• 제목/요약/키워드: EVMS (Earned Value Management System)

검색결과 43건 처리시간 0.051초

무기체계개발 사업에서 체계공학 프로세스 기반 사업성과관리 수행 방안 (Earned Value Management base on System Engineering Process in the Weapon R&D Project)

  • 국승학;김윤희;유이주
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.51-59
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a performing method for EVM based on system engineering process.

4D CAD 활용을 통한 공정-원가 통합 시스템 (Earned Value Management Systems Using 4D-CAD)

  • 박지호;정영수;김성모
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.504-508
    • /
    • 2003
  • 최근 공정관리와 원가관리의 중요도 인식에 기인하여 공정/원가 통합관리 및 공정정보와 3차원 설계정보를 연계할 4차원 설계 정보 연구가 활성화되고 있다. 공정과 원가를 통합할 수 있는 EVMS의 관리적 효과와 도형정보와 공정관리를 통합을 통하여 일정관리의 편의 및 효율을 극대화 하는 4차원 CAD(4D CAD)의 시각적 효과를 통합하는 4D-EVMS는 프로젝트 관리의 중요한 도구가 될 수 있다. 이러한 맥락에서, 본 연구의 목적은 발주자 공정/원가 총합관리를 위한 기본요건 도출 및 구현방안 제시에 있다. 이러한 연구의 결과물은 발주자 공정/원가관리의 업무효율 증대뿐만 아니라 실적자료 축적 및 홍보 관점에서도 기대효과를 가진 수 있을 것으로 판단된다.

  • PDF

공사 초기단계에서의 회귀분석을 이용한 최종공사비(EAC) 추정 방법 (The Study on the System to Estimate the Cost by Using Regression in the Early Stage of the Project)

  • 이윤미;이만희;이학기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.274-277
    • /
    • 2006
  • 건설 사업은 다양한 불확실성 및 리스크 요인으로 인하여 사업 수행 과정이 초기 계획대로 수행되고 있는지에 대한 반복적인 성과측정 및 후속 관리 조치가 필요하다. 이러한 성과 측정의 가장 대표적인 기준이 공정, 공사비, 품질이며 특히, 공정과 공사비의 경우 정량적인 평가가 가능하고 통합관리를 통해 효율성을 높일 수 있는 주요 관리 대상이 된다. 이를 위해 EVM(Earned Value Management)기법을 운영하도록 제도화 하였으며 EVM을 활용함으로써 사업 진도율 $15{\sim}30%$ 시점에서 사업의 EAC(Estimate at Completion)와 공정결과를 예측할 수 있다. 본 연구에서는 기존 EAC 추정의 문제점을 제시하고 회귀분석을 이용하여 적정 EAC 변동 범위를 예측한다. 따라서 공동주택 건설사업에서의 공사 수행 중 공정과 공사비의 문제점을 사전에 파악하여 변동 범위의 결과 값을 통해 의사결정자들이 효율적인 의사결정을 할 수 있도록 정보를 제공한 수 있을 것으로 판단된다.

  • PDF

린(Lean) 건설 개념을 도입한 TPMS 시스템에 대한 소개 (Introducing TPMS on applying Lean Construction)

  • 박찬정;정희원;김상철
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.150-153
    • /
    • 2006
  • GS건설은 업계 최초로 EVMS(Earned Value Management System) 관리기법을 바탕으로 공정과 손익을 관리하는 통합 공사관리 시스템인 PMS (Project Management System)을 개발, 1997년부터 전 현장에 적용하여 왔으며, 최근에는 현장업무를 중심으로 일 단위 공정관리 기법 적용과 자재, 인력, 장비의 적시 투입(JIT, Just in Time)을 통하여 보다 효과적인 공사관리를 할 수 있도록 시스템의 지원을 실현하기 위해 TPMS(Total Project Management System)로 확대 구축 중에 있다. TPMS는 린 건설의 주요 사상인 Shielding(할 수 있는 일만 지시하라)과 Make-Ready Process(할 수 있는 일이 많아지도록 "사전준비"를 철저히 하라)를 구현하고 있으며, 이를 통해 현장에서 실제로 진행하고 있는 하루하루의 업무를 시스템에서 계획하고 관리할 수 있도록 구축하고, 그날의 업무진행에 관계된 자재, 인력, 장비의 계획과 실행을 지원하여, 비 가치창출 과정을 최소화하는 역할을 담당하고 있다. 본 자료는 GS건설에서 현재 구축한 TPMS의 개념을 소개하고, 이를 실제 구축한 사례를 보여줌으로써, 새로운 건설문화를 선도하고, 건설산업의 경쟁력을 높이는 데 일조 하고자 한다.

  • PDF

한국형발사체개발사업을 위한 EVMS 적용방안에 관한 연구

  • 서견수;최영인;이효영;홍일희
    • 천문학회보
    • /
    • 제37권2호
    • /
    • pp.152.1-152.1
    • /
    • 2012
  • 한국형발사체개발사업은 대형복합시스템 사업이며, 장기간에 걸쳐 개발이 진행되는 사업이다. 따라서 사업적, 기술적 측면의 불확실성과 위험 등이 존재하며, 이를 적절히 관리 통제하지 못하면 비용 상승, 일정 지연 및 기술성능 요구조건 등의 불만족을 초래한다. 따라서 개발사업 초기단계에서부터 일정, 비용, 기술성능 및 위험관리 등을 위한 종합적 사업관리시스템 구축 및 운용은 개발사업 성공의 주요 관건이다. 현재 한국형개발사업단에서는 이러한 요구조건을 만족시키기 위한 일환으로써 일정 및 비용에 대한 효과적 관리시스템인 EVMS(Earned Value Management System)을 구축하여 운용 중에 있으며, 한국형개발사업에 맞는 최적화된 EVMS을 구축하기 위하여 시스템 커스터마이징 작업을 수행 중에 있다. EVMS의 구축과정에서 가장 고심했던 문제는 WBS 개발과 성과(Earned Value) 측정방법의 선정이었다. WBS의 경우, 개발초기단계에서부터 사업 전체를 포괄하는 완벽한 WBS을 개발하는 것은 상당히 어려운 문제이다. 그러나 사업초기에 존재하는 불확실성 및 위험에도 불구하고 개발을 계속 진행해야 하는 상황은 개발 현장에서 자주 접하게 되는 문제이다. 이러한 문제를 해결하기 위해서 적용하는 유용한 기법이 연동계획하기(Rolling Wave Planning)이다. 한국형개발사업을 위한 EVMS 구축과정에서도 이와 같은 문제에 봉착하게 되어 WBS 개발 시 연동계획하기(Rolling Wave Planning)기법을 적용할 예정이다. 성과(EV) 측정방법의 경우, 퍼센트완료기법과 마일스톤+퍼센트완료기법 등을 선정하여 적용 중에 있다. 현재 연구개발사업의 특성을 고려하여 우선 퍼센트완료기법을 적용하여 성과를 측정하였으나, 성과측정 결과의 주관성 문제로 인하여 마일스톤+퍼센트완료기법을 적용하여 성과(EV) 측정 결과의 객관성을 최대한 확보 할 예정이며, 최종적으로 한국형개발사업에 최적화된 성과측정 기법을 개발할 예정이다.

  • PDF

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

무기체계 연구개발 사업에서의 사업성과관리 적용 이슈 및 고려사항 (Earned Value Management Application Issues and Consideration for Weapon System Development Project)

  • 국승학;김윤희;김용신;유이주
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.41-48
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Especially in a weapon system R&D project, the manager should consider a possibility to change plans in the middle of the project because of uncertainty coming from properties of the R&D project. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a case study of EVM application for weapon system development project. Furthermore, we suggest several solutions for the issues occurring in utilizing EVM.

추계적 EVMS 기반 예비비 산정 방법론 (Contingency Estimation Method based on Stochastic Earned Value Management System)

  • 곽한성;최병윤;이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

Earned Value 기반 프로젝트 관리체계 및 사례연구 (Earned Value based Construction Project Control System)

  • 이유섭;조창연;오규환;김정훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.123-130
    • /
    • 2002
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획${\cdot}$관리함에 있어서 일정, 비용, 성과측정, 현금흐름(cash flow)예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리한 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

  • PDF

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF