• Title/Summary/Keyword: Design-Build계약

Search Result 32, Processing Time 0.032 seconds

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

A study on the Ethics Characteristics according to Service and Practice of Construction Manager (건설사업관리자의 업무수행에 따른 윤리 특성 고찰)

  • Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.97-106
    • /
    • 2011
  • Construction Management is the overall management of the project as construction manager and the owner are united together. Construction manager's role is to conduct the overall or partial construction administration in the 'design, bid, build' process, in the owner's interests with maintaining technical neutrality. Construction manager is becoming one of new professionals in the building process and the contract defines their roles and the range of services, so high level of ethnics are required. This study suggests the legal status of the construction manager and the ethnic standards and the ethnic's characteristics. In conclusion, firstly, the legal characteristics of the administration of construction management are the delegations contract, the responsibility of negligence and the duty of due diligence, abided by the contract that ties between the owner and the construction manger. Secondly, the administerial characteristics of the construction management are the role of mediator, the service of professional technology, accountability to the owner and publicness. Thirdly, due to these characteristics, as a professional, the standard of ethnic assessment for the construction project manager are intention, act and result, so with the relation to that, morality, deontology and consequentialism have been suggested in this study.

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts (턴키.대안입찰 설계심의 및 평가제도의 개선방안)

  • Park, Hong-Tae;Lee, Yang-Kyoo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.31-38
    • /
    • 2011
  • Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Product Liability in the Shipbuilding in the "MSC Carla" case (MSC Carla 사례상 선박의 제조물책임)

  • Seo, Jeong Woo;Jo, Jong Joo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.64
    • /
    • pp.155-185
    • /
    • 2014
  • Liability for the manufacture or supply of defective products can arise in two principle ways, in tort and in contract. English law has long regarded shipbuilding contract as agreement for the sale and purchase of goods. The consequence of which is that unless the Buyer and Builder agree otherwise, terms will automatically be implied into the contract between them as to the quality and performance of the completed vessel. The same principle applies to sub-contracts allied to the shipbuilding contract. On the other hand, one case decisions established that ".... a contract to build a ship, though a contract of sale of goods, has also some characteristics of a building contract", Recently the liability of a manufacturer in tort for physical damage i.e. personal injury and damage to property other than alleged to be defective is now well settled in most countries. Accordingly the Builder may face third party claims in tort more regularly than they have in the past, if the statutory implied terms have not been expressly excluded in contract. In such circumstances, it is necessary for the Builder to be prepared with counter measures to secure the stability of the vessel from its design development, building process, delivery and operation etc. The purpose of this paper is, from the case of "MSC Carla", to review product liability, jurisdiction and the initial date of extinctive prescription, then to suggest counter measures to the Builder.

  • PDF

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

An Analysis on Expanding Construction Insurance and Estimating Necessary Budget (건설공사보험 확대 당위성 및 예산소요 분석 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.94-102
    • /
    • 2014
  • This study analyzes necessity of expanding construction insurance and estimates required budget. Construction insurance is obliged by National Contract Law and Local Contract Law to protect projet owners and contractors from any unexpected construction risk such as financial losses in construction process. Currently the contracts of design-build and alternate-bid projects as well as PQ project, which are greater than 20 billion won, require the contractors to provide construction insurances in Korea. Insurance premiums are borne by the public project owner. Those contractors whose contract volume is less than 20 billion won burden all risks of projects at their cost. This causes equity problem. Because small-and-medium contractors are discriminated against large contractors since insurance-obliged projects are performed by large contractors and insurance premiums are borne by the public project owner. On the other hands, in all engineering projects, regardless of volume, insurance premiums are borne by the project owner. Therefore current regulation has to be improved, by expanding to all public projects. The average ratio of unobliged projects is 46%, in recent 3 years, prime cost of insurance companies is estimated 0.2%. Moreover considering risks of each construction type, prime cost of unobliged works is estimated as 0.13%. Hence additional necessary budget is estimated to be 2.09 billion won if total volume of public work is 3.5 trillion won. And 2.39 billion won is derived if total volume of public projects is 4 trillion won.