• Title/Summary/Keyword: Distributed Production Planning

Search Result 35, Processing Time 0.03 seconds

Combination of Feature-Based Extraction Process and Manufacturing Resource for Distributed Process Planning (분산공정계획을 위한 특징형상 기반 추출 공정 및 가공자원 조합)

  • Oh, Ick Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.2
    • /
    • pp.141-151
    • /
    • 2013
  • Process planning can be defined as determining detailed methods by which parts can be manufactured from the initial to the finished stage. Process planning starts with determining the manufacturing process based on the geometric shape of the part and the machines and tools required for performing this process. Distributed process planning enables production planning to be performed easily by combining the extracted process and various manufacturing resources such as operations and tools. This study proposes an algorithm to determine the process for a feature-based model and to combine manufacturing resources for the process and implements a distributed process planning system.

Development of Distributed MRP System for Production Planning and Operation in Korean OEM/ODM Cosmetics Manufacturing Company (국내 OEM/ODM 화장품 제조기업의 생산계획 및 효율화를 위한 분산형 MRP시스템 개발)

  • Jang, Dongmin;Shin, Moonsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.133-141
    • /
    • 2020
  • Up to date cosmetic OEM/ODM (original equipment manufacturing/original development manufacturing) industry receives attention as a future growth engine due to steady growth. However, because of limited research and development capability, many companies have employed commercial management platforms specialized for large-sized companies; thus, overall system effectiveness and efficiency is low. Especially, MRP (material requirement planning) system introduced originally in 1970s is employed to calculate the requirement of the parts. However, dynamic nature of production lead time usually results in incorrect requirements. In addition, its algorithm does not consider the capability of the production resources. Also, because the commercial MRP system calculates all subcomponent for fixed period, the more goods have subcomponent, the slower calculation is. Therefore, conventional MRP system cannot respond complicated situation in time. In this study, we will suggest a new method that can respond to complicated situations resulting from short lead time and urgent production order in Korean cosmetic market. In particular, a distributed MRP system is proposed, that consists of multi-functional and operational modules, based on the characteristic of the BOM (bill of material). The distributed MRP system divides components (i.e. products and parts) into several fields and decrease the problem size; thus, we can respond to dynamically changed data any time. Through this solution, we can order components quickly, adjust schedules and planned quantity, and manage stocks reasonably. In addition, a prototype of the distributed MRP system is presented in this paper, in which ERP (enterprise resource planning) sever data is associated with an excel spreadsheet via MSsql. System user interface is implemented by a VBA (visual basic for applications) tool. According to a case study, response rate for delivery and planning achievement rate were enhanced about 20%, and inventory turnover was also decreased. Consequently, the proposed system improves overall profit.

Development of a Component-Based Distributed Supply Chain Planning System (컴포넌트에 기반한 분산 공급사슬계획 시스템 개발)

  • 정한일;박찬권;이기창
    • The Journal of Society for e-Business Studies
    • /
    • v.7 no.2
    • /
    • pp.143-156
    • /
    • 2002
  • The objective of supply chain planning is to satisfy the requirements for minimizing inventory costs, transportation costs, and lead times throughout the supply, production and distribution stage dispersed geographically. Therefore, the supply chain planning system should have functionalities to resolve complex optimization problems that have characteristics of multi-stage and multi-product. Ant the system should also support collaborative decision making among distributed business partners. In this study, we proposed a distributed architecture for the supply chain planning system. To do this, we analyzed functional requirements by using IDEF-0(ICAM Definition-0) methodology, defined required components, and designed each component by using object-oriented methodology. We implemented a prototype system based on CORBA (Common Object Request Broker Architecture) to show that the proposed distributed architecture based on component technology is feasible and can solve supply chain planning problem collaboratively.

  • PDF

Employment Contract-Based Management Model of Production Resources on Relation-Driven Fractal Organization (관계주도형 프랙탈 조직에서의 고용계약 기반 생산자원 관리모형)

  • Shin, Moonsoo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.39 no.4
    • /
    • pp.278-289
    • /
    • 2013
  • Up-to-date market dynamics and intense competition have forced a production system to be more widely distributed and decentralized than ever, and the production system itself can be regarded as a collaborative network of autonomous production resources in which the responsibility of decision making is also decentralized into individual autonomous entities. The conventional resource management models, however, are not suitable for the distributed and decentralized environment because of their centralized nature. In this paper, an agent-based resource management model is proposed. The proposed model applies employment relation-driven fractal organization (FrOrg) into organizational model for distributed production resources and presents a resource management framework based on employment contracts. The fractal organization is a structured association in which a self-similar pattern recursively appears, and employment relations between production resources are recursively constructed throughout the entire production system.

A Hybrid Heuristic Approach for Supply Chain Planningwith n Multi-Level Multi-Item Capacitated Lot Sizing Model (자원제약하의 다단계 다품목 공급사슬망 생산계획을 위한 휴리스틱 알고리즘)

  • Shin Hyun-Joon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.1
    • /
    • pp.89-95
    • /
    • 2006
  • Planning distributed manufacturing logistics is one of main issues in supply chain management. This paper proposes a hybrid heuristic approach for the Multi-Level, multi-item Capacitated Lot Sizing Problem (MLCLSP) in supply chain network. MLCLSP corresponds to a mixed integer programming (MIP) problem. With integer variable solutions determined by heuristic search, this MIP problem becomes linear program (LP). By repeatedly solving the relaxed MIP problems with a heuristic search method in a hybrid manner, this proposed approach allocates finite manufacturing resources fur each distributed facilities and generates feasible production plans. Meta heuristic search algorithm is presented to solve the MIP problems. The experimental test evaluates the computational performance under a variety of problem scenarios.

  • PDF

Internet Based Managing Design and Production Processes in a Distributed Global Environment (인터넷 기반 디자인 및 생산지원 분산환경 프로세스관리 기법 연구)

  • 박화규
    • The Journal of Information Systems
    • /
    • v.9 no.1
    • /
    • pp.217-234
    • /
    • 2000
  • This paper is to develop an information infrastructure to support managing process in design, planning, production, and quality control. Multi-media data set of design, product, and management information flow between organizational units of a virtual enterprise. The process is the logical organization of people, technology and practices incorporated into work activities to make an end product. The core of the infrastructure is the enterprise framework which coordinates activities and controls the process. The proposed framework manages collaborative activities across space and time, and between users and computers who share information in virtual community. It utilizes knowledge distributed through virtual community and fosters cooperation between organizations. The framework provides the following facilities; coordinating activities, sharing data and processes, visualizing multi-media data, customizing and updating processes, reusing data and processes. This paper covers design and manufacturing activities but our focus is initially targeted at design area.

  • PDF

Automated Supervision of Data Production - Managing the Creation of Statistical Reports on Periodic Data

  • Schanzenberger, Anja;Lawrence, D.R.
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.39-53
    • /
    • 2004
  • Data production systems are generally very large, distributed and complex systems used for creating advanced (mainly statistical) reports. Typically, data is gathered periodically and then subsequently aggregated and separated during numerous production steps. These production steps are arranged in a specific sequence (workflow or production chain), and can be located worldwide. Today, a need for improving and automating methods of supervision for data production systems has been recognized. Supervision in this context entails planning, monitoring and controlling data production. Two significant approaches are introduced here for improving this supervision. The first is a 'closely-coupledd' approach (meaning direct communication between production jobs and supervisory tool, informing the supervisory tod immediately about delays in production) - based upon traditional production planning methods typically used for manufacturing (goods) and adopted for working with data production. The second is a 'loosely-coupled' approach (meaning no direct communication between supervisory tool and production jobs is used) - having its origins in proven traditional project management. The supervisory tool just enquires continuously the progress of production. In both cases, dates, costs, resources, and system health information is made available to management. production operators and administrators to support a timely and smooth production of periodic data. Both approaches are theoretically described and compared. The main finding is that, both are useful, but in different cases. The main advantages of the closely coupled approach are the large production optimisation potential and a production overview in form of a job execution plan, whereas the loosely coupled method mainly supports unhindered job execution and offers a sophisticated production overview in form of a milestone schedule. Ideas for further research include investigation of other potential approaches and theoretical and practical comparison.

  • PDF

A Study on the Implementation of Distributed MRP to Increase the Utilization of the MES System in the Automobile Parts Manufacturing Industry (자동차부품 제조업의 MES 시스템 활용도를 높이기 위한 분산형 MRP 구현에 관한 연구)

  • Nam, Eun-Jae;Kim, Kwang-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.24 no.2
    • /
    • pp.127-134
    • /
    • 2022
  • Production management in the automobile parts industry is carried out according to the production plan of the customer, so it is important to prevent shortages in product supply. As the product composition became increasingly complex, the MES System was built for the purpose of efficient production plan management and inventory management, but its utilization is low. This study analyzed the problems of the MES system and sought to improve it. Through previous studies, it was confirmed that the inventory management of the pull approach that actually occurred in the warehouse is more suitable than the push approach based on the forecast of the warehouse for the volatility, complexity, and uncertainty of orders in the auto parts industry. To realize this, we tried distributed MRP by using the ADO function of VBA to link the standard information of the MES system with Excel and change the structure of the BOM table. Through this, it can help increase the accuracy of production planning and realize efficient inventory management, thereby increasing the utilization of the MES system in the auto parts industry and enhancing the competitiveness of the company.

A Study on Integrated Production Planning of Distributed Manufacturing Systems on Supply Chain (공급사슬상의 분산 제조 시스템의 통합생산계획에 관한 연구)

  • Koh, Do-Sung;Yang, Yeong-Cheol;Jang, Yang-Ja;Park, Jin-Woo
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.378-387
    • /
    • 2000
  • As the globalization of manufacturing companies continues, the scope of dependence between these companies and distributors, and other suppliers are growing very rapidly since no one company manufactures or distributes the whole product by themselves. And, the need to increase the efficiency of the whole supply chain is increasing. This paper deals with a multi-plant lot-sizing problem(MPLSP) which happens in a decentralized manufacturing system of a supply chain. In this study, we assume that the whole supply chain is driven by a single source of independent demand and many levels of dependent demands among manufacturing systems in the supply chain. We consider setup cost, transportation cost and time, and inventory holding cost as a decision factor in the MPLSP. The MPLSP is decomposed into two sub-problems: a planning problem of the whole supply chain and a lot-sizing problem of each manufacturing system. The supply chain planning problem becomes a pure linear programming problem and a Generalized Goal Decomposition method is used to solve the problem. Its result is used as a goal of the lot-sizing problem. The lot-sizing problem is solved using the CPLEX package, and then the coefficients of the planning problem are updated reflecting the lot-sizing solution. This procedure is repeated until termination criteria are met. The whole solution process is similar to Lagrangian relaxation method in the sense that the solutions are approaching the optimum in a recursive manner. Through experiments, the proposed closed-loop hierarchical planning and traditional hierarchical planning are compared to optimal solution, and it is shown that the proposed method is a very viable alternative for solving production planning problems of decentralized manufacturing systems and in other areas.

  • PDF

The Novel Configuration for Building Energy System Including Build ins Microgrid (빌딩 마이크로그리드가 포함된 새로운 빌딩에너지 시스템 구축방향에 관한 연구)

  • Hong, Won-Pyo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.235-240
    • /
    • 2008
  • The recent development of efficient thermal prime movers for distributed generation id changing the focus of the production of electricity from large centralized power plants to local generation units scattered over the territory. The scientific communality is addressing the analysis and planning of the distributed energy resources(der) with wide spread approaches, taking into account technical, environmental, economical and social issues. The coupling of cogeneration system to absorption/electric chillers or heat pumps as well as the interactions with renewable sources, allow for setting up multi-generation systems for building cooling heating and power(BCHP) systems of different energy vectors such as electricity, heat(at different enthalpy levels), cooling power, hydrogen, various chemical substances and so forth. Adoption of the composite multi-generation systems may lead to significant benefits in term of higher efficiency, reduced $CO_2$ emissions and enhanced economy. This paper outlines the main aspects of the BCHP system framework, illistrating its characteristics and summarizing the relevant distributed multi-generation structures.

  • PDF