• Title/Summary/Keyword: EPC 프로젝트

Search Result 49, Processing Time 0.023 seconds

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

EPC Plant Project Lessons Learned Utilization Analysis (EPC 플랜트 프로젝트의 성공/실패사례 활용도 분석)

  • Yang, Sihoon;Kang, Taek-Ki;Cho, Young Duk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.39-47
    • /
    • 2021
  • As domestic construction companies, which used to be concentrated in the Middle East, have expanded their overseas orders to new markets in Asia and Latin America, they have to cope with various conditions. The EPC plant project, which undertakes construction projects such as civil engineering and construction, design, purchase, construction and commissioning, has expanded its scope. As a result, it is important to collect Lessons Learned from the previous project, systematize it, and use it to respond to changes in the environment. However, many employees do not share their skills or experiences voluntarily. To do so, it is necessary to create and systematize a culture that shares experience and technology. In order to understand and analyze the current situation, a questionnaire was conducted on the EPC project-related departments of construction companies implementing the EPC plant project. About 74% of the participants said Lessons Learned's collection and utilization helped. About 53% of the people who collected and registered actual cases and 39% of the people who had experience in preventing problems using cases were identified as employees' perception and utilization of Lessons Learned systems. Detailed analysis showed differences in workplace, duties, and rank. Through this study, the current status of Lessons Learned collection and utilization of EPC plant projects is understood, and the research on collection and utilization improvement is being carried out.

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

An exploratory study on the collaboration mechanism in project-based business : focused on supply chain institutions and operational efficiency (프로젝트형 사업에서 협업기제에 대한 탐색적 연구 : 공급망 제도와 운영효율성을 중심으로)

  • Cho, Namhyung
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.10
    • /
    • pp.173-183
    • /
    • 2019
  • The purpose of research is to explore the direction of building a collaborative supply chain, which may enhance the competitiveness of firms and their project-based supply chain. Large-scale plants or large-scale buildings construction is referred to as a EPC project. To identify a collaboration mechanism in the project-based supply chain, the empirical research was conducted on the interrelationship between the absorption capacity of firms participating in the EPC project, the incentive norms, the goal congruence with supply chain, and the ability of respond to changes of the task of supply chain. PLS-SEM was used as an analysis method to verify the research model. It is expected that the results will help inform the need for SCM, the importance of the incentive norms and the goal congruence in the supply chain of EPC project.

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

OpenNVF기반 vEPC 구성

  • Kim, Yeong-Han;Seon, Gyeong-Jae
    • Information and Communications Magazine
    • /
    • v.32 no.7
    • /
    • pp.34-39
    • /
    • 2015
  • 본고에서는 최근 활발하게 연구되고 있는 네트워크 가상화 기술인 NFV(Network Functions Virtualization)과 오픈 플랫폼 개발 프로젝트인 OPNFV에 대해 소개한다. 또한 가상화 기반의 이동통신망 구조인 vEPC 구현을 위한 요구사항 및 관련 연구들을 소개하고, 실 구현된 vEPC 테스트베드를 소개한다.