• Title/Summary/Keyword: Design-Build Project

Search Result 222, Processing Time 0.031 seconds

ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF

Application of Partnering to Design VE to Public Design-Build Projects (공공부문 일괄입찰사업의 설계VE 파트너링 활용방안)

  • Kim, Hae-Gon;Um, Ik-Jun;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.110-118
    • /
    • 2006
  • Current design-build contract is the type of joint venture, but performs by separate party which causes change orders due to the lack of communication between design and construction, so it cannot lead the main object which is the integration of design and construction. Furthermore, the current design-build contract is impossible to reduce the project costs by VE at the design development phase because the design proceeds with the fixed price through bidding. Like these limitless, the analysis results of the case of VE in the design-build projects, several problems that are prevented from active design VE are elicited by the project participants. Meanwhile, Ministry of Construction & Transportation decided to enlarge the VE review system lately. Therefore, in this study, it presented model of design VE partnering of design-build and partnering agreements form to apply design VE and to try to be able to lead the design VE to be more successful in public design-build projects.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

A Study on the Success Model for Design-Build Delivery Method Process (설계시공일괄방식 프로세스 성공모델에 관한 연구)

  • Kim Jeong-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.119-127
    • /
    • 2003
  • Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

An Application of Value Engineering to Design-Build Projects at Design Development Phase (설계${\cdot}$시공일괄 사업의 실시설계단계 VE적용 방안에 관한 연구)

  • Jung Jae-Jin;Kim Jae-Hyun;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.294-298
    • /
    • 2003
  • Recently, Design-build project as delivery system public construction sector tends to be increased according to the Masterplan for promotion of construction technologies, and construction projects are increasing their complexity, variety and scale. And owner's requirements become various. Preliminary design for design eligibility judging of design-build has been designed excessively to get a good point and this tendency includes the elements which is capable of wasting the budget. Because of excessive design, owners require to apply VE study into the design development phase but in the Design-build system, VE application has not been of no effect that owners expect, owing to the characters of lum-sum contracts. The purpose of this study is to propose the plan for effective application of VE in the design development phase in order to solve the problems such as excessive design of preliminary design in the design-build project. This study established plans for VE application through investigating and analyzing VE application case and then proposed the applications in the aspect of regulations and contracts, parties participated in project, VE operation through research for verification of usefulness.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.