1 |
Lee, Y., Shin, H., and Kim, M., CIM implementation through JIT and MRP integration, IE Interfaces, 1994, Vol. 7, No. 3, pp. 39-51.
|
2 |
Orlicky, J., Materials requirements planning : the new way of life in production and inventory management, McGraw-Hill, 1975.
|
3 |
Plossl, G.W. and Orlicky, J., Orlicky's Material Requirements Planning, McGraw-Hill, 1994.
|
4 |
Seok, J.W. and Chung, B.M., An MRP system of small companies for order-based production, Proceedings of the KSMPE Conference, 2004, pp. 99-103.
|
5 |
Suh, J., A case study on OOP component build-up for reliability of MRP system, Journal of the Korea Safety Management and Science, 2004, Vol. 6, No. 3, pp. 211-235.
|
6 |
Whybark, D.C. and Williams, J.G., Material requirements planning under uncertainty, Decision Sciences, 1976, Vol. 7, No. 4, pp. 595-606.
DOI
|
7 |
Chang, B., Multi-product, multi-site production and transportation scheduling problem, Proceedings of the Korean Operations Research and Management Science Society Conference, 1993, pp. 36-45.
|
8 |
Jung, B., So, Y., Huh, E., Lee, H., Cho, Y., and Kim, J., Development of a production information system for medium and small-sized enterprises, Proceedings of the Korean Operations Research and Management Science Society Conference, 1996, pp. 190-193.
|
9 |
Kim, D., Lee, K.-H., Lee, J.-H., Lee, J.-M., Lee, K., and Kim, J.-H., Integration of ship outfitting BOM with lifecycle stages, Korean Journal of Computational Design and Engineering, 2011, Vol. 16, No. 3, pp. 187-196.
|
10 |
Kim, H. and Kim, P., Material requirements planning for military maintenance depot, Journal of Society of Korea Industrial and Systems Engineering, 2014, Vol. 37, No. 4., pp. 24-34.
DOI
|
11 |
Kim, M., A study of managing strategies for distribution channel in the cosmetic business: focusing on Chinese cosmetic market [master's thesis], [Seoul, Korea] : Sungkyunkwan University, 2012.
|
12 |
Kim, S., Lee, Y., and An, D., A control account planning using material requirement planning in earned value project, Korean Journal of Construction Engineering and Management, 2002, Vol, 3, No. 4, pp. 114-122.
|
13 |
Koh, S. and Kim, J., Implementation of DBR system with Kanban in a production line of static demand, IE Interfaces, 2002, Vol. 15, No. 1, pp. 99-106.
|
14 |
Kung, L. and Chern, C., Heuristic factory planning algorithm for advanced planning and scheduling, Computers and Operational Research, 2009, Vol. 36, No. 9, pp. 2513-253.
DOI
|
15 |
Lee, K., Industry 4.0 and problems of MRP, Proceedings of Korean Institute Of Industrial Engineers Conference, 2017, pp. 2253-2270.
|
16 |
Lee, H., Na, H., and Park, J., Study on performance enhancement of MRP explosion in ERP environment, Proceedings of Korean Society for Precision Engineering Conference, 2005, pp. 40-40.
|
17 |
Lee, J. and Shin, M., A case study on application of dispatching rule-based advanced planning and scheduling (APS) system, Journal of Society of Korea Industrial and Systems Engineering, 2015, Vol. 38, No. 3, pp. 78-86.
DOI
|