyze the information under the various kinds of precondition before reaching the more developed design because a design can be modified and changed in all process depending on clients' requirements. Parametric cost estimating models have been adopted to support decision making in a changeable environment, in the early design stage. These models are using a similar instance or a pattern of historical case to be constituted in project information, geographic design features, relevant data to quantity or cost, etc. OLAP technique analyzes a subject data by multi-dimensional points of view; it supports query, analysis, comparison of required information by diverse queries. OLAP's data structure matches well with multiview-analysis framework. Accordingly, this study implements multi-dimensional information system for case based quantity data related to design information that is utilizing OLAP's technology, and then analyzes impact factors of quantity by the design criteria or parameter of the same meaning. On the basis of given factors examined above, this study will generate the rules on quantity measure and produce resemblance class using clustering of data mining. These sorts of knowledge-base consist of a set of classified data as group patterns, of which will be appropriate stand on the parametric cost estimating method.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법 (Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects)

  • 성기훈;박문서;이현수;지세현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.207-211
    • /
    • 2008
  • 국내 건설산업은 급격한 시장변화와 경쟁심화의 과정을 겪으면서 프로젝트 초기 단계의 예산 집행 및 관리의 중요성이 증가하고 있다. 설계 완료 이후의 단계에서 조정 가능한 비용은 20%에 불과하기 때문에, 프로젝트 초기 단계에서 중요한 의사결정이 이루어진다. 하지만 초기 단계에서의 의사결정은 설계정보가 확정되지 않고, 정보가 한정되는 등 불확실성 하에서 이루어진다. 이에 따라, 본 연구는 프로젝트 초기 단계의 정확한 비용 예측을 목적으로 parametric method를 사용하여 공사비 예측 방법을 제안하였다. Parametric method를 이용한 공사비 예측 방법은 프로젝트 초기단계에 사용하기에 적합하며, 특히 신속하게 공사비 예측을 할 수 있다는 장점을 지닌다. 국내 아파트 9개 단지 $11{\sim}15$층 규모의 총 84개동 공공아파트 실적자료를 분석하여 공사비와 영향요인간 상관관계 분석을 실시하였다. 다중공선성 문제를 야기하는 변수를 제거한 후, 다중회귀분석을 통하여 공사비 예측 관계식을 도출하였다.

  • PDF

폐경단계별 근골격계 통증, 폐경증상 및 우울 (Musculoskeletal Pains, Menopausal Symptoms and Depression by Women's Menopausal Stage)

  • 장현정;안숙희
    • 근관절건강학회지
    • /
    • 제18권2호
    • /
    • pp.158-168
    • /
    • 2011
  • Purpose: The purpose of this study was to compare musculoskeletal pain, menopausal symptoms and depression by women's menopausal stage. Method: With a survey design, a convenience sample of 203 women between age of 40 to 64 was recruited through a community. Data were collected via a structured study questionnaire from May to July, 2008. Measures included with symptom severity list for menopausal symptoms, Aches and Pains scale, and Beck's Depression Inventory. Results: Thirty-seven percent of women belong to early peri-menopausal stage, 31% to late peri-menopausal stage, and 32% to postmenopausal stage. By group comparison, late peri-menopausal and post menopausal women reported higher scores of depression than early peri-menopausal women. Postmenopausal women had greater scores in two pain subscales (bodily pain and pain that interferes with normal work) and two menopausal symptoms subscales (sleep pattern and sexual behaviors) than early peri-menopausal women. There were moderate levels of positive relationships among study variables at each menopausal stage. Conclusion: Postmenopausal women seem to have greater musculoskeletal pain and menopausal symptoms, and have depression more than did early peri-menopausal women. Tailored nursing strategies are required to reduce these kinds of common symptoms for women with menopausal transition to improve their physical and psychological wellbeing.

초고층 주상복합 아파트의 연돌효과 특성에 관한 연구 -D 프로젝트를 중심으로- (A Study on the Stack Effect Characteristics in High-Rise Apartments)

  • 최동탁;손원득;최영식
    • 한국산업융합학회 논문집
    • /
    • 제14권1호
    • /
    • pp.37-43
    • /
    • 2011
  • Study of stack effects in the early design stage is the most appropriate moment to draw any problems and provide the right solutions. However, In a real process, The pre-design planning stage review is not thoroughgoing enough to high-rise construction site. Therefore, this study has reviewed by selecting one of inappropriate project [D] to find the possible stack effect alternatives in an early design documentation stage and provide countermeasures to be a foundations of stack effect in the construction stages.

고객 만족도 향상을 위한 제품의 핵심 설계요소 도출 프로세스에 관한 연구 (A study on inducing process of critical design factors for enhancing customer satisfaction)

  • 임영재
    • 품질경영학회지
    • /
    • 제45권4호
    • /
    • pp.717-738
    • /
    • 2017
  • Purpose: This study focused on procedure and methodology for finding the critical design factors in the early stage of product development process. Methods: Firstly, three key criteria, function, affection and usability were defined as the determining factors on customer satisfaction. Secondly, evaluation matrix in terms of each key criteria was proposed for extraction of the critical design factors. Lastly, method of integrating the importance among three key criteria was suggested using structured equation model. Results: As a results of integrating the importance, design factors such as touch sensitiveness and touch method were rated as low in terms of affection. However, these factors were obtained for high ratings with respect to functionality and usability. Thus, touch-related design factors were more facilitated for enhancing customer satisfaction. Conclusion: It is expected that the process suggested in this research could be a considerably useful to maximize customer satisfaction in the early stage of product development process.

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

CAE를 이용한 나노 임프린트 스테이지의 동적 거동해석 (Dynamic Analysis of a Nano Imprinting Stage Using CAE)

  • 이강욱;이민규;이재우;임시형;신동훈;장시열;정재일;임홍재
    • 한국공작기계학회논문집
    • /
    • 제16권5호
    • /
    • pp.211-217
    • /
    • 2007
  • A nano-imprinting stage has been widely used in various fields of nanotechnology. In this study, an analysis method of a nano-imprinting stage machine using FEM and flexible multi-body kinematics and dynamics has been presented. We have developed a virtual imprinting machine to evaluate the prototype design in the early design stage. The simulation using CAE for the imprinting machine is not only to analyze static and dynamic characteristics of the machine but also to determine design parameters of the components for the imprinting machine, such as dimensions and specifications of actuators and sensors. Structural components as the upper plate, the rotator, the shaft and the translator have been modeled with finite elements to analyze flexibility effects during the precision stage motion. In this paper flexible multi-body dynamic simulation is executed to support robust design of the precision stage mechanism. In addition, we made the 4-axis stage model to compare the dynamic behavior with that of 3-axis stage model.