Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

Analysis of Improvement Methods of Safety Management Guidelines with Design for Safety

  • Kim, Minjung;Park, Moonseo;Lee, hyun-soo;Lee, Dowan;Lee, seul bi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.602-603
    • /
    • 2015
  • Despite all efforts to reduce construction disaster, construction site accident rate has steadily increased in Korea since 2008. As a different approach from traditional research, there is a growing issue about design for safety concept to prevent construction disaster. The notion is that construction worker's safety need to be considered at design phase, not only at construction phase. Globally, the notion has been noted that to improve the safety of the worker and used in practice. However, in Korea, most of safety management guidelines are limited to construction phase. From recent statistics, only 1.4 percent of designer feel responsible for safety accident at construction site. In this circumstance, this research find out safety guidelines through literatures reviews and practical experience of safety management in other country which apply design for safety concept. Selected guidelines are verified by survey which is evaluated with risk, function, cost, time and aesthetic view categories. Through the survey, define guidelines which could be effectively applied in Korea. By using proposed safety guidelines for design phase, preventing construction accident and improving designer's recognition of safety issue at design phase are expected.

  • PDF

Design management's development direction through design process improvement (설계업무 프로세스 개선을 통한 설계관리의 발전 방향)

  • Kim, Han;Kim, Seon-Gyoo;Lee, Nak-Woon
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.169-176
    • /
    • 2007
  • Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.

  • PDF

Prevention through Design (PtD) of integrating accident precursors in BIM

  • Chang, Soowon;Oh, Heung Jin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.94-102
    • /
    • 2022
  • Construction workers are engaged in many activities that may expose them to serious hazards, such as falling, unguarded machinery, or being struck by heavy construction equipment. Despite extensive research in building information modeling (BIM) for safety management, current approaches, detecting safety issues after design completion, may limit the opportunities to prevent predictable and potential accidents when decisions of building materials and systems are made. In this respect, this research proposes a proactive approach to detecting safety issues from the early design phase. This research aims to explore accident precursors and integrate them into BIM for tracking safety hazards during the design development process. Accident precursors can be identified from construction incident reports published by OSHA using a text mining technique. Through BIM-integrated accident precursors, construction safety hazards can be identified during the design phase. The results will contribute to supporting a successful transition from the design stage to the construction stage that considers a safe construction workplace. This will advance the body of knowledge about construction safety management by elucidating a hypothesis that safety hazards can be detected during the design phase involving decisions about materials, building elements, and equipment. In addition, the proactive approach will help the Architecture, Engineering and Construction (AEC) industry eliminate occupational safety hazards before near-miss situations appear on construction sites.

  • PDF

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A Study on the Improvement of Safety Management at the Construction Stage using Design for Safety Results - Focusing on the Connection between Design for Safety and Safety Management Plan (설계 안전성 검토 결과를 활용한 시공단계 안전관리 업무 개선 - 설계 안전성 검토와 안전관리계획의 연계를 중심으로)

  • Lee, Goon Jae
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.6
    • /
    • pp.54-60
    • /
    • 2020
  • Recently, the issue of construction safety is growing. In the construction industry, accidents have continued to increase since 2000. In particular, the number of accident deaths at small and medium-sized construction sites accounts for 72.11% of the total number of accident deaths in the construction industry. For construction safety, prior safety evaluation systems such as Design for safety and safety management plan preparation are in place. However, at construction sites, these systems are recognized as formal legal documents, and their effectiveness is greatly reduced. Therefore, in this study, a linkage model that links design safety review information and safety management plan information was presented so that the safety management plan can be efficiently established. In addition, the effectiveness of the proposed process was verified as an example of actual work. The linkage model will contribute to improving the safety management environment at the site by increasing the productivity of safety management work by enabling easy sharing of risk factor information in the construction stage safety management work. The results of this study will be used as basic information for the development of the integrated safety management system.

A STUDY ON THE OPTIMAZATION OF CONSTRUCTION MANAGEMENT BY USING A DESIGN STRUCTURE MATRIX

  • Nobuyuki Suzuki;Aketo Suzuki
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.383-388
    • /
    • 2005
  • In the construction industry, complex works are carried out with significant resources under non-linear circumstances where clear concepts of project management could be of benefit to all parties and personnel involved. In this paper, we define the optimum project management configuration for construction management by using DSM (Design Structure Matrix). Furthermore DSM can be visualized as a network model, and then Graph Theory provides us the numerical results.

  • PDF

A Construction Safety Management Information Model using the Concept of Design for Safety (Design for Safety 개념을 활용한 건설안전관리정보모형)

  • Hong Sung-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.109-116
    • /
    • 2004
  • The DfS(Design for Safety) concept is expected to be widely used to promote pro-active construction safety management. It will open up tremendous opportunities for tile owner, designer, and constructor to prevent accidents in construction projects. Construction safety management using the DfS concept is regarded as the most difficult job for the owner, designer and contractor to undertake, because an information model using the DfS concept is not utilized as a tool to support pro-active construction safety management. Therefore, there has been a growing need toward an information model during the design process ai recent practice of construction safety management have emphasized the significance of the pre-construction phase of projects. The objective of this study is to develop the construction safety information model being composed of conceptual, logical, and computerized information models as the tool that helps owner, designer and contractor find out and communicate as well as understand the hazardous nature of the construction projects during the design process.

  • PDF

An Analysis on the Propriety of Labor Input at Design Stage in Construction Management (건설사업 관리에 있어서 설계이전단계의 인력투입 적정성 분석)

  • An, Yang-Hoan;Kim, Young-Ai;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.32-41
    • /
    • 2009
  • In the execution of construction management, such pre-design steps as a planning stage, a basic design stage, and a work design stage are regarded as more important than an actual construction stage. However, the manpower input criterion from the aspect of construction management price standard in the Construction Engineering Management Law does not attach weight to the pre-design stage. In this regard, the aim of this study was to examine the propriety of manpower input in the pre-design stage of construction management and then present an improvement strategy of it. For this, the investigator examined the criterion of service price prescribed in the Construction Engineering Management Law and then comparatively analyzed four sites of construction management services. Study findings are as follows: 1) the actual state of manpower input based on the stepwise average price criterion of construction management service is presented with such steps as the newly established planning step (6.6%), the basic design stage (3.9%$\rightarrow$5.6%), the practical design stage(7.6%$\rightarrow$13.5%), the construction stage (88.5%$\rightarrow$64.0%), and the newly established maintenance stage (10.3%). The average price criterion is classified by total construction expenses and calculated by improved rates and stage; and 2) the three-step criterion of the Construction Engineering Management Law is classified into five stages including the planning stage and the maintenance stage by dividing it with the stepwise construction businesses. Study findings show that the calculation of price criterion in the actual site of construction management services must be operated in a practical and flexible manner and the systematic improvement of stepwise manpower input must be carried out actually.