• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.029 seconds

A WEB-BASED PROJECT MANAGEMENT SYSTEM FOR GOVERNMENT R&D PROGRAMS (국가 연구개발을 위한 웹기반의 과제관리 시스템)

  • 손권중
    • Proceedings of the Technology Innovation Conference
    • /
    • 2003.06a
    • /
    • pp.108-115
    • /
    • 2003
  • Government R&D Project Management in Korea has had considerable difficulties because of the lack of project monitoring systems and insufficient communication. The National Program for Tera-level Nanodevices (TND Program) is a ten-year R&D program for commercialization in the area of nano technology. Collaboration and communication among the various participants such as business companies, universities, and government R&D institutes are key success factors in this R&D program. TND Program office has developed a Web-based project management system. This system consists of mostly four sub-management functions: (1) Milestones management of all R&D projects; (2) DR (Design Review) management as the mechanism for checking the performance against milestones; (3) Project activity management using the WBS (Work Breakdown Structure); (4) Budget management. Additionally, it also has many R&D supporting functions such as technology information bulletin board, community management, and visual summary of project progress and performance. This system is effective for monitoring research project as well as measuring project performance of the overall research program. This Web-based system has become the useful tool of R&D moving target mechanism and effective communication and collaboration tool. System features and adoption process of the system are also suggested.

  • PDF

A Case Study on Villagers' Participation and Project Achievement in Rural Development - Focusing on Saemaul Undong Project in Myanmar - (농촌지역개발의 주민참여와 사업성과에 관한 사례 연구 - 미얀마 농촌공동체 개발사업을 중심으로 -)

  • Lee, Seung-won;Shim, Sung-hee
    • Journal of Korean Society of Rural Planning
    • /
    • v.26 no.3
    • /
    • pp.79-89
    • /
    • 2020
  • Since the Republic of Korea had been registered as the 24th member of OECD DAC in 2009, recent trend of Korea's ODA has showed drastic increase including agriculture and rural development sector. Particularly, various rural development projects have been implemented adopting development experience and methodology of Saemaul Undong (SMU, New Village Movement). This study implemented statistical analysis between villagers' participation and achievement of rural community development project, based on practical data out of 'Saemaul Undong Project in Myanmar', to suggest meaningful implication in terms of participatory rural development. It emphasized the importance and necessity of villagers' participation in rural development through regression analysis that proved positive correlation between villagers' participation and rural development project. It proves that income-generation part has significantly greater influence than capacity-building and living environment part in terms of rural community development project: Based on the analysis, comparing impact of each independent variable, income generation has 1.88 and 1.68 times greater impact than capacity-building and living environment respectively. The result, on the other side, rather raise the importance of careful consideration for project design and implementation to harmonize those three parts altogether especially rural development for developing countries: capacity-building and living environment parts suggests essential foundation to make income generation successful that enables to secure project achievement and sustainability.

Design Satisfaction of Private Signboards on the Sign Management Guideline (사설안내표지판 관리지침의 디자인 만족도에 관한 연구 -대전시 사설안내표지판 디자인 관리지침을 중심으로-)

  • Kim, Young-Kook;Joo, Yeon-Jung
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.5
    • /
    • pp.159-169
    • /
    • 2013
  • As a part of public design, private signboard should be designed to help convenience of people with the consideration of urban landscape simultaneously; however, the lack of legislated design regulations and ignorance of managing entities have resulted in uncontrolled installation of private signboards, ruining city view and causing confusion in delivering information. To appease this problem, each provincial city including Seoul is carrying out an improvement project based on its own sign management guideline. Therefore, it is timely needed to study the design satisfaction on the changed (or changing) private boards from the viewpoints of information delivery and visual environment. In this study, we investigated the design satisfaction of private signboards in Daejeon city (where very recently the improvement project has been undergoing based on its design guideline) in terms of visual factors, information delivery, and city landscape. We note that our study has its own significance to provide an empirical research on the design satisfaction of private signboards, which shows that people are mostly satisfied with the new design from aspects of visual factors, information delivery, and city landscape.

UNDP's Adaptation Policy Framework for Climate Change (국제연합개발계획의 기후변화 적응 정책 체계 소개)

  • Shm, Im-Chul;Lee, Eun-Jeong;Kwon, Won-Tae;Lim, Jaekyu
    • Atmosphere
    • /
    • v.15 no.1
    • /
    • pp.59-68
    • /
    • 2005
  • United Nations Development Programme (UNDP) introduced the Adaptation Policy Framework (APF) to support the developing countries in order to help to make adaptation policy and strategy to climate change. This study provides the summary of the APF and will help for preparing policy regarding the impact of climate change and its adaptation. APF consists of five basic and two cross-cutting steps. Five basic steps are made of (a) defining project scope and design, (b) assessing current vulnerability and adaptation, (c) assessing future climate-related risks, (d) developing an adaptation strategy, and (e) continuing the adaptation process. Cross-cutting steps consist of engaging stakeholder and enhancing adaptive capacity. The project scope and design process includes four major tasks: scope the project and define its objectives, establish the project team, review and synthesize existing information on vulnerability and adaptation, and design the APF project. The main purpose of assessing current vulnerability and adaptation is to understand the characteristics of current climate-related vulnerability in priority systems and the scope of adaptive responses. Future climate-related risks are assessed in order to characterize future climate-related risks, so that adaptation policies and measures can be designed to reduce the system's exposure to future climate hazard. In developing an adaptation strategy, all of the preceding APF-related work is synthesized into a well-considered strategy that can direct real adaptation action. Continuing the adaptation process is in order to implement and sustain the APF-strategy, polices, and measure. The purpose of involvement of stakeholders is to communicate between individuals and groups about projects. Finally, enhancing adaptive capacity provides guidance on how adaptive capacity can be assessed and enhanced.

Requirements Management Framework for Design Management and Information Characteristics (건설 발주자 설계 요건관리 체계화를 위한 개념적 틀 및 정보특성)

  • Jeong, Yeheun;Lee, Yunsub;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.3-15
    • /
    • 2020
  • For a successful construction project, the requirements of the client should be clearly defined and this should be reflected in the project based on the expertise of each project participant throughout the entire life-cycle. Therefore, it is necessary to establish the concept of Requirements Management to systematize and manage project requirements in terms of information management. This study aims to comprehensively define the concept of requirements management in the architecture industry and to provide a methodological basis for efficiently managing design requirements information by suggesting category of requirements information type and information analysis criteria. In addition, based on the case study, the requirements information was analyzed to propose a systemization methods of requirements management for PMO' design management and information management.

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF

Application of Artificial Neural Network Model for Environmental Load Estimation of Pre-Stressed Concrete Beam Bridge (PSC Beam교 환경부하량 추정을 위한 인공신경망 모델 적용 연구)

  • Kim, Eu Wang;Yun, Won Gun;Kim, Kyong Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.82-92
    • /
    • 2018
  • Considering that earlier stage of construction project has a great influence on the possibility of lowering of environmental load, it is important to build and utilize system that can support effective decision making at the initial stage of the project. In this study, we constructed an environmental load estimation model that can be used at the early stage of the project using basic design factors. The model was constructed by using the artificial neural network to estimate environmental load by applying to planning stage (ANN-1), basic design stage (ANN-2). The result of test, shows that average of absolute measuring efficiency and standard deviation of ANN-1 and ANN-2 were 11.19% / 5.30% and 9.59% / 3.09% each. This result indicates that the model using the input variables extended with the project progress has high reliability and it is considered to be effective in decision support at the initial design stage of the project.

A Study on the Practices of Landscape Planning & Design Services in Korea (조경계획.설계 기술용역의 수행실태에 관한 조사연구)

  • 권오준;심경구;김유일;고동완
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.4
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF

A Study on the Improvements of School Building Innovation Policy - Focused on Policy of School Building Emotionalization in Gangwondo - (학교 현장 중심의 학교공간혁신사업을 위한 개선방안 - 강원도교육청 학교 감성화사업을 중심으로 -)

  • Park, Sung-Chul;Yoo, Hae-Yeon;Kim, Hyun-Jin;Lee, Sang-Min;Shin, Eun-Gyeong
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.20 no.1
    • /
    • pp.11-18
    • /
    • 2021
  • The objective of this research is to propose the policy alternatives which can assist schools to effectively carry out the School Space Innovation Project (SSIP) of the Ministry of Education. The Emotional Space Project (ESP) of Gangwon-do School District was analyzed as one of representative SSIPs. Chapter II analyzed the project process and stakeholders involved in the ESP. Chapter III carried out the interview with the representative stakeholders that had participated in each step. The interview described the major problems ESP and SSIP have. Finally, Chapter IV proposed the comprehensive alternatives to deal with the problems, such as improving the effectiveness of project information sessions, strengthening the competencies of facilitators, and developing guidelines. It is expected that the research alternatives can be applied for developing innovative school spaces more suited to school scenes as well as helping effective operation of SSIP in schools.

Hands-on Education Module for Modular Construction, 3D Design, and 4D Schedule

  • Kithas, Kyle A.;Choi, Jin Ouk
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.484-491
    • /
    • 2022
  • A paradigm shift in teaching modular construction in higher education and K-12 is proposed as a means to increase the future adoption of the modular construction technique. To this effect, a new education module is presented to STEM educators. This education module is based on LEGOs and directed towards educators in the architecture, engineering, and construction (AEC) industry. The main objectives of the education module are to increase interest and knowledge of modular construction, acknowledge the benefits of using 3D design with 4D scheduling, and create a simulating hands-on educational opportunity. The education module is designed to allow participants to experience a hands-on simulation of modular construction and stick-built construction through building a LEGO project. Participants are challenged to find the advantages and disadvantages in both construction systems first-hand and record their findings. Results are presented from the preliminary testing of this education model on a group of construction management students at the University of Nevada, Las Vegas. Overall, the survey results showed that the LEGO education module was successful at achieving the project's three main objectives: 1) increasing the participants' interest and knowledge of modular construction through an interactive project; 2) increasing the participants' understanding of the benefits of 3D design with 4D scheduling over the use of 2D drawings; and 3) creating a simulating hands-on educational opportunity to help participants compare modular construction to stick-built construction. In the end, this proposed a new LEGO education module addressing the problems identified from this study with more participants.

  • PDF