• Title/Summary/Keyword: Design-By-Contract

Search Result 267, Processing Time 0.032 seconds

Analysis of the Current Status of NFT Art and Methodology on Utilizing Domestic Artworks (NFT예술 현황 분석과 국내 미술작품 활용방안 연구)

  • Lee, Ahn
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.6
    • /
    • pp.215-222
    • /
    • 2022
  • This study summarizes the basic concepts of NFT art and analyzes trends in the domestic and international NFT market to provide a better understanding of the art form to suggest various ways to utilize the art in near future when social interests in technologies such as metaverse, block chain, and NFTs are continuously increasing. In addition, by examining the rapid development and process of blockchain technology in overseas markets, and confirming cases of information transfer to various metaverses such as cryptocurrency and NFT technology, the aim is to present a foothold for the future direction of national arts in general. To this end, in order to analyze consumers' perceptions and preferences, and to draw conclusions about current NFT arts at home and abroad, a survey was conducted on NFT awareness among participants of an art fair in Gwangjin-gu, Seoul. It is hoped that this study will become a cornerstone of research on NFT works and NFT art industry, which is becoming a global issue.

Improvements for Ordering and Bidding of VE in Convergence Era (융복합시대 설계의 경제성 등 검토(VE) 발주 및 입찰시 문제점과 개선방안에 관한 연구)

  • Park, Myeong-Su;Yang, Hae-Sool
    • Journal of Digital Convergence
    • /
    • v.14 no.3
    • /
    • pp.25-33
    • /
    • 2016
  • The author of this study conducted a survey with the expert groups who are currently handling hands-on works in convergence cities, ordering organizations, construction management companies, contractors, schools and research institutes, etc. The results of empirical analysis can be summarized as follows: First, there is no difference in distribution among the problems with position and the bidding system of private contracts. Second, there is relevance between position and the adequacy of current design VE ordering system, indicating different recognition. Third, there is no difference in distribution between organizations and the adequacy of current design VE ordering system. Fourth, there is difference in distribution between organizations and service price adequacy and there is difference in recognition by organization when organizations mutually recognize the service price adequacy. Fifth, there is difference in distribution between career and the necessity of the participating companies' qualification. Sixth, there is difference in distribution for the adequacy of career and the adequacy of participating companies' requirements. No problems have been found with the adequate service period according to private contract bidding system, but the necessity of participating companies' qualification and participating companies' requirements.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

Case study of design and construction for cutter change in EPB TBM tunneling (EPB 쉴드 TBM 커터 교체 설계 및 시공 사례 분석)

  • Lee, Jae-won;Kang, Sung-wook;Jung, Jae-hoon;Kang, Han-byul;Shin, Young Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.553-581
    • /
    • 2022
  • Shortly after tunnel boring machine (TBM) was introduced in the tunneling industry, the use of TBM has surprisingly increased worldwide due to its performance together with the benefit of being safely and environmentally friendly. One of the main cost items in the TBM tunneling in rock and soil is changing damaged or worn cutters. It is because that the cutter change is a time-consuming and costly activity that can significantly reduce the TBM utilization and advance rate and has a major effect on the total time and cost of TBM tunneling projects. Therefore, the importance of accurately evaluating the cutter life can never be overemphasized. However, the prediction of cutter wear in soil, rock including mixed face is very complex and not yet fully clarified, subsequently keeping engineers busy around the world. Various prediction models for cutter wear have been developed and introduced, but these models almost usually produce highly variable results due to inherent uncertainties in the models. In this study, a case study of design and construction of disc cutter change is introduced and analyzed, rather than proposing a prediction model of cutter wear. As the disc cutter is strongly affected by the geological condition, TBM machine characteristic and operation, authors believe it is very hard to suggest a generalized prediction model given the uncertainties and limitations therefore it would be more practical to analyze a real case and provide a detailed discussion of the difference between prediction and result for the cutter change. By doing so, up-to-date idea about planning and execution of cutter change in practice can be promoted.

Design and Implementation of Call Object Management mechanism for Customer Channel integration of Customer Relationship Management Environment (CRM 환경의 고객 채널 통합을 위한 콜 객체 관리 메저니즘 설계 및 구현)

  • Han, Yun-Ki;Koo, Yong-Wan
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.13 no.7
    • /
    • pp.520-533
    • /
    • 2007
  • The CRM(Customer Relationship Management) is the business strategy model for higher profits and competitive power of the enterprise in a new business environment. The large-scale customer response service technique uses internet, e-mail, SMS (Short Message Service), Telephony service, DM(Direct Mail) by customer channel point. Recently, business model diversify for new contract and retaining existing customer to the effort for a profitable model of business. This paper is based on Avaya PDS(Predictive Dialing System) model for CRM bond center. If the number of "available" agents are less than the number of inbound channels, then there may be real-time response problems in PDS system implemented. The Organization cannot afford to have many agents in available mode because of the high cost of manpower. This paper provides two contributions to the study. First, we present Call Object Management Mechanism of Customer Channel integration for reduce outbound consulting and reduce CallBack data in the PDS. Second, we design and implement the proposed system. Our simulation results show analysis of old model and proposed model. The proposed model can be efficiently used in Large-scale CRM.

Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

Impacts of Economic Satisfaction and Social Satisfaction of Franchisee on Commitment and Loyalty to Franchisor (가맹점의 경제적 만족과 사회적 만족이 몰입과 충성도에 미치는 영향)

  • Kim, Ho-Seok
    • The Korean Journal of Franchise Management
    • /
    • v.9 no.4
    • /
    • pp.21-31
    • /
    • 2018
  • Purpose - Recently, the franchise business has made remarkable progress, but many conflicts have occurred. From this perspective, this paper explains how to improve the long - term relationship between franchisor and franchisee by integrating the relationship between franchisor of franchise business and franchisee. This study aims to identify the franchisee's economic and social satisfaction and to examine their influences on calculative and affective commitment, and loyalty. At the end of this paper, theoretical and managerial implication were suggested. Research design, data, and methodology - The data were collected from owners and store managers in franchisees located in Seoul, Korea. The trained researchers contacted owners and managers of the franchise stores. The questionaires were distributed to owners and managers consented to respond. The collected questionnaires were used for the final analysis of 324 copies(243 store owners and 81 store managers), except for 26 copies of the untrustworthy response out of 350 copies. The data were analyzed with SPSS, 21.0 and SmartPls 3.0 Result - The results of the study are as follows. First, economic satisfaction effects both calculative and affective commitment, but social satisfaction does not. Second, both calculative and affective commitment have positive effects on loyalty. Third, economic satisfaction has a positive impact on loyalty, but social satisfaction does not. Conclusions - The implications of this study are following as: From the theoretical perspective, this study analyze the satisfaction and commitment of the franchisee from the multidimensional perspective by analyzing the effects of the franchisee on two dimensions of economic and social satisfaction and on calculative and affective commitment. That is, this study explains the trade-off between economica and social satisfaction, and between calculative and affective commitment. From the managerial perspective, the results of this study suggest that the economic satisfaction of the franchise headquarters felt by franchisees should be prioritized over social satisfaction. Especially at the early stage of the contract, economic satisfaction should be given priority over social satisfaction. However, since affective and calculative commitment have a significant effect on loyalty, social satisfaction factors should not be excluded by focusing on only economic ones. In other words, the franchisors should not only think of franchisees as a source of sales and profits, but should respect franchisees and maintain loyal relationships with friends.

A Study on the Method for the Estimate of Construction Management in the Program Management (종합건설사업관리 사업관리비용산정을 위한 방법연구 - 기획단계에서 실시설계 입찰까지 -)

  • Baek, Myeongchang;Park, Junmo;Park, Gilbeom;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.3-12
    • /
    • 2014
  • With the scale of program management getting larger and complexity, More accurate and precise method for management cost estimate is demanded. However, most of project management cost estimates are based on similar cases and hence can not reflect distinct features of each project. Cost estimate precision is also not up to the standards, and also troublesome to policy-making and budget allocation. Therefore, project typical model for cost estimate of Comprehensive Project Management is developed, and makes it easier to manage level of effort and allocate cost by applying characteristic factor of each project. This study categorized the project package by phase; planning, detailed design, and bid procurement, to develop typical model. And by designating specific level of effort required for each field and rank, the study aims to improve the method for calculating the detailed and objective program cost. Outcome of this study will prevent conflicts between client and contractor, accurately calculate program management contract cost for the client, and become a reference for the contractor to receive rational and practical payments for their work.

The analysis of the foreign laws related to landscape architecture and a study on the reasonable application to the expected organic law for landscape architecture in Korea (외국의 조경관련 법제도의 비교분석과 한국에서의 조경기본법 제정을 위한 합리적 적용에 관한 연구)

  • 신익순
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.3
    • /
    • pp.66-88
    • /
    • 1997
  • There is no special law of Landscape architecture in Korea. So, examining the concept from the legal basis of LA with the viewpoint of a natural scientist not a jurist, this study was conducted to grasp the present condition of the name and the related text of the foreign laws in force which were connected with LA.. And those foreign laws were arranged in the name and the text and classified by nations of regional groups and it was considered to the mutual relation with lots of laws which are scattered with the various laws. Current domestic regulations to the various fields of LA are assembled with the many related rules. The governmental organization conducting those business is nonexistent up to now and it is generally known to except the dept. of LA from the office organization in Korea. Being at a disadvantage as mentioned above, this study was progressed under the necessity of the scientific basis for the expected organic law of LA proposed to establish it by every field of LA. Though feels inconvenience if the study for the items itself of LA had been proceeded prior to the study of laws relating to LA throughout the study, such a extensive study will be a subject to be attempted constantly hereafter by all part of landscape architects. The contents of the study are as follows ; 1. The present condition of the foreign laws connected with LA 1. The proposal & analysis of the problems and the solutions to the domestic laws connected with LA 3. The proposal of the reasonable application pklan in order to establish the organic law for LA. Among the items relating to LA such as engineer, contract, planning, design and supervision, construction, maintenance, plant and planting, open space, facilities, aesthetics and sight, park, land use and development planning, urban and regional planning, leisure space planning, environmental conservation and ecology, structural engineering of construction, administration, right and penal regulations, the laws dealing with the matter relating to LA directly or indirectly are prescribed dispersedly in the many other related laws and it is concluded to be impossible for the independent law of LA is likely to be establish with not only selecting and arranging the matter having closed connections to LA directly but also being recognized as the systematic equipment of the LA business. It was to be analyzed the present condition of the collected foreign laws relating to LA. After pointing out the problems to the domestic related laws being at issue, the remedies for it were presented through the questionnaire of the landscape specialist in which the supporting opinions to the recognition to the problems and the solutions were come to a major portion. Three types of application such as applicable, non-applicable, applicable after examination were presented to decide whether or not the foreign related laws were applied to the domestic one. The result of analysis shows that 42 statutes and 9 ordinances are applicable, 4 statutes and 7 ordinances are non-applicable, 1 constitution, 81 statutes and 48 ordinances are applicable after examination.

  • PDF