Effect of Multyparty Contract in IPD Project Case study of USA and Korean Projects (IPD 계약은 IPD 프로젝트의 필수조건인가 - 국내외 사례조사를 통하여 -)

  • Yoo, Seungeun;Kim, Taewan;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.3-16
    • /
    • 2017
  • Integrated project delivery (IPD) is suggested as an alternative to traditional delivery methods such as design-build (DB), design-bid-build (DBB), and construction management at risk (CMR). Many foreign research studies have approached IPD not only in the contractual aspect but also the work implementation method aspect. However, most research projects in Korea have focused on the contractual aspect of IPD for asserting that the characteristics are the critical matter. The Korean institutional and legal system does not permit the multi-party agreement; therefore, it is difficult to adopt IPD in Korea's construction industry. The researchers do not wait the system to be changed, but we do identify the possibility of adopting IPD in Korea in the perspective of work implementation method, except the contractual characteristics. Thus, the goal of this research is to identify one project that does not include IPD agreement but utilizes other IPD characteristics whose contractual results have similar performance to those that utilize all characteristics of IPD including agreement. This research is expected to enhance performance of the construction project in a Korean construction environment by embracing IPD characteristics as overcoming limits and bounds of the traditional delivery method.

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea (도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석)

  • Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.216-221
    • /
    • 2008
  • This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.

  • PDF

A Coordinative Committee Model between Architects and Contractors in Design-Build Projects (설계시공일괄공사에서 설계자와 시공자 간의 단계별 중간협의체 운영모델)

  • Kong Seung-Hwan;Kong Seung-Hwan;Eom Ik-Joon;Koo Kyo-jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.323-328
    • /
    • 2004
  • Domestic Design-Build, which has applied for client's convenience, has many problems Because It is being applied in the building law, which devides between architects and contractors. Among problem the relation between architects and contractors is a typical problem. It makes a quality decline and a design skill decline. In result, it causes insufficience of competitive power in overseas projects from now on. So we present the plans to improve mutual relations between architects and contractors. And we induce development of design skill and good quality of building by presenting a coordinative committee model between them in Design-Build projects.

  • PDF

A Study on the FIDIC Conditions of Contract for Design, Build and Operate Projects (FIDIC의 DBO 프로젝트용 표준계약조건에 관한 연구)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.46
    • /
    • pp.29-60
    • /
    • 2010
  • The incentive and reasons to publish FIDIC Conditions of Contract for Design, Build and Operate Projects(DBO Form) are manifold. It is partly a response to the increasing need for sophisticated project delivery methods in both the public and private sectors and the already widespread use of the FIDIC Yellow Book with operation and maintenance obligations and partly a response to the challenge to decrease maintenance cost to a minimum by means of a new procurement route. As a result, FIDIC has developed a new model form to meet this market place requirement. On the other hand, FIDIC did not simply adapt the Yellow Book but has developed a new form from it, whilst preserving the style of the already known FIDIC Forms and maintaining the wording where it was not necessary to change it for the purposes of a DBO Form. Moreover DBO Form fills up supposed gaps in other FIDIC Forms and ameliorates the claim management and dispute management framework. FIDIC DBO approach may be shortly summarized as follows. First, DBO Form provides for single project responsibility. Second, DBO Form has the clear objective of ensuring the use of a most reliable and efficient technology at the lowest life-cycle cost. Third, DBO Form is intended to operate as an effective quality increase in the design and construction of projects. Fourth, DBO Form is intended to provide significant benefits with regard to system integration and reduction of risks. Fifth, DBO Form accelerates and enhances completion schedule compliance. Sixth, DBO takes care of all three supporting pillars of sustainability(including economical, environmental and social elements). DBO Form is obviously a good starting point for negotiations and the preparation of calls for tenders, thus saving the parties time and money. However, existing cultural and legal differences, particular local conditions and the particular needs of some branches of the industry may require the form to be adapted according to the particular needs of a project. And Civil law practitioners are strongly recommended to verify carefully the underlying legal concepts and background of each clause of the General Conditions in order to avoid unnecessary and sometimes unnatural changes and amendments being made. Note that when preparing the Particular Conditions ensure that terminology is consistent and that existing inherent concepts should not be ignored.

  • PDF

The Design of Optimal Recall Insurance Product (최적 리콜보험상품 설계에 관한 연구)

  • 김두철
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.3 no.4
    • /
    • pp.325-332
    • /
    • 2002
  • In the process of designing pareto optimal insurance contract, it is necessary to assume that insurance contract conditions are endogenous to build a model. The expected utility, the non-expected utility and the state-dependent utility function can be applied as a insurance decision making principle. The insurance costs may have the linear, convex, and concave ralationship with the indemnity schedule. However, the sunk cost and fixed cost must be recognized. The deductible which decides whether an insurance contract to be a full or partial insurance contract can exist in the forms of straight deductible or diminishing deductible. Indeciding the level of deductible, the types of the insurance and the risks to be insured should be the deciding factors. Especially for recall insurance, there is relatively high chance that the recalling company being bankrupt. Therefore, the possibility of bankrupcy should be the considering factor in deciding the policy limit. The existence of the incomplete market and uninsurable background risk should be understood as restricting conditions of the pareto-optimal insurance contract.

  • PDF

A Study on the Prevention for Differing Site Conditions Claims - Focused on Design-Build Project in Public Sector - (현장여건상이로 인한 클레임의 예방에 관한 연구 -공공부문의 설계$\cdot$시공일괄공사를 중심으로-)

  • Chung Myung-Woo;Lee Hwa-Young;Seo Yong-Chil;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.46-53
    • /
    • 2001
  • Differing Site Conditions('DSC') Claims among construction claims are on the increase as a direct result of the steady construction of Social Overhead Capital Facilities initiated by Government. As DSC claims generally became apparent during the intial stage of the construction project, it is necessary to timely review and study the proposal on the prevention of DSC claims because delayed settlement will incur more substantial damages to all parties concerned. This research is focused on the identification and analysis of the causes for DSC claims as applicable to design-build project in public sector and it presents the possible short term, medium and long term proposals on the improvement of causes related with DSC claims. The major results of this research are summarized as follows: 1. Improvement of contractor's tender practice 2. Contractor's division of responsibility on the site survey 3. Improvement of owner's exculpatory clause 4. Flexibility on the adjustment of contract amount The proposals stated above could be useful in resolving the DSC claims between owner and contractors.

  • PDF

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

Working Design Management of the Design Build Projects Using CBR (CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안)

  • Park Se-Kun;Kim Young-Jae;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.432-437
    • /
    • 2002
  • As the working design process of Turn-Key projects is a basic process for the final contract, this process has lots of business decision to be made. Because such results of business decision can be the basis on contract documents, it is the step which needs a through management for Turn-key project. But in case of domestic construction companies, because those are not organized process of working design process, project manager has had lots of trouble at each process to make the business decision. As a means of settling the problems, this research is initiated. First, working decision management process is identified and generalized by interviews with project managers. Second, cases that actually happened in the project are investigated and categorized. Third, response plan to solve the problems and check lists to prevent the problems are suggested. Finally, the process, cases, response plan, and check list are integrated using CBR for future reuse.

  • PDF

Analysis of the Influence of Design Score and Price Score for Design Build Bidding (설계시공일괄입찰에서 설계점수와 가격점수의 영향력 분석)

  • Lee, Jinhak;Woo, Sungkwon;Lee, Siwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.44-51
    • /
    • 2023
  • Selecting appropriate bidding system in construction projects considering the characteristic of project can be a make-or-break element, so the understanding for bidding system of public construction projects is ever more important from the perspective of both the owner and the contractor. The design-build bidding is commonly referred to as turnkey in Korea, and is a bidding method that is often applied to large public construction projects because it allows new technologies to be applied to the design and facilitates risk management for the owner. In this bidding method, there are only two factors (design score and price score) that affect the selection of the winning bidder, so it is important to understand the influence of each factor, but there is little research on the subject. This study aims to provide a basis for establishing bidding strategies for understanding the influence between design score and price score by analyzing various design-build bidding data of public construction projects. The results of the study show that design score is the factor that has more influence on the ranking of bidders in all three weighted evaluation methods: design-emphasized, price-emphasized, and equalized evaluation. In addition, we found that the correlation between design and price scores was not significant due to the unique bid evaluation structure in Korea.