• Title/Summary/Keyword: Distance AC/A

Search Result 186, Processing Time 0.041 seconds

AC Breakdown Voltage Characteristics of $SF_6/CF_4$ and (E/P)crit in quasi-uniform Field (준평등전계에서 $SF_6/CF_4$ 혼합가스의 절연 파괴 전압 및 임계전계 특성)

  • Lee, Byung-Taek;Hwang, Cheong-Ho;An, Jung-Sik;Huh, Chang-Su
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1455_1456
    • /
    • 2009
  • $SF_6$ is the most commonly used insulating gas in electrical systems. But In these days $SF_6$ mixtures and alternative gas has been studied because of global warming. so although many studies have been carried out about binary gas mixtures with $SF_6$, few studies were presented about breakdown characteristics of $SF_6/CF_4$ mixtures. At present study the breakdown characteristics of $SF_6/CF_4$ mixtures in quasi-uniform field was performed. This experiments were carried out under AC voltages. The rod-rod electrode was used with 5 mm gap distance. The mixture of $SF_6/CF_4$ containing 20%,50%,70% of $SF_6$ were compared with pure $SF_6$ and $CF_4$ gas and gas pressure ranged from 0.1 to 0.5 MPa. The show that the breakdown voltages of gas were linearly increased according to the pressure in quasi-uniform field. For breakdown vlotage values of $(E/P)_{crit}$ are important. Because If values of (E/P) is a little more than $(E/P)_{crit}$, electrons rapidly increase and streamer discharge gernerates. Through this experiments values of $(E/P)_{crit}$ are found to vary with the ratio of $SF_6/CF_4$ mixture according to the following relationship. $V_b=(E/P)_{crit}{\cdot}p{\cdot}d$

  • PDF

Clinical outcomes of bending versus non-bending of the plate hook in acromioclavicular joint dislocation

  • Joo, Min Su;Kwon, Hoi Young;Kim, Jeong Woo
    • Clinics in Shoulder and Elbow
    • /
    • v.24 no.4
    • /
    • pp.202-208
    • /
    • 2021
  • Background: We aimed to assess the effect of plate hook bending in treatment of acromioclavicular (AC) dislocation by analyzing clinical and radiological results according to the angle of the plate hook (APH). Methods: This was a retrospective, observational, case-control study including 76 patients with acute AC joint dislocation that were divided into two groups according to treatment with bent or unbent plate hook. The visual analog scale (VAS), the American Shoulder and Elbow Surgeons (ASES) shoulder score, and range of motion (ROM) were evaluated as clinical outcomes. Comparative coracoclavicular distance (CCD) was measured to evaluate radiological outcomes. Results: While the VAS and ASES of the bending group at 4 months after surgery were significantly higher (p=0.021 and p=0.019), the VAS and ASES of the bending group at other periods and ROM of the bending group showed no significant difference. The initial CCD decreased from 183.2%±25.4% to 114.3%±18.9% at the final follow-up in the bending group and decreased from 188.2%±34.4% to 119.1%±16.7% in the non-bending group, with no statistical difference (p=0.613). The changes between the initial and post-metal removal CCD were 60.2%±11.2% and 57.3%±10.4%, respectively, with no statistical difference (p=0.241). The non-bending group showed greater subacromial osteolysis (odds ratio, 3.87). Pearson's coefficients for the correlation between APH and VAS at 4 months after surgery and for that between APH and ASES at 4 months after surgery were 0.74 and -0.63 (p=0.027 and p=0.032), respectively. Conclusions: The APH was associated with improved postoperative pain and clinical outcomes before implant removal and with reduced complications; therefore, plate hook bending is more useful clinically during plate implantation.

Technologies trend for Wireless LAN (무선 LAN 통신망의 기술 동향)

  • Gang, Yeong-Jin;Kim, Sung-Nam;Kang, Sin-Ill;Lee, Yeong-Sil;Lee, Hoon-Jae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2011.10a
    • /
    • pp.255-258
    • /
    • 2011
  • Wi-Fi is a rapidly spreading communications network with Smart phone's publication, the technology has become Ubiquitous-based core network which is connected to personal computers, laptops, and tablet PC. Wi-Fi can send currently a variety of data standard due to developed wireless LAN communications network. One of Wi-Fi standard protocols, which is IEEE 802.11n, use 2.4GHz and 5GHz band. 2.4GHz band is used for 802.11b/g protocol because wavelength is long, diffraction and receiving distance is enough to connect other device. 5GHz band has more available channels to use than 2.4GHz band, so there is no frequency interference of other wireless device such as Bluetooth, RFID. Moreover, there is low interference between channels due to small users in each bandwidth level. In the thesis, we are going to analyze 802.11a/b/g protocol which has used since the beginning of Wi-Fi protocol and 802.11n protocol which is used lately. Furthermore, we look into development and direction for standardization of the next generation wireless LANs which are 802.11ac and 802.11ad. In addition, we will consider for the security, vulnerabilities and its countermeasure in Wireless LAN.

  • PDF

A Study on the Application of Asynchronous Team Theory for QVC and Security Assessment in a Power System (전력계통의 무효전력 제어 및 안전도 평가를 위한 Asynchronous Team 이론의 적용에 관한 연구)

  • 김두현;김상철
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.3
    • /
    • pp.67-75
    • /
    • 1997
  • This paper presents a study on the application of Asynchronous Team(A-Team) theory for QVC(Reactive power control) and security assessment in a power system. Reactive power control problem is the one of optimally establishing voltage level given reactive power sources, which is very important problem to supply the demand without interruption and needs methods to alleviate a bus voltage limit violation more quickly. It can be formulated as a mixed-integer linear programming(MILP) problem without deteriorating of solution accuracy to a certain extent. The security assessment is to estimate the relative robustness of the system and deterministic approach based on AC load flow calculations is adopted to assess it, especially voltage security. A distance measure, as a measurement for voltage security, is introduced. In order to analyze the above two problem, reactive power control and static security assessment, In an integrated fashion, a new organizational structure, called an A-team, is adopted. An A-team is well-suited to the development of computer-based, multi-agent systems for operation of large-scaled power systems. In order to verify the usefulness of the suggested scheme herein, modified IEEE 30 bus system is employed as a sample system. The results of a case study are also presented.

  • PDF

Analysis of Risk Voltage for Grounding Electrode by Injection of Earth Leakage Current

  • Gil, Hyoung-Jun;Kim, Dong-Woo;Kim, Dong-Ook;Lee, Ki-Yeon;Moon, Hyun-Wook;Kim, Hyang-Kon;Kil, Gyung-Suk
    • International Journal of Safety
    • /
    • v.8 no.2
    • /
    • pp.9-14
    • /
    • 2009
  • This paper describes analysis of risk voltage for grounding electrode where earth leakage current is injected. To assess risk voltage of grounding electrode, the grounding simulator and CDEGS program were used to obtain measured data and theoretical results of this study. The grounding simulator was composed of a hemispherical water tank, AC power supply, a movable potentiometer, and test grounding electrodes. The shapes of grounding electrode model was ground rod. The potential rise was measured by grounding simulator, and the touch and step voltages were computed by CDEGS program. As a consequence, the potential rise of ground rod abruptly decreases with increasing the distance from the grounding electrode to the point to be tested. The touch voltage above the ground rod was low, but the step voltage was high. The measured results were compared with the computer calculated data and were known in good agreement.

Estimation of Sculptured Surface NC Machining Time (자유곡면 NC 절삭가공시간 예측)

  • 허은영;김보현;김동원
    • Korean Journal of Computational Design and Engineering
    • /
    • v.8 no.4
    • /
    • pp.254-261
    • /
    • 2003
  • In mold and die shops, NC machining process mainly affects the quality of the machined surface and the manufacturing time of molds and dies. The estimation of NC machining time is a prerequisite to measure the machining productivity and to generate a process schedule, which generally includes the process sequence and the completion time of each process. It is required to take into account dynamic characteristics in the estimation, such as the ac/deceleration of NC machine controllers. Intensive observations at start and end points of NC blocks show that a minimum feedrate, a key variable in a machining time model, has a close relation to a block distance, an angle between blocks, and a command feedrate. Thus, this study addresses regression models for the minimum feedrate estimation on short and long NC blocks considering these parameters. Furthermore, machining time estimation models by the four types of feedrate behaviors are suggested based on the estimated minimum feedrate. To show the validity of the proposed machining time model, the study compares the estimated with the actual machining time in the sculptured surface machining of several mold dies.

A study on efficient operation of DC track circuit (DC 궤도회로의 효율적인 운용방법에 대한 연구)

  • Jang, Dongwan;Jeon, Taehyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.2
    • /
    • pp.70-75
    • /
    • 2014
  • A track circuit is a critical piece of equipment that allows the existence of the trains on the track to be detected. Train detection is very important for the signal safety equipment. It allows for the confirmation of a train's location, the locking of switch points, the coordination of safe distance between trains, and the advance notice of a train's arrival. Track circuits can be powered by AC or DC. The DC track circuits are usually used on non-electrified tracks. On these tracks, many signal errors can be caused by lightning or problems with the power source. These problems can also cause damages to the rectifiers which must be repaired or replaced, promptly. This issue is especially problematic in the summer because of the higher frequency of thunderstorms. Issues with track circuits also cause problems for other equipment, such as railroad crossings and switch points. This further disrupts the safe operation of trains. This study aims to enhance maintenance efficiency and improve safety by utilizing parallel operation and multiplexing of a DC track circuit as well as installing an external surge protector. The experimental results on the operation of the proposed method is also presented.

A Study on Electromagnetic Retarder's Power Recovery System and Regenerating Voltage Control (전자기형 리타더의 전력회수장치 및 회생전압제어에 대한 연구)

  • Jung, Sung-Chul;Ko, Jong-Sun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.8
    • /
    • pp.1207-1214
    • /
    • 2017
  • In the case of frequent braking, when driving downhill or long distance, conventional brakes using friction are problematic in braking safety due to brake rupture and fading phenomenon. Therefore auxiliary brakes is essential for heavy vehicles. And several research has been actively conducted to improve energy efficiency by regenerating mechanical energy into electric energy when the vehicles brake. In this paper, a voltage control method is utilized to recover the electric energy generated in the electromagnetic retarder instead of the eddy current. To regenerate the braking energy into the electrical energy, a resonant L-C circuit is configured in the retarder. The retarder can be modeled as self-excited induction generator due to its operating principle. The driving conditions according to the retarder's parameters are made into 3-D maps. Also, the voltage of the resonant circuit changing depending on the driving pulse applied to the FET was analyzed. For the control of this voltage, we proposed an algorithm using the PI controller. The controlled voltage is converted by a 3-phase AC/DC converter and then charged to a battery inside the heavy vehicles through a DC/DC converter. Electromagnetic retarder and its controller are validated using Matlab Simulink. We also demonstrate the voltage controller through the actual M-G set experiment.

A Watermarking Method Based on the Informed Coding and Embedding Using Trellis Code and Entropy Masking (Trellis 부호 및 엔트로피 마스킹을 이용한 정보부호화 기반 워터마킹)

  • Lee, Jeong-Hwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.13 no.12
    • /
    • pp.2677-2684
    • /
    • 2009
  • In this paper, we study a watermarking method based on the informed coding and embedding by means of trellis code and entropy masking. An image is divided as $8{\times}8$ block with no overlapping and the discrete cosine transform(DCT) is applied to each block. Then the 16 medium-frequency AC terms of each block are extracted. Next it is compared with gaussian random vectors having zero mean and unit variance. As these processing, the embedding vectors with minimum value of linear combination between linear correlation and Watson distance can be obtained by Viterbi algorithm at each stage of trellis coding. For considering the image characteristics, we apply different weight value between the linear correlation and the Watson distance using the entropy masking. To evaluate the performance of proposed method, the average bit error rate of watermark message is calculated from different several images. By the experiments the proposed method is improved in terms of the average bit error rate.

Investigation of a Hybrid HVDC System with DC Fault Ride-Through and Commutation Failure Mitigation Capability

  • Guo, Chunyi;Zhao, Chengyong;Peng, Maolan;Liu, Wei
    • Journal of Power Electronics
    • /
    • v.15 no.5
    • /
    • pp.1367-1379
    • /
    • 2015
  • A hybrid HVDC system that is composed of line commutated converter (LCC) at the rectifier side and voltage source converter (VSC) in series with LCC at the inverter side is studied in this paper. The start-up strategy, DC fault ride-through capability, and fault recovery strategy for the hybrid HVDC system are proposed. The steady state and dynamic performances under start-up, AC fault, and DC fault scenarios are analyzed based on a bipolar hybrid HVDC system. Furthermore, the immunity of the LCC inverter in hybrid HVDC to commutation failure is investigated. The simulation results in PSCAD/EMTDC show that the hybrid HVDC system exhibits favorable steady state and dynamic performances, in particular, low susceptibility to commutation failure, excellent DC fault ride-through, and fast fault recovery capability. Results also indicate that the hybrid HVDC system can be a good alternative for large-capacity power transmission over a long distance byoverhead line.