• Title/Summary/Keyword: Design project

Search Result 4,019, Processing Time 0.025 seconds

The effects of the online team project-based learning on problem solving ability, cooperative self efficacy and cooperative self regulation in students of department of physical therapy

  • Kim, Jung Hee;Lee, Woo Hyung
    • Journal of Korean Physical Therapy Science
    • /
    • v.28 no.3
    • /
    • pp.1-10
    • /
    • 2021
  • Background: The purpose of this study is to investigate the effect of the online team project based learning on problem-solving, cooperative self-efficacy, and cooperative self-regulation of college students. Design: Single group pre-post design. Methods: The online team project based learning was conducted for a total of 92 college students for 8 weeks. A survey was conducted on problem-solving ability, cooperative self-efficacy, and cooperative self-regulation. In the online team project-based class, two projects were performed. It consists of video lectures and real-time video conferencing. Through the real-time video conference, the project was carried out based on discussion among learners and feedback was provided. Results: There was a significant difference in the change in problem-solving ability compared to before learning (p<0.05). As a result of the evaluation of cooperative self-efficacy, there was a significant difference (p<0.05). There was a significant differences in cooperative self-regulation compared to before learning (p<0.05). Conclusion: The online team project-based learning are effective in improving learners' problem-solving ability, cooperative self-efficacy, and cooperative self-regulation.

3D Earthwork BIM Design Process for a Road Project

  • Raza, Hassnain;Park, Sang-Il;Lee, Seung Soo;Tanoli, Waqas Arshad;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.8-15
    • /
    • 2017
  • Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.

Critical Success Factors of Large Design-Build Projects in Vietnam

  • Dang, Chau Ngoc;Le-Hoai, Long;Lee, Young-Dai
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.30-39
    • /
    • 2012
  • Design-build (D&B) has been broadly perceived as an effective project delivery method and become popular in the world. However, the implementation process of this innovative procurement method in Vietnam encounters difficulties due mainly to unfamiliarity and inexperience with the approach. Critical success factors (CSFs) which could be used to enhance the project execution are useful to practitioners in Vietnam if identified. A questionnaire survey was employed to identify CSFs of D&B projects in Vietnam. Parties' competence, especially financial capability, and contract documentation are the most important factors significantly affecting project success. It was also shown that the perspectives of two principal parties in D&B projects on the CSFs are statistically correlated. The identified CSFs were then validated with some various D&B projects. The execution results of CSFs' were compared with the projects' performance measured try key performance indicators (KPIs). The most important success factors of this study were also compared with other countries'. The validation and comparison results provide project participants with some useful information to perform D&B projects better. Practitioners should well perform the identified CSFs to enhance the chance of the success of D&B projects in Vietnam. The findings of this study are useful not only to Vietnamese practitioners but also to others who are concerned about D&B method and plan to employ it in Vietnam in future.

Profit-oriented Impact Analysis of Demand Management Strategy on Design-Build Firms Using System Dynamics

  • Yoo, Wi-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.169-182
    • /
    • 2012
  • In the past, a strategic management of work demands has been increasingly challenged to design-build (DB) firms. Such a management is capable of providing sufficient profitable impact of a project on them. Total project profit is mainly related to actual resources, work completion time, amount of rework, and costs. The degree of recycling work packages in the DB project delivery system is used as a measure of the quality of the performed work. However, there are few models available to evaluate the impact of a demand management strategy on the DB firms and to predict its behavior. We propose a decision-making support model as an aid for assessing the amount of rework and for predicting project profit resulting in a convincible demand management strategy. This model is constructed by using a dynamic feedback approach that can analyze the problems arising in complex managerial systems. For the purpose of illustration, widely acceptable strategies were applied into the model to explore their impacts on the DB firms. The results indicate that the model is helpful for the managers in selecting the most appropriate demand management strategy for successfully achieving their objectives.

Supporting Systematic Software Test Process in R&D Project with Behavioral Models

  • Choi, Hyorin;Lee, Jung-Won;Lee, Byungjeong
    • Journal of Internet Computing and Services
    • /
    • v.19 no.2
    • /
    • pp.43-48
    • /
    • 2018
  • Various artifacts that are produced as software R&D project progresses contain research plan, research report, software requirements and design descriptions, etc. When conducting a software R&D project, it is necessary to confirm that the developed system has implemented its research requirements well. However, various research results make it difficult to design appropriate tests. So, there is a practical need for us to comprehensively handle the planning, execution, and reporting of software test for finding and verifying information related to the research. In this paper, we propose a useful method for software test process in R&D project which supports model based software testing. The proposed method supports automation of test design and generation of test data by explicitly separating each step of System Under Test (SUT). The method utilizes the various models representing the control flow of the function to extract the information necessary for testing the system. And it supports a systematic testing process based on TMMi and ISO 29119. Finally, we show the validity of the method by implementing a prototype with basic functionality to generate test data from software behavioral models.

A Platform Design Study of Intelligent Program Management Information System (iPMIS) (지능형 종합사업관리 시스템 플랫폼 디자인 방안에 관한 연구)

  • Yeom, Ji-Woong;Kim, Ju-Hyung;Ahn, Byung-Ju;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.716-719
    • /
    • 2008
  • Yongsan International business Center, Incheon Songdo City, Roppongihill sand Midtown, including the most of latest internal and external construction projects become larger and more complicated than before. Mega project is one of most complicated project type as public and private sectors involve and the space will be construed in all directions i.e. horizontal, vertical, underground and ground. Therefore mega projects need a new program management information system to start the project's success. So this paper proposes a platform design study to intelligent program management information systems to mange mega projects.

  • PDF

Innovation of Engineering Education via Global Automotive Development Project

  • Jee, Hae-Seong
    • Journal of Engineering Education Research
    • /
    • v.12 no.3
    • /
    • pp.41-49
    • /
    • 2009
  • The paper introduces an educational environment for multidisciplinary automotive development project made with other global institutions worldwide. The main objective is to accelerate students design and manufacturing skills, while giving them the experience of global communications for a large scale collaboration. This objective demands the intimate partnership between industrial design and engineering worldwide as well. Not only is the design and manufacturing portion of the project a challenge, but the students must organize the project teams together to incorporate different subsystem designs from other institutions, which, after all, requires constant communication and a truly team-oriented atmosphere for the global innovative engineering education.

Class Design Applying Flipped Learning Combined with Project-Based Learning: Focusing on Digital Painting Tool for Class (플립러닝형 프로젝트 기반학습을 적용한 수업 설계: Digital Painting Tool 수업을 중심으로)

  • Sung, Rea;Kong, Hyunhee
    • Journal of Information Technology Applications and Management
    • /
    • v.29 no.1
    • /
    • pp.29-45
    • /
    • 2022
  • The Fourth Industrial Revolution era requires people to have the ability of integrated thinking, critics, sensitivity, and creativity in an integrated manner. Therefore, teaching methods are expected to become more suitable for the trend. In this belief, current teacher-leading education method should move to students' self motivating one and consist of programs in which students voluntarily involve. In this reason, this study suggests FPBL educational method model that is combines project-based learning with flipped learning by analysing preceding research and digital painting tool class was designed by applying it. As a result of applying the designed class model to the class, all of the class satisfaction, effectiveness, and interaction were evaluated positively. Problems such as limitations of project classes due to non-face-to-face classes, large amount of learning before class, and reduced concentration during class were found. Therefore, when the FPBL class model is conducted non-face-to-face, it will be necessary to further strengthen the role of the instructor, provide lecture videos summarizing the core contents, and improve concentration by providing active participation and fun using various digital tools. The result of the study looks significant by confirming the possibility of applying FPBL model not only in design education but also other educational settings.

A study on the Improvement Direction of Design Phase Entry Criteria Review for Naval Surface Ships & Onboard Weapon Systems R&D Project (함정 및 함정탑재 무기체계 연구개발사업의 설계단계 진입조건 검토 개선 방향)

  • Kwang Yong Hwang;Dong Myung Seol;Bong Wan Choi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.79-90
    • /
    • 2023
  • In principle, R&D of general weapons systems are led by companies or government-funded organizations. In terms of project execution, the defense R&D planning system was reorganized to conduct SE-based project management by integrating the naval ship project execution procedure into the general weapon system R&D procedure. The development progress was confirmed according to the guide for SE application of DAPA, and a technical review meeting was proposed to enter into the each next phase in the R&D process. This paper focuses on improvement for technical review in terms of technical management based on system engineering for R&D mounted weapon systems and the naval surface ship project in preliminary design and detailed design. So, the improvement direction for reviewing the entry criteria for the R&D weapons systems of the naval ship and mounted weapons is proposed.

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF