• 제목/요약/키워드: Design stage

검색결과 6,721건 처리시간 0.042초

Series Design of Compressors for Two-Stage Centrifugal Chiller

  • Jinhee Jeong;Lee, Hyeongkoo
    • Journal of Mechanical Science and Technology
    • /
    • 제17권2호
    • /
    • pp.288-295
    • /
    • 2003
  • A preliminary series design of compressors for a two-stage centrifugal chiller is suggested. Six groups of hydrodynamically similar compressors, ranging from 233RT to 1,200RT, are introduced. Flow rates, impeller diameters, and wheel speeds for each group are determined from hydrodynamic similarity to share impellers of adjacent groups. It is expected that these compressors can have the same performance and efficiency from the smallest model to the largest one.

건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로- (A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing-)

  • 전영진;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

Controller Design and By-Pass Structure for the Two-Stage Grid-Connected Photovoltaic Power Conditioning System

  • 이성준;배현수;조보형
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2009년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.206-208
    • /
    • 2009
  • In this paper, a systematical controller design method for a twostage grid-connected photovoltaic power conditioning system is proposed. For a pre-stage boost converter to achieve the stable operation in the entire region of solar array, the digital resistive current mode controller is used. This algorithm is very simple to implement with a digital controller and there is no power stage parameter dependency in the controller design. For a post-stage single-phase full-bridge inverter, a PI controller with a feedforward compensation for the inner current control is employed. Furthermore, in case that the operating point of the solar array under varying environmental conditions is higher than the required voltage for the inverter current control, the bypass mode for the boost converter is possible for the more efficient operation. The proposed control scheme is validated through the experiment of the prototype two-stage power conditioning system hardware with a 200W solar array.

  • PDF

A Study on the Stage Costume Design of the Opera

  • Lyu, Chun-Wha;Cho, Kyu-Hwa
    • 패션비즈니스
    • /
    • 제6권6호
    • /
    • pp.68-77
    • /
    • 2002
  • In this study, based on Choi, Jong Rim's script (2000), the main characters' stage costume designs were presented with 15 illustrated pieces in terms of compounding the images of Korea and West. I considerered the main characters' social status and personality by each act and scene, as well as the correlation of the stage costume's minor theme, color and material. In expressing the stage costume, this study has chosen the formational method of the comparative design dimensions between costumes in 1650s Joseon and baroque period and used the joinder of flat pattern and draping in various parts of the costumes.

마이크로 스테이지의 유한요소해석 (A Study on the Optimal Structural Design using FEM for Micro Stage)

  • 김재열;곽이구;한재호;김항우;하하변명
    • 한국정밀공학회지
    • /
    • 제19권10호
    • /
    • pp.60-65
    • /
    • 2002
  • For optimal design of micro stage, we measured the displacement of piezoelectric transducer that was based on voltage value. And the micro stage was analyzed using FEM with displacement data including voltage value of piezoelectric transducer. For verification of analysis results, the displacements were measured by using Laser-interferometer. And researchers confirmed to propriety on design of micro stage with FEM, we obtained 3.5% error rate between measurement results and analyzing results.

Parallelogram형 Flexure Hinge 에 의한 Motion Stage 의 최적 설계 (Optimal Design for Parallelogram Type Flexure Hinge)

  • 최주용;엄상인;김정현
    • 한국정밀공학회지
    • /
    • 제32권1호
    • /
    • pp.107-111
    • /
    • 2015
  • This paper proposes an optimal design for a precision motion stage employing a parallelogram flexure hinge. The voltage applied to the piezo element produces motion that is amplified through a 3-stage amplification structure. Especially, instead of the generally used conic section flexure hinge a parallelogram shaped flexure hinge is used that improves the flexibility of the lever. An Finite Element Analysis is performed on each motion stage lever where optimal design was achieved using Response Surface Methodology(RSM).

Effective Estimation Method of Routing Congestion at Floorplan Stage for 3D ICs

  • Ahn, Byung-Gyu;Kim, Jae-Hwan;Li, Wenrui;Chong, Jong-Wha
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제11권4호
    • /
    • pp.344-350
    • /
    • 2011
  • Higher integrated density in 3D ICs also brings the difficulties of routing, which can cause the routing failure or re-design from beginning. Hence, precise congestion estimation at the early physical design stage such as floorplan is beneficial to reduce the total design time cost. In this paper, an effective estimation method of routing congestion is proposed for 3D ICs at floorplan stage. This method uses synthesized virtual signal nets, power/ground network and clock network to achieve the estimation. During the synthesis, the TSV location is also under consideration. The experiments indicate that our proposed method had small difference with the estimation result got at the post-placement stage. Furthermore, the comparison of congestion maps obtained with our method and global router demonstrates that our estimation method is able to predict the congestion hot spots accurately.

정밀 위치 결정 및 고하중 부담 능력을 지닌 6-자유도 스테이지의 설계 (Design of a 6-DOF Stage for Precision Positioning and Large Force Generation)

  • 신현표
    • 한국정밀공학회지
    • /
    • 제30권1호
    • /
    • pp.105-112
    • /
    • 2013
  • This paper presents the structural design and finite element analysis of precision stage based on a double triangular parallel mechanism for precision positioning and large force generation. Recently, with the acceleration of miniaturization in mobile appliances, the demand for precision aligning and bonding has been increasing. Such processes require both high precision and large force generation, which are difficult to obtain simultaneously. This study aimed at constructing a precision stage that has high precision, long stroke, and large force generation. Actuators were tactically placed and flexure hinges were carefully designed by optimization process to constitute a parallel mechanism with a double triangular configuration. The three actuators in the inner triangle function as an in-plane positioner, whereas the three actuators in the outer triangle as an out-of-plane positioner. Finite element analysis is performed to validate load carrying performances of the developed precision stage.

AVEVA Marine 강재마진의 선모델링 자동반영을 위한 인공지능 모델링 시스템 개발 (Development of Artificial Intelligence Modeling System for Automated Application of Steel Margin in Early Modeling Process using AVEVA Marine)

  • 김남훈;박용석;김정호;김연용;천종진;최형순
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2013년도 특별논문집
    • /
    • pp.35-41
    • /
    • 2013
  • Nowadays, automated modeling system for steel margin based on interactive user interface has been developed and applied to the production design stage. The system could increase design efficiency and minimize human error owing to recent CAD technique. However, there has been no approach to the pre-nesting design stage at all in early modeling process especially where ship model should be handled at more than two design stages using AVEVA Marine. A designer of the design stage needs artificial intelligence system beyond modeling automation when 3D model must be prepared in early modeling process using AVEVA Marine because they have focused on 2D nesting traditionally. In addition, they have a hard time figuring out the model prepared in previous design stage and modifying the model for steel purchase size in early modeling process. In this paper, artificial intelligence modeling system for automated application of steel margin in early modeling process using AVEVA Marine is developed in order to apply to the pre-nesting design stage that can detect effective segments before a calculation to find if a segment locates near block butt boundaries by filtering noise segments among lines, curves and surface intersections based on IT big data analysis.

  • PDF

디지털 트윈 개념을 적용한 프로토타이핑 기반 디자인 프로세스: 기초연구 (Prototyping-based Design Process Integrated with Digital-Twin: A Fundamental Study)

  • 김진웅;김성아
    • 한국BIM학회 논문집
    • /
    • 제9권4호
    • /
    • pp.51-61
    • /
    • 2019
  • In the general manufacturing sector, prototyping used to reduce the risks that can arise with new conceptual products. However, in AEC area, it does not mass-produce a building, so the prototype itself becomes a building. Therefore, it is challenging to have prototyping of the same scale as the real thing, and the prototyping process in architecture is very inefficient. The prototyping process in the design stage typically assumes making a scaled model, partial model, or digital model. However, it is difficult for these models to correspond to the actual building and the environment of time and space such as scale, material, environment, load, physical properties and deformation, corrosion, etc., unlike the actual building. When using the digital twin concept in the prototyping process, it is possible to measure performance from the design stage to the operation stage. The digital twin was found by a method for monitoring based on physical twins and real-time linkage in the operation stage. Therefore, if the digital twin concept is applied at the design stage, it is possible to predict performance using not only current performance but also history information using real-time information. In order to apply the digital twin concept to the prototyping design process, we analyze the theoretical considerations and the prototyping design process of the digital twin, analyze the cases and research results where the prototyping design was applied, Provide an applied prototyping design process. The proposed process is tested through a pilot project and analyzed for potential use.