DOI QR코드

DOI QR Code

Earned Value Management base on System Engineering Process in the Weapon R&D Project

무기체계개발 사업에서 체계공학 프로세스 기반 사업성과관리 수행 방안

  • Published : 2015.12.31

Abstract

It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a performing method for EVM based on system engineering process.

Keywords

References

  1. Guideline Num. 29, Revised Guidelines for Earned Value Management, DAPA, 2012.
  2. Guideline Proposal, Guidelines for System Engineering, DAPA, 2014.
  3. Joongyoon Lee, The Scope an Relationship of Project Management and System Engineering Management, KOSSE Journal Vol 10 No2, 2014.
  4. Jae Deok Jang et al. Case study of the System Engineering Tool Infra Construction for System Engineering Application and Vitalization, KOSSE Journal Vol 6 No2, 2010.
  5. Cheol Ho Park et al. A Study on the Construction Procedure of the CASE Environment, KOSSE Journal Vol 6 No2, 2010.
  6. ANSI-748-A, Earned Value Management Systems, 2002.
  7. Park Pae Seok et al., Earned Value Management in 2008 for the Project of Ulsan-I Class Full-Mounted Sonar, ADDR-517-091841, 2009.
  8. Cho Sang Hoon et al., Earned Value Management Plan and Result in 2010 for the project of Jang Ho Go-III Sonar System, ADDR-517-110340, 2011.
  9. Dokko Wook et al., Earned Value Management Plan in 2013 for the project of Tiger-Shark Heavy Weight Torpedo, ADDR- 216-130119, 2013.
  10. Cheon Myung Seok, Earned Value Management Systems Analysis of M-SAM System, ADDR-516-081463, 2008.
  11. Lee Kyungyong et al., Earned Value Management Plan(2.75〃 Guided Rocket System Development Project), ADDR-216-150904, 2015.
  12. Kin Se ho et al., Earned Value Management Planning for the development program of MUAV in 2015, ADDR-501-151250, 2015.
  13. Choi Dae Kyu et al., Earned Value Management Implementation of Tatical ELINT, ADDR-517-091651, 2009.
  14. You Yi Ju et al., Earned Value Management planning and result analysis for the TICN full scale development in 2011, ADDR-225-121356, 2012.
  15. Seung Hak Kuk et al. Earned Value Management Application Issues and Consideration for Weapon System Development Project, KOSSE Journal Vol 11 No1, 2015.
  16. Kim Yun Hee et al. A Study of Improvement Method for EVMS Report System at the Weapon System R&D Project, KIMST, 2015.