1 |
Liu, X., 2000, "CFACA: Component Framework for Feature-Based Design and Process Planning," Computer-Aided Design, Vol. 32, No. 7, pp. 395-460.
|
2 |
Shen, Y. and Shah, J. J., 1998, "Recognition of Machining Features Based on HSPCE Decomposition, and Process Centered Classification," Trans. of the ASME, Vol. 120, pp. 668-678.
|
3 |
Kumar, V., Burns, D., Dutta, D. and Hoffmann, C., 1999, "A Framework for Object Modeling," Computer-Aided Design, Vol. 31, No. 9, pp.541-556.
DOI
ScienceOn
|
4 |
Gu, P., 1994, "A Feature Representation Scheme for Supporting Integrated Manufacturing," Computers & Industrial Engineering, Vol. 26, No. 1, pp. 55-71.
DOI
ScienceOn
|
5 |
Gindy, N. N. Z., Huang, X. and Ratchev, T. M., 1993, "Feature-Based Component Model for Computer-Aided Process Planning Systems," Computer Integrated Manufacturing, Vol. 6, No. 1&2, pp. 20-26.
DOI
|
6 |
Kim, C., Kim, K. and Choi, I., 1993, "An Object-Oriented Information Modeling Methodology for Manufacturing Information Systems," Computers & Industrial Engineering, Vol. 24, No. 3, pp. 337-353.
DOI
ScienceOn
|
7 |
Li, L., Fuh, J.Y.H., Zhang, Y.F., Nee, A.Y.C., 2005, "Application of Genetic Algorithm to Computer-Aided Process Planning in Distributed Manufacturing Environments," Robotics and Computer-Integrated Manufacturing, Vol. 21, No. 6, PP. 568-578.
DOI
ScienceOn
|
8 |
Ma, Y. S. and Tong, T., 2003, "Associative Feature Modeling for Concurrent Engineering Integration," Computers in industry, Vol. 51, No. 1, pp. 51-71.
DOI
ScienceOn
|
9 |
Kumar, M. and Rajotia, S., 2006, "Integration of Process Planning and Schedule in a Job Shop Environment," International Journal of Advanced Manufacturing Technology, Vol. 28, No. 1-2, 109-116.
DOI
|
10 |
Maropoulos, P. G., 1995, "Review of Research in Tooling Technology, Process Modelling and Process Planning Part I: Tooling and Process Modelling," Computer Integrated Manufacturing Systems, Vol. 8, No. 1, pp. 5-12.
DOI
ScienceOn
|
11 |
Maropoulos, P. G., 1995, "Review of Research in Tooling Technology, Process Modelling and Process Planning Part II: Process Planning," Computer Integrated Manufacturing Systems, Vol. 8, No. 1, pp. 13-20.
DOI
ScienceOn
|
12 |
Zhang, H.-C. and Alting, L., 1994, Computerized Manufacturing Process Planning Systems, Chapman&Hall, London, pp. 230-256.
|
13 |
Wang, L., Feng, H.-Y. and Cai, N., 2003, "Architecture Design of Distributed Process Planning," Journal of Manufacturing Systems, Vol. 22, No. 2, pp. 99-115.
DOI
|
14 |
Monostori, L., Kadar, B. and Hornyak, J., 1998, "Approaches to Managing Changes and Uncertainties in Manufacturing," Annals of the CIRP, Vol. 47, pp. 365-368
DOI
ScienceOn
|
15 |
Kim, J. K., Park, M. W., Chong, Y. J., 2010, "A Method for Grouping and Sequencing of Machining Processes" Proceedings of the KSPE 2010 Autumn Conference, pp. 471-472.
|
16 |
Choi, H. R., Kim, J. K., Rho, H.-M. and Lee, H. C., 2007, "Multi-Objective Genetic Algorithm for Machine Selection in Dynamic Process Planning," Journal of the Korean Society for Precision Engineering, Vol. 24, No. 4, pp. 84-92.
|