• Title/Summary/Keyword: Duration Estimation

Search Result 431, Processing Time 0.027 seconds

Ontology for estimating excavation duration for smart construction of hard rock tunnel projects under resource constraint

  • Yang, Shuhan;Ren, Zhihao;Kim, Jung In
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.222-229
    • /
    • 2022
  • Although stochastic programming and feedback control approaches could efficiently mitigate the overdue risks caused by inherent uncertainties in ground conditions, the lack of formal representations of planners' rationales for resource allocation still prevents planners from applying these approaches due to the inability to consider comprehensive resource allocation policies for hard rock tunnel projects. To overcome the limitations, the authors developed an ontology that represents the project duration estimation rationales, considering the impacts of ground conditions, excavation methods, project states, resources (i.e., given equipment fleet), and resource allocation policies (RAPs). This ontology consists of 5 main classes with 22 subclasses. It enables planners to explicitly and comprehensively represent the necessary information to rapidly and consistently estimate the excavation durations during construction. 10 rule sets (i.e., policies) are considered and categorized into two types: non-progress-related and progress-related policies. In order to provide simplified information about the remaining durations of phases for progress-related policies, the ontology also represents encoding principles. The estimation of excavation schedules is carried out based on a hypothetical example considering two types of policies. The estimation results reveal the feasibility, potential for flexibility, and comprehensiveness of the developed ontology. Further research to improve the duration estimation methodology is warranted.

  • PDF

Estimation of Leaf Wetness Duration Using An Empirical Model

  • Kim, Kwang-Soo;S.Elwynn Taylor;Mark L.Gleason;Kenneth J.Koehler
    • Proceedings of The Korean Society of Agricultural and Forest Meteorology Conference
    • /
    • 2001.06a
    • /
    • pp.93-96
    • /
    • 2001
  • Estimation of leaf wetness duration (LWD) facilitates assessment of the likelihood of outbreaks of many crop diseases. Models that estimate LWD may be more convenient and grower-friendly than measuring it with wetness sensors. Empirical models utilizing statistical procedures such as CART (Classification and Regression Tree; Gleason et al., 1994) have estimated LWD with accuracy comparable to that of electronic sensors.(omitted)

  • PDF

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

The Flow rate estimation of CSOs using EC Data (전기전도도를 이용한 CSO의 유량 추정)

  • Choi, Weon-Suk;Song, Chang-Soo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.5
    • /
    • pp.751-757
    • /
    • 2011
  • The monitoring technique based on electrical conductivity (EC) can provide researchers with some advantages in maintenance management and is cost-effective as compared with existing CSOs monitoring. In this study, the flow rate estimation using EC data was executed in two sites where storm overflow chamber had installed. In the result of A-site, R2 of second order multinomial between dilution ratio of EC and observed flow rate was showed the range of 0.68 ~ 0.77. And $R^{2}$ of B-site was 0.62 ~ 0.81. On the other hand, cumulative frequency of A-site was 43.4 ~ 52.2% in the relative error level of under 20%. And B-site was 10.1 ~ 46.5%. The flow rate estimation formula was improved through consideration of some parameters including antecedent dry days and rainfall duration. And difference between estimated flow rate and observed flow rate in total rainfall event was very small.

Analysis on the factors influencing layout for production-installation work of Free-form Concrete Panels in PCM mold (PCM mold 측면에서 FCP 생산-설치 레이아웃 영향요인 분석)

  • Lim, Jeeyoung;Lee, Donghoon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.121-122
    • /
    • 2015
  • The demand on free-form buildings is gradually increasing, but there are several problems such as increased cost and construction duration, and decreased constructability at the construction phase upon construction of a building owing to the difficulty of member production-installation. To solve these problems, a technology to produce FCP using a CNC machine was developed. Basically, it delivers the information on a free-form building designed to the CNC machine, the shapes of RTM and PCM are created using the information delivered and FCP are produced with the RTM and PCM which act as forms. Since the construction duration and project cost are limited on site, the efficiency of FCP production-installation is significant for application of the technology. For it is almost impossible to change the production-installation layout and process once they are set in the construction phase, they should be carefully determined. Before the production-installation layout are established, it is necessary to analyze the factors that influence the duration. Thus, the study intends to analyze influence factors in PCM mold on estimation of the production-installation duration for FCP. According to the analysis of influence factors, a simulation model for estimation of the duration that changes depending on the constraint conditions can be built.

  • PDF

Dysfunction of Time Perception in Children and Adolescents with Attention-Deficit Hyperactivity Disorder

  • Shin, Dong-Won;Lim, Se-Won;Shin, Young-Chul;Oh, Kang-Seob;Kim, Eun-Jin;Kwon, Yun-Young
    • Journal of the Korean Academy of Child and Adolescent Psychiatry
    • /
    • v.27 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Objectives: Children with attention-deficit hyperactivity disorder (ADHD) may have deficits in time perception, as assessed by the time estimation task and the time reproduction task, however its age-related trajectory is not yet determined. Therefore we examined the correlation between accuracy of time perception tasks and age, and the association between accuracy of estimation tasks and reproduction tasks. Methods: Sixty-three patients with ADHD, aged 8 to 18 years tested the tasks for five time durations (2, 4, 12, 45, and 60 seconds). Accuracy of tasks was assumed differences (absolute values) between raw results of tasks and original time durations. Spearman's correlation analysis was performed to determine correlation between accuracy of time perception tasks and age. Multivariate regression was used to determine the association of accuracy of estimation tasks with accuracy of reproduction tasks. Results: Age showed correlation with accuracy of estimation tasks, but not with that of reproduction tasks. We observed that the higher the accuracy in 12, 45, and 60 seconds duration time reproduction, the higher the accuracy in longer seconds duration time estimation. Conclusion: Age was correlated with time estimation accuracy whereas there was no impact on time reproduction accuracy. Association of each of the two time perception tasks, particularly in longer time duration, suggested specific impairments in time perception.

A Study on the application of Critical Rainfall Duration for the Estimation of Design Flood (설계홍수량 산정에 따른 임계지속시간의 적용성에 관한 연구)

  • Chang, Seong Mo;Kang, In Joo;Lee, Eun Tae
    • Journal of Wetlands Research
    • /
    • v.6 no.3
    • /
    • pp.119-126
    • /
    • 2004
  • In recent, the critical rainfall duration concept is widely used but we do not have understandable criteria yet. However, the critical rainfall duration is usually calculated considering concentration time, runoff model using effective rainfall, and unit hydrograph for the estimation of design flood. This study is to derive the regression equations between the critical rainfall duration and hydrologic components such as the basin area, slope, length, CN, and so on. We use a GIS tool which is called the ArcView for the estimation of hydrologic components and the HEC-1 module which is provided in WMS model is used for the runoff computation. As the results, the basin area, basin slope, and basin length had a great influence on the estimations of peak runoff and critical rainfall duration. We also investigated the sensitivities for the peak runoff and critical duration of rainfall from the correlation analysis for the involved components in the runoff estimation.

  • PDF

A Development of Work Item and Duration Estimation Method for 3D Printing based Building (건축물 3D 프린팅 공정 도출 및 공기 산정방식 개발)

  • Park, Hyung-Jin;Seo, Myoung-Bae;Ju, Ki-Beom
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.200-207
    • /
    • 2017
  • 3D printing is making a huge difference to existing industries and is beginning to be applied in the field of construction. 3D printing construction differs from existing construction techniques. Therefore, new construction processes need to be developed. In particular, the accurate construction duration is linked directly to a successful project. A method for estimating the construction duration for 3D printing construction is necessary. In this study, a 3D printing construction process and duration estimation method were derived to prepare for the future introduction of 3D printing in construction. The scope of the study was assumed to be 3D printing equipment capable of pouring concrete, and limited to a frame structure construction. The developed construction period estimation method was applied to the virtual test model. As a result of applying the test model, the construction duration was shortened by approximately 50% compared to the existing construction technique. The method of estimating the construction period developed in this study can be applied to 3D printing constructions in the future and help establish a business plan.

Dam Failure and Unsteady Flow Analysis through Yeoncheon Dam Case(I) -Analysis of Dam Failure Time and Duration by Failure Scenarios and Unsteady Flow - (연천댐 사례를 통한 댐 파괴 부정류해석 및 하류 영향 검토(I) -댐 파괴 시나리오와 부정류 해석을 통한 지속시간 및 파괴시간 해석-)

  • Jang, Suk-Hwan
    • Journal of Environmental Science International
    • /
    • v.17 no.11
    • /
    • pp.1281-1293
    • /
    • 2008
  • This study aims at the estimation of dam failure time and dam failure scenario analysis of and applied to Yeoncheon Dam which was collapsed August 1st 1999, using HEC-HMS, DAMBRK-FLDWAV simulation model. As the result of the rainfall-runoff simulation, the lancet flood amount of the Yeoncheon Dam site was $10,324\;m^3/sec$ and the total outflow was $1,263.90\;million\;m^3$. For the dam failure time estimation, 13 scenarios were assumed including dam failure duration time and starting time, which reviewed to the runoff results. The simulation time was established with 30 minutes intervals between one o'clock to 4 o'clock in the morning on August 1, 1999 for the setup standard for each case of the dam failure time estimation, considering the arrival time of the flood, when the actually measured water level was sharply raising at Jeongok station area of the Yeoncheon Dam downstream, As results, dam failure arrival time could be estimated at 02:45 a.m., August 1st 1999 and duration time could be also 30 minutes. Those results and procedure could suggest how and when dam failure occurs and analyzes.

Comparison of incoming solar radiation equations for evaporation estimation (증발량 산정을 위한 입사태양복사식 비교)

  • Rim, Chang-Soo
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.129-143
    • /
    • 2011
  • In this study, to select the incoming solar radiation equation which is most suitable for the estimation of Penman evaporation, 12 incoming solar radiation equations were selected. The Penman evaporation rates were estimated using 12 selected incoming solar radiation equations, and the estimated Penman evaporation rates were compared with measured pan evaporation rates. The monthly average daily meteorological data measured from 17 meteorological stations (춘천, 강능, 서울, 인천, 수원, 서산, 청주, 대전, 추풍령, 포항, 대구, 전주, 광주, 부산, 목포, 제주, 진주) were used for this study. To evaluate the reliability of estimated evaporation rates, mean absolute bias error(MABE), root mean square error(RMSE), mean percentage error(MPE) and Nash-Sutcliffe equation were applied. The study results indicate that to estimate pan evaporation using Penman evaporation equation, incoming solar radiation equation using meteorological data such as precipitation, minimum air temperature, sunshine duration, possible duration of sunshine, and extraterrestrial radiation are most suitable for 11 study stations out of 17 study stations.