Evaluation of Reducing Cross Section of the Partial Drainage Shield Tunnel Segment using the Model Experiments (축소모형실험을 통한 부분배수 쉴드터널의 세그먼트 단면 축소 가능성 평가)

  • Ma, Sang Joon;Lee, Young Sub;Kim, Dong Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.387-396
    • /
    • 2015
  • The existing shield tunnel has constructed in the concept of non-drainage uniformly, but the leak has become a problem in the construction and management. The Shield tunnel design allowed for the water and earth pressure bring about the increasing segment thickness and the construction costs. In order to improve these problems, the study of the partial drainage shield tunnel is in progress. In this study, th model experiment was performed to confirm the possibility of the partial drainage shield tunnel. And the water and earth pressure was measured in drainage and undrained condition. Based on the results of model experiments, the effect of water pressure reduction was confirmed by reviewed the structure stability of the real design case.

The study on the hydraulic pressure reduction of drainage shield tunnel using model test and field instrumentation (모형실험 및 현장계측을 통한 배수형 쉴드터널의 작용수압 저감 평가)

  • Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.429-440
    • /
    • 2015
  • In this study, model test equipment was developed to evaluate the hydraulic pressure reduction in appling the drainage shield tunnel and the model test for hydraulic pressure difference was performed in case of drainage and undrained conditions. In the result of model test, increase ratio of pore water pressure was decreased in drainage condition and total stress in drainage condition was smaller than that in undrained condition, so the hydraulic pressure was reduced by the groundwater inflow into the model tunnel. In the result of field instrumentation, the hydraulic pressure in the back ground of shield tunnel was small by 11~22% in comparison with the calculated hydraulic pressure ($r_w{\cdot}H$) in same groundwater level. In the result of model test and field instrumentation, it was appeared in drainage and undrained conditions that the difference between the theoretical hydraulic pressure and the real hydraulic pressure. It shows that it is possible to apply the reduced hydraulic pressure in applying the drainage shield tunnel and to reduce the segment section due to hydraulic pressure reduction.

A Physical Model Test on Behavior of Shield-tunnel Lining according to Drain Conditions (배수조건에 따른 쉴드터널 라이닝의 거동연구를 위한 모형실험)

  • Choi, Gou-Moon;Yune, Chan-Young;Ma, Sang-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.5
    • /
    • pp.55-65
    • /
    • 2014
  • Most shield tunnels are designed based on the assumption of a undrained condition. But they are operated as drained tunnels in which underground water flows and passes through a drainage facility. Therefore, it is necessary that the drainage condition be considered in the shield tunnel design. In this research, new testing device which can simulate the underground tunnel located below ground water level, was developed. Total stress and pore water pressure were examined and an inflow water into an inner pipe was measured using the testing device. Test results showed that the total stress, which was the sum of effective stress and pore pressure, increased more in an undrained condition and an inflow water into an inner pipe was proportional to the water pressure but inversely proportional to the loading stress. Consequently, if the drainage is considered in the shield tunnel design, the more economical design can be expected because of the stress reduction of the lining.

A Physical Model Test on the Behavior of Shield-tunnel Lining According to Drainage Conditions in Weathered Granite Soil (화강풍화토 지반에서 배수조건에 따른 쉴드터널 라이닝의 거동연구를 위한 모형실험)

  • Choi, Gou-Moon;Yune, Chan-Young;Ma, Sang-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.6
    • /
    • pp.71-82
    • /
    • 2015
  • Recently, due to the expansion of urban infrastructure for the citizen convenience, the shield tunnel construction has increased considering the civil complaints minimization and construction stability. Most shield tunnels are designed based on the assumption of the undrained condition that underground water does not inflow, but they are operated in the field as drained tunnels with drainage facility to drain underground water. Therefore, the drained condition needs to be considered in the shield tunnel design. It is also necessary to consider the weathered granite soil that is widely distributed throughout the country and consequently is encountered in most of construction sites. In this paper, the model test which can control total stress and pore water pressure and simulate the underground tunnel located in the weathered granite soil below ground water level is conducted. Total stress, pore water pressure and an inflow water into an inner pipe were measured using the testing device. Test results showed that the total stress in a drained condition was lower than in an undrained condition because pore water pressure decreased in a drained condition and an inflow water into an inner pipe was proportional to the loading stress in a drained condition. As a result, if a drained condition is considered in the shield tunnel design, the more economical design can be expected because of the stress reduction of the lining.

An Experimental Study on Performance of neater Stops at Construction joints in Tunnel (터널 시공이음부에서의 방수재 역할에 대한 실험연구)

  • 백송훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.217-223
    • /
    • 1999
  • Mostly, water leakage took place in construction joints. In case of cable tunnels constructed by open-cut method, waterstops have been used to prevent the water leakage. But, we haven't any experience to install the waterstops in NATM cable tunnels. So, it is necessary to develope the waterstops and test the performance of it in laboratory. We manufactured cable tunnel lining quarter scale model by pouring concrete, and installed the waterstops. After filling the inside of concrete lining about two-third with water, we put the air pressure on the water, In addition, it is also carried out water leakage test for concrete lining model without waterstops. As a result, we confirmed the performance of waterstops and its adaptability. It is also tested that the performance of rubber gaskets used in concrete segments of Shield tunnelling. In addition, we determined the allowable infiltration rate for cable tunnel with non-drainage system.

  • PDF

Development of performance assessment criterion for structures of shield TBM tunnel (쉴드 TBM 터널의 구조물 성능 평가 기준 개발)

  • Seong, Joo-Hyun;Lee, Yu-Seok;Hong, Eun-Soo;Byun, Yo-Seph
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.5
    • /
    • pp.553-561
    • /
    • 2015
  • In this study, the performance assessment criterion for reasonable maintenance of shield TBM tunnel was presented. The performance assessment items such as crack, leakage, breakage, spalling, exfoliation/detachment, efflorescence, quality condition, exposure of steel, carbonation, faulting step, bolts condition, drainage condition, ground condition, contact section condition and conduit condition were selected by analyzing domestic and foreign performance assessment criterions and investigating segment lining deterioration cases through the site investigation and in-depth inspection analysis result on the shield TBM tunnel. In addition, the reasonable weight using AHP (Analytic Hierarchy Process) were estimated.

Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop (쉴드 TBM 세그먼트 지수재의 배열수 변화에 따른 방수성능 평가)

  • Ham, Soo-Kwon;Jung, Hoon;Kim, Beom-Ju;Jeong, Kyeong-han;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.47-58
    • /
    • 2020
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop by the construction error and excessive displacement of segment was studied. In particular, the waterproof capacity of each of single and double layer arrangements of hydrophilic rubber waterstop was examined to verify the efficiency of the double layer arrangement. The test results show that the single layer and double layer hydrophilic rubber waterstop showed the same waterproof performance. hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap.

Waterproofing performance evaluation according to each waterproofing material due to segment construction error (세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가)

  • Heo, Seung-Mu;Jung, Hoon;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1023-1037
    • /
    • 2018
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop and gasket, respectively by the construction error and excessive displacement of segment was studied. The test results show that hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap. On the other hand, gasket has unfavorable on the offset, however favorable on the gap.

Evaluation of waterproof and durability of hydrophilic waterstop (수팽창 지수재의 방수 성능 및 내구성 평가)

  • Choi, Woo-Yong;Lee, Hyeun-Pil;Jun, Gy-Chan;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.117-124
    • /
    • 2014
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic waterstop by the construction error and excessive displacement of segment was studied firstly. Secondly, the decrease of durability of hydrophilic waterstop by the sulphate and chloride contained in the groundwater and seawater was investigated. The results showed that if the angle discordance at the segment joints is beyond the 2 degree, the proper waterproof capacity of hydrophilic waterstop can not be guaranteed. In addition, if the hydrophilic rubber waterstop is exposed to the sulphate for a while, the proper durability of hydrophilic waterstop can not be expected.

A study on hydraulic behaviour and leakage control of segment linings using the numerical method (수치해석을 이용한 세그먼트라이닝의 수리거동과 누수제어 연구)

  • Shin, Jong-Ho;Shin, Yong-Suk;Pam, Dong-In;Chae, Sung-Elm;Choi, Kyu-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.131-140
    • /
    • 2009
  • It has been repeatedly reported that a drainage system of a drained tunnel is deteriorated. And consequently the water pressure on the lining increases with time. However, little research on the watertight tunnel was found in the literatures. According to field measurements, leakage of the undrained tunnel has increased with time, which is completely opposite to the behavior of the drained tunnel. It is evident that the hydraulic deterioration of the tunnel lining changes the water pressure on the lining and the amount of leakage, thus the design coneept in terms of groundwater is not maintained tightly throughout the life time of the tunnel. The Segment lining is generally constructed as watertight. However, it is frequently reported that the leakage in the segment tunnel increases with time. It is also reported that the leakage is generally concentrated at the joints of the segments. In this study structural and hydraulic interaetion of the segment lining due to the hydraulic deterioration of the segments and the joints is investigated using the numerical modeling method. An electric utility tunnel below groundwater table is considered for the analyses. The effects of hydraulic deterioration of the segment lining are identified in terms of ground loading, water pressure and lining behavior. A remedial grouting measure for leakage is also numerically simulated, and its appropriateness is evaluated.