세계적으로 환경적으로 건전한 지속가능한 발전을 위한 수단인 환경영향평가는 지역과 국가의 경제사회적 특성과 어울려서 발전하고 있다. 특히 한국에서는 개발과 그로 인한 환경오염을 사전에 저감시키기 위한 수단으로, 환경부, 지속가능발전위원회를 중심으로 법개정, 새로운 제도와 기법의 도입을 지속적으로 추진하고 있다. 환경영향평가는 생태영향평가, 사회영향평가, 누적영향평가, 전략환경평가, 환경위해성평가를 통합하는 방향으로 진행되고 있으며, 한 국가의 문제뿐 아니라 국경간의 문제에 직면하고 있다. 환경영향평가는 사업뿐 아니라 정책을 포함하는, 국가의 공간계획과 자원관리를 환경영향평가 과정에 통합하여야 할 것이다.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2005.11a
/
pp.55-58
/
2005
This study was Performed to grasp of the problem and improvement in traffic noise environmental impact assessment(EIA). National institute of environmental research(NIER) traffic noise prediction model is in general use in internal EIA. In this study, NIER noise prediction model need to improve in that the predicted results lower than the measured results. The other predict model(KLC KEI) is more accurate. Also the volume and speed of traffic is need to standardize in traffic noise prediction.
The harbor construction projects can lead to various marine environmental problems including habitat degradation and loss, marine water pollution, change of flow patterns, erosion, scour, sedimentation, and so on. The EIA is a measure to prevent various environmental problems in advance from examining and minimizing the environmental impacts before the proposed developments are implemented. In addition, institutions reviewing EIA reports have made efforts to conduct scientific and standardized EIA by applying EIA guidelines for each project. This study aims to create a EIA guideline focusing on the harbor construction projects. Based on the review comments of the harbor construction EIA reports for the past 13 years (2009-2021) and the EIA guidelines of different types of projects, we identified the marine environmental problems and provided the appropriate guideline. This guideline summarizes and presents the contents which must be reviewed in the baseline condition survey, impact assessment, mitigation, and post-environmental impact investigation in the fields of marine fauna and flora, marine physics, and marine water and sediment quality. In the case of a baseline condition survey of marine fauna and flora, a method for selecting survey points considering the characteristics of sea area and project was presented. When estimating the impact of marine fauna and flora, we presented methods for predicting the impact on them due to the spread of suspended sediments and the damage to benthic habitats due to dredging and reclamation. In consideration of the characteristics of the sea area, we divided the survey items of the marine physics into essential items and supplementary items. In predicting the impact of marine physics, various methods for major issues such as seawater circulation, suspended sediment and bottom sediment transport, water temperature and salinity diffusion, seawater exchange, wave transformation, harbor tranquility, and shoreline change were presented. The research results will contribute to protect the marine environment by inducing more systematic and scientific surveys, impact assessments, and mitigation in the EIA process.
Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.
Journal of the Korean Society of Groundwater Environment
/
v.6
no.2
/
pp.66-75
/
1999
This work was initiated to investigate current situation and problems in applying groundwater-related models for various kinds of environmental impact assessment in Korea. and therefore. to enhance appropriate application in the future. This study was carried out with 544 and 16 documents of EIA (Environmental Impact Assessment. Law of Environmental Impact Assessment) and Mineral-Water EIA (“the environmental impact investigation for mineral water developments”; Law of Drinking Water Management). respectively. It was revealed that there were considerably many cases which may cause serious impacts on subsurface environments in EIA. However. none applied groundwater models. Generally, the influences on subsurface system were underestimated or even ignored in EIA. For Mineral-Water EIA. groundwater models wert applied. in general. But. numerous and serious problems were noted: limited number of calibration parameters and parameter types. setting boundary conditions without adequate bases. recharge rates several times higher than precipitation rates. numerically unstable results. etc. Such kinds of misusages seem to be caused by modelers larking in professional knowledges. To solve the problems revealed from this study. more systematic re-education programs are suggested.
In this study, we individualize the clauses to sort out the troubled ones, draw up a interrelation model in order to visually organize the relations, and finally, suggest the desirable application idea. The interrelation model suggested in this study has been made based on the matrix method. On this matrix, we arranged the environmental factors on horizontal and vertical axis, and when we describe the relation of each factors, we set the horizontal axis as the base and divided the content into three grades : Fine, Medium, and Poor. In addition to that, we expressed those three grades into numerical value like 3 points for Level Fine, 2 points for Level Medium, and 1 point for Level Poor and then, we converted this numerical values into index numbers. We could classify the index numbers such as AS, PS, Q-index, P-index. AS is an index numerically shows the degree of giving environmental effect, PS is an index numerically shows the degree of receiving environmental effect, Q-index is an index shows the aggravate degree, and P-index shows the relation degree. The Q/P-index with large numbers has considerable effect on the environmental system, while the small numbered Q/P-index barely effect on the environmental system. Moreover, we classified the environmental factors into 5 levels(I~V) according to the relations between the Q-index and P-index. Level I is less affected by the environment and has more giving effect, while Level V is more sensitively affected by the environment and has more receiving effect, which we considered important. Therefore, we could come up with the result that if we consider the each level of factors when we evaluate the EIA, the result would be far more accurate and reliable since it contains mutual relation aspect of EIA. The suggested interrelation model in this thesis is presentable as one of those scoping system. We highly believe the need of scoping system in EIA and suggest the interrelation model as the alternative idea for scoping system.
The choice of big public investment project needs an appropriate feasibility analysis before it is implemented, bemuse a rot wisely chosen one would bring about big and longrun societal costs. But the feasibility analysis for the big public investment project in Korea has been done without linking the economic benefits and environmental damages. Consequently social conflicts arose frequently during and after project implementation, owing to such concerns asincreasing costs and serious ecological damages. The recent social conflict over the Saemangeum Project is a typical case. This reclamation project began in 1991 and finished 60% of the whole process in 1999, when its feasibility was again assessed under the public pressure by the joint assessment team consisting of both citizen's and government's professionals. Even the assessment report by this joint team could not show the convincing results owing to the improper assessment procedure and failure to set proper feasibility criteria. This paper pointed out the limitations of our current procedure of feasibility assessment and identified the concrete problems that atosee during the recent reassessment process of the Saemangeum reclamation project by the joint team. In order to improve the current problem-ridden practices, it is concluded by the policy recommendation for establishing a right feasibility assessment procedure for the public investment projects.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2006.05a
/
pp.289-291
/
2006
The noise pollution caused by air traffic is one of the popular environmental issues, which consistently gives rise to public discussion today especially among local residents near airports. But, because there is a growing tendency that large residential areas are constructed in flatlands around airports due to a high population density, the importance of the EIA in connection with aircraft noise is increased to take precautionary measures. Therefore, this paper examines the present status and the improvement plan of aircraft noise impact assessment.
In the Republic of Korea, the target project scope of the small-scale EIA is stipulated as the plan area above around 5,000~60,000m2 depending on a type of project and classification of land use. Whereas, the lower limit of the corresponding local government EIA project is generally located above the small-scale EIA's limits, and overlapping ranges exist. This situation has been enlarged since road construction and district unit planning were included as the target projects for small-scale EIA in the "Enforcement Decree of the Environmental Impact Assessment Act", which was partially revised in November 2016, and the current consultation system needed discussion in that small-scale EIA is allowed to be done without gathering review opinions at the local level. In fact, projects subjected to local government EIA but consulted as small-scale EIAs may seem insignificant because of a small number of total cases; however, it is worth paying attention to the fact that a local government may not add a target project due to the small-scale EIA. This study suggested the three policy measures for improving small-scale EIA to enhance the effectiveness of local government EIA: supplementing the institutional arrangements to incorporate the review opinion from the local region in small-scale EIA, giving priority to local EIA for conducing the projects in overlapping ranges with partial amendments on EIA law regarding exceptions to local government EIA, including small target projects (not to be small-scale EIA targets) to the ordinance that are deemed necessary to be conducted as local government EIA. Even though a positive function of small-scale EIA has been confirmed, efforts should be made to improve the situation in which many projects within local governments are consulted without review from the region.
This paper diagnosed the assessment problems and development types of the simple statement of the Sea Area Utilization Consultation System. and suggested the key assessment items for system improvement. The major types of Public Water occupation and use, and distribution characteristic of regional and coastal were analyzed by evaluate 529 review items during 2010-2012. The artificial structure installation including harbor and fishing port facilities in the South and West coast, and seawater supply and drainage for land-based aquaculture and power plant were dominated. The checklists considering each types of occupation and use in Public Water were suggested. In addition, policy proposals for system improvement were suggested.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.