• Title/Summary/Keyword: Dynamic constraint

Search Result 446, Processing Time 0.024 seconds

Redundancy Optimization for the Mixed Reliability System

  • Sok, Yong-U
    • Journal of the military operations research society of Korea
    • /
    • v.26 no.2
    • /
    • pp.143-158
    • /
    • 2000
  • This paper deals with the problem of redundancy allocation for the mixed reliability system in an optimal way. Two kinds of the reliability system are considered for optimal allocation of parallel redundancy. The problem is approached as the optimization problems using th standard method of dynamic programming(DP). The algorithm for solving the optimal redundancy allocation is proposed and then the DP algorithm is applied to two numerical examples such as maximization of reliability subject to an allowable cost-constraint and minimization of the total cost subject to the specified minimum reliability-constraint. A consequence of this study is that the developed computer program package can be applied to the optimal redundancy allocation for the mixed reliability system.

  • PDF

An Efficient Multibody Dynamic Algorithm Using Independent Coordinates Set and Modified Velocity Transformation Method (수정된 속도변환기법과 독립좌표를 사용한 효율적인 다물체 동역학 알고리즘)

  • Kang, Sheen-Gil;Yoon, Yong-San
    • Proceedings of the KSME Conference
    • /
    • 2001.06b
    • /
    • pp.488-494
    • /
    • 2001
  • Many literatures, so far, have concentrated on approaches employing dependent coordinates set resulting in computational burden of constraint forces, which is needless in many cases. Some researchers developed methods to remove or calculate it efficiently. But systematic generation of the motion equation using independent coordinates set by Kane's equation is possible for any closed loop system. Independent velocity transformation method builds the smallest size of motion equation, but needs practically more complicated code implementation. In this study, dependent velocity matrix is systematically transformed into independent one using dependent-independent transformation matrix of each body group, and then motion equation free of constraint force is constructed. This method is compared with the other approach by counting the number of multiplications for car model with 15 d.o.f..

  • PDF

Steady-state Equilibrium Analysis of a Multibody System Driven by Constant Generalized Speeds (일정 일반속력으로 구동되는 다물체계의 정상상태의 평형해석)

  • Choi, D.H.;Park, J.H.;Yoo, H.H.
    • Proceedings of the KSME Conference
    • /
    • 2001.06b
    • /
    • pp.465-470
    • /
    • 2001
  • This paper presents an algorithm which seeks steady-state equilibrium positions of constrained multibody systems driven by constant generalized speeds. Since the relative coordinates are employed, the constraint equations at cut joints are incorporated into the formulation. The proposed algorithm leads to nonlinear equations that need to be solved iteratively. This algorithm should satisfy both types of conditions: the force equilibrium equations and the kinematic constraint equations. To verify the effectiveness of the proposed algorithm, two numerical examples are solved and the results are compared with those of a commercial program. This method, compared to the conventional method of using dynamic analysis, has the advantage of computational efficiency and stability.

  • PDF

A Study on the Dynamic Scheduling for Distributed Management Systems (분산관리 시스템을 위한 동적 스케쥴링의 연구)

  • Chung, Nam-Kee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.2
    • /
    • pp.207-216
    • /
    • 1995
  • Constructing a distributed management system has its own advantages in addressing the issue of implementing a quick responsive management system in dynamically changing environment of enterprise. We suggest a basic scheduling methodology applicable to a distributed production management system. A new concept of "flexible schedule" is introduced as a tool to accommodate dynamically changing situations of job shops. Then a search technique (referred to as CSP-CBA search) is presented to obtain such a schedule for the job shop scheduling problem, which is converted into a constraint satisfaction problem(CSP), by using the constraint based analysis(CBA). This approach is tested on more than 100 test problems. The results show that the suggested approach required shorter CPU time and solved more problems in given time than another fixed schedule method.

  • PDF

Accelerating RFID Tag Identification Processes with Frame Size Constraint Relaxation

  • Park, Young-Jae;Kim, Young-Beom
    • Journal of information and communication convergence engineering
    • /
    • v.10 no.3
    • /
    • pp.242-247
    • /
    • 2012
  • In the determination of suitable frame sizes associated with dynamic framed slotted Aloha used in radio frequency identification tag identification processes, the widely imposed constraint $L=2^Q$ often yields inappropriate values deviating far from the optimal values, while a straightforward use of the estimated optimal frame sizes causes frequent restarts of read procedures, both resulting in long identification delays. Taking a trade-off, in this paper, we propose a new method for determining effective frame sizes where the effective frame size changes in a multiple of a predetermined step size, namely ${\Delta}$. Through computer simulations, we show that the proposed scheme works fairly well in terms of identification delay.

Feasible Power Exchange between Russia and ROK Power Systems

  • Kim Jong-Yul;Lee Seung-Ryul;Yoon Jae-Young;Kim Ho-Yong
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.3
    • /
    • pp.221-227
    • /
    • 2005
  • This paper evaluates minimum and maximum power exchange considering economic and technical characteristics between Russia and ROK. First, we evaluate minimum power exchange to assure the economic feasibility by comparison with the total cost and benefit of the interconnected line. For evaluating maximum exchange power, system constraints are considered, which are examined through load flow and dynamic analysis by using the PSS/E program. As a result of these evaluations, we suggest the reasonable range of power exchange between ROK and Russia considering economic and technical constraints with the interconnection scenario that power system interconnection between ROK and Russia will be realized in the year 2010.

A Three Dimensional Wheelset Dynamic Analysis considering Wheel-rail Two Point Contact (차륜-레일 2점 접촉을 고려한 3차원 윤축 동역학 해석)

  • Kang, Ju-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.1
    • /
    • pp.1-8
    • /
    • 2012
  • Wheelset dynamic analysis is a key element to determine the degree of accuracy of railway vehicle dynamics. In this study, a three-dimensional wheelset dynamic analysis is presented in such a way that the precise wheel-rail contact analysis in three-dimension is implemented into the dynamic equations of a wheelset. A numerical procedure that can be used for the analysis of a wheelset dynamics when the wheel-rail two point contact occurs in a cornering maneuver is developed. Numerical solutions of the constraint equations and the dynamics equations of a wheelset are achieved by using Runge-Kutta method. The proposed wheelset dynamic analysis is validated by comparison against results obtained from VI-RAIL analysis.

An Efficient Voltage Scheduling for Embedded Real-Time Systems with Task Synchronization (태스크 동기화가 필요한 임베디드 실시간 시스템에 대한 효율적인 전압 스케쥴링)

  • Lee, Jae-Dong;Hur, Jung-Youn
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.35 no.6
    • /
    • pp.273-283
    • /
    • 2008
  • Many embedded real-time systems have adopted processors supported with dynamic voltage scaling(DVS) recently. Power is one of the important metrics for optimization in the design and operation of embedded real-time systems. We can save considerable energy by using slowdown of processor supported with DVS. In this paper, we propose heuristic algorithms to calculate task slowdown factors for an efficient energy consumption in embedded real-time systems with task synchronization. The previous algorithm has a following constraint : given the tasks are ordered in a nondecreasing order of their relative deadline, the task slowdown factors computed are in a nonincreasing order. In this paper, we relax the constraint and propose heuristic algorithms which have the same time complexity that previous algorithm has and can save more energy. Experimental results show that the proposed algorithms are energy efficient.

Effect of Game-Based Balance Training with CIMT on Pain, Muscle Strength, Range of Motion and Dynamic Balance in Female Patients with Total Knee Replacement

  • Lee, Hyo Bin;Choi, Ho Suk;Shin, Won Seob
    • The Journal of Korean Physical Therapy
    • /
    • v.30 no.5
    • /
    • pp.159-165
    • /
    • 2018
  • Purpose: The aims of this study were to determine if game-based training with constraint-induced movement therapy (CIMT) is effective in improving the balance ability in female patients with a total knee replacement, and to provide clinical knowledge of CIMT game-based training that allows the application of total knee replacement. Methods: Thirty-six patients who had undergone a total knee replacement were assigned randomly to CIMT game training (n=12), general game training (n=12), and self-exercise (n=12) groups. All interventions were conducted 3 times a week for 4 weeks. All patients used a continuous passive motion machine 5 times a week and 2 times a day for 4 weeks. The visual analog scale (VAS), muscle strength of knee flexion and extension, and range of motion (ROM) of knee flexion and extension were assessed, and the functional reach test (FRT), and timed up and go (TUG) test were performed to evaluate the balance ability. Results: All 3 groups showed significant improvement in the VAS, knee flexion and extension muscle strength, FRT, and TUG test after the intervention (p<0.05). Post hoc analysis revealed significant differences in FRT, and TUG of the CIMT game training group compared to the other group (p<0.05). Conclusion: Although the general game training and CIMT game training improved both the knee extension muscle strength and dynamic balance ability, CIMT game training had a larger effect on dynamic balance control.

Nonlinear Modeling and Dynamic Analysis of Flexible Structures Undergoing Overall Motions Employing Mode Approximation Method

  • Kim, Jung-Young;Hyun, Sang-Hak;Yoo, Hong-Hee
    • Journal of Mechanical Science and Technology
    • /
    • v.16 no.7
    • /
    • pp.896-901
    • /
    • 2002
  • This paper presents a nonlinear modeling method for dynamic analysis of flexible structures undergoing overall motions that employs the mode approximation method. This method, different from the naive nonlinear method that approximates only Cartesian deformation variables, approximates not only deformation variables but also strain variables. Geometric constraint relations between the strain variables and the deformation variables are introduced and incorporated into the formulation. Two numerical examples are solved and the reliability and the accuracy of the proposed formulation are examined through the numerical study.