• Title/Summary/Keyword: Design Rainfall

Search Result 705, Processing Time 0.027 seconds

Decision Making Model Using Multiple Matrix Analysis for Optimum Transportation Equipment Selection of Modular Construction (다중매트릭스 분석기법을 통한 모듈러 건축의 최적 운송장비 선정 의사결정지원 모델)

  • Lee, HyunJeong;Lee, JooSung;Lim, Jitaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.84-94
    • /
    • 2020
  • Modular architecture is very important not only in the design phase but also in the construction planning phase because it affects construction methods and module sizes depending on transport equipment. There are economic risks as well as quality, as there may be defects such as internal interiors or elimination of deadlines during transportation, and structural torsion caused by rainfall and shock. However, there is a lack of objective criteria or data to refer to in determining transport equipment that has a material effect on transport. Accordingly, there is no decision model to determine the optimum transportation equipment for each construction site. Therefore, it is necessary to develop a decision support model that can be compared to the review of transport equipment selection factors. The purpose of this study is to propose the transport equipment impact factors and decision support models for systematic review and objective decision making of each construction plan in the construction of small and medium-sized modulators. The decision model proposed in this study can be used as basic data for transport studies, ensuring objectivity and transparency in the equipment selection process.

A study on the determination of location of the detention pond in trunk sewer for reducing runoff amounts (우수유출저감을 위한 간선저류지 위치선정에 관한 연구)

  • Lee, Sung Ho;Yoon, Sei Eui;Lee, Jae Joon
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.4
    • /
    • pp.223-232
    • /
    • 2017
  • The ability to defend against floods in urban areas was weakened, because the increase in the impervious rate of urban areas due to urbanization and industrialization and the increase in the localized torrential rainfall due to abnormal climate. In order to reduce flood damage in urban areas, various runoff reduction facilities such as detention ponds and infiltration facilities were installed. However, in the case of domestic metropolitan cities, it is difficult to secure land for the installation of storm water reduction facilities and secure the budget for improving the aged pipelines. Therefore, it is necessary to design a storage system (called the detention pond in trunk sewer) that linked the existing drainage system to improve the flood control capacity of the urban area and reduce the budget. In this study, to analyze the effect of reducing runoff amounts according to the volume of the detention pond in trunk sewer, three kinds of virtual watershed (longitudinal, middle, concentration shape) were assumed and the detention pond in trunk sewer was installed at an arbitrary location in the watershed. The volume of the detention pond in trunk sewer was set to 6 cases ($1,000m^3$, $3,000m^3$, $5,000m^3$, $10,000m^3$, $20,000m^3$, $30,000m^3$), and the installation location of the detention pond in trunk sewer was varied to 20%, 40%, 60%, and 80% of the detention pond upstream area to the total watershed area (DUAR). Also, using the results of this study, a graph of the relationship and relational equation between the volume of the detention pond in trunk sewer and the installation location is presented.

Regional Frequency Analysis for Future Precipitation from RCP Scenarios (대표농도경로 시나리오에 의한 미래 강수량의 지역빈도해석)

  • Kim, Duck Hwan;Hong, Seung Jin;Choi, Chang Hyun;Han, Dae Gun;Lee, So Jong;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.17 no.1
    • /
    • pp.80-90
    • /
    • 2015
  • Variability of precipitation pattern and intensity are increasing due to the urbanization and industrialization which induce increasing impervious area and the climate change. Therefore, more severe urban inundation and flood damage will be occurred by localized heavy precipitation event in the future. In this study, we analyze the future frequency based precipitation under climate change based on the regional frequency analysis. The observed precipitation data from 58 stations provided by Korea Meteorological Administration(KMA) are collected and the data period is more than 30 years. Then the frequency based precipitation for the observed data by regional frequency analysis are estimated. In order to remove the bias from the simulated precipitation by RCP scenarios, the quantile mapping method and outlier test are used. The regional frequency analysis using L-moment method(Hosking and Wallis, 1997) is performed and the future frequency based precipitation for 80, 100, and 200 years of return period are estimated. As a result, future frequency based precipitation in South Korea will be increased by 25 to 27 percent. Especially the result for Jeju Island shows that the increasing rate will be higher than other areas. Severe heavy precipitation could be more and more frequently occurred in the future due to the climate change and the runoff characteristics will be also changed by urbanization, industrialization, and climate change. Therefore, we need prepare flood prevention measures for our flood safety in the future.

Study on Suggestion a Standard Installation for Damage Reduction alarm System using Cut-Slope Data (국내 도로절개면 현황 및 붕괴 분석을 통한 경보시스템 설치 기준에 관한 기초적 연구)

  • Bae, Gyu-Jin;Koo, Ho-Bon;Baek, Yong
    • The Journal of Engineering Geology
    • /
    • v.12 no.1
    • /
    • pp.53-61
    • /
    • 2002
  • Cut-slope due to the road construction is one of the most significant problems in the domestic case, that is, 70% of the land is covered by mountain. Moreover, typhoons or heavy rains concentrated in summer season causes the failure of cut-slope. Rock-fall and soil slope failure take 40.8% and 29.5% out of the entire domestic cut-slope failure, respectively. Rock-fall is quickly occurred by the free fall or rolling of rock fragments generally in the upper slope. Soil slope failure produces a clastics-flow and increases casualty especially when caused by heave rainfall because the velocity of the movement is verb high. Considering the car speed and rock-fall velocity, it will take a life in a moment. This study analyzes a set of field data of most recently collapsed domestic road cut-slopes to characterize these cut-slopes and the nature of rock-falls and clastics flows at each site. Based on the results, design criteria for a road alarm system are proposed, considering the relationship between the time required for clastics-flow and the velocity and braking distance of a cat at the incidence. The road alarm system proposed herein would operate instantly after a rock-fall and it will minimize damages, by warning drivels approaching to the collapse or collapsing location in advance.

The Application and Analysis of Scale Effect on Dynamic Flood Frequency Analysis (동역학적 홍수빈도 모형의 적용 및 해상도 영향 분석)

  • Mun, Jang-Won;Yu, Cheol-Sang;Kim, Jung-Hun
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.1
    • /
    • pp.81-90
    • /
    • 2001
  • A dynamic flood frequency analysis model was proposed for the frequency analysis in ungaged catchment and applied to 6 subbasins in Pyungchang River basin. As the dynamic flood frequency model requires precipitation, rainfall loss system, and runoff analysis, we adopt the rectangular pulse model, the SCS formula, and the geomorphoclimatic IUH(GcIUH) for the application. Input data for the analysis was borrowed from the results of the statistical flood frequency analysis using L-moment method for the same catchment, and then the return period was estimated using the model. This result was also compared with the return period estimated from the statistical analysis. By comparing with the results from two cases, we found the dynamic flood frequency analysis gave higher estimates than those from statistical analysis for the whole subbasins. However, the dynamic flood frequency analysis model has a potential to be used for determining the design flood for small hydraulic structure in ungaged catchment because it uses only physical parameters for flood frequency analysis. And this model can be easily applicable to other watersheds as the scale effect is negligible.

  • PDF

A Study on Daily Water Storage Simulation of the Daecheong Dam by Operation Scenario of the Yongdam Dam (용담댐 운영 시나리오에 따른 대청댐 저수량 변화에 관한 연구)

  • Noh Jaekyoung;Kim Hyun-hoo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1403-1407
    • /
    • 2005
  • In order to analyze the water storage of the Daecheong dam after constructing the Yongdam dam situated in upstream, a daily cascaded simulation model for analyzing water storages in the Yongdam-Daecheong dams was developed. Operation scenarios of the Yongdam dam were selected to 8 cases with the combinations of downstream outflows and water supplies to the Jeonju region. Daily water storages in the Daecheong dam was analyzed daily by simulating from 1983 to 2004. The results are summarized as follows. Firstly, water supplies from the Daecheong dam were analyzed to amount $1,964.2Mm^3$ on a yearly average in case without the Yongdam dam. In case with the Yongdam dam, water supplies from the Daecheong dam were analyzed to amount $1,858.7\~1,927.3Mm^3$ in case with downstream outflow of $5\;m^3$ is, and were analyzed to amount $1,994.9\~2,017.8Mm^3$ in case with downstream outflow of $10\;m^3/s $. These values are compared to $1,649Mm^3$ applied in design. Secondly, reservoir use rate which was defined rate of water supply to effective water storage reached $241.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $228.3\~236.8\% In case with downstream outflow of $5\;m^3/s$, and reached $245.1\~247.9\% in case with downstream outflow of $10\;m^3/s$. Thirdly, runoff rate which is defined rate of dam inflow to areal rainfall reached $57.3\% in case without the Yongdam dam. In case with the Yongdam dam, reservoir use rate reached $62.0\~68.4\% in case with downstream outflow of $5\;m^3/s$, and reached $64.1\~68.5\% in case with downstream outflow of $10\;m^3/s$. Fourth, in case with downstream outflow of $10\;m^3/s$ is from the Yongdam dam, appropriate water supply amounts to the Jeonju region were analyzed to only $0.50Mm^3/day$ from the daily simulation of water storages in the Yongdam dam. Comprehensively, water supply capacity of the Daecheong dam was analyzed to affect in small amounts in spite of the construction of the Yonsdam dam. It is effected to achieve the effective water management of the Yongdam dam and the Daecheong dam by using the developed cascaded model.

  • PDF

The Study on the Irrigation Water Control in the Cultivation of Rice Plants (수도작에 있어서 물관리에 대한 연구)

  • 이창구
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.8 no.2
    • /
    • pp.1193-1199
    • /
    • 1966
  • More stable and higher yields in rice paddy depend mainly upon an adequately balanced supply of water for higher yield. Rice paddy is supplied naturally by rainfall but inevitably requires artificial supplenental irrigation for higher yields. Even though it may be true that the water requirement of rice plants is generally higher than those of other crops, the submerged condition is not necessarily required for rice. The moisture requirements of rice vary according to its growing stages and it is possible to increse the irrigation efficiency by means of lessening the loss due to percolation and evapolation in the field. This experiment was conducted on the effect of the various amount of water supply and different irrigation periods for yield and yield components, and was carried out to find out the most suitable irrigation method and to increase the irrigation efficiency for higher yields in rice paddy. Randomized block design with 3 replications was employed where the 3 levels of the amount of irrigation water; (120% moisture contents), unirrigated (90~100%) and more un irrigated candition (80~90% moisture content), and levels of the various irrigation periods; usual, initial, intermediate and final periods, being treated. The results obtained in this experiment are as follows: 1. As for the physical and chemical and soil properfies, and other characteristics, there are no differences among the treatments enough to be effective for the growth of rice plants. 2. Culm length was measured after harvest as shown in table 2. 3. Difference of the amount of irrigation water did not change the culm length and ear length, however it also indicated more apparent increase in final treatment plots thatn that of usual. 3. No difference in the number of ears and number of ears pers per hill was founded treatments both in the difference of water supply and in the various irrigation periods. 4. There is no difference in the maturing rate and 1000 grains weight. 5. The number of panicles and grains and more increased in 80~100% moisture contents soil than those of 120%. and it shows in un irrigated plots, more irrigated plots and control plots in turn. Other wise according to the period\ulcorner of irrigation the trend is appeared in turn initial, usual, final and intermediate treatments.6. Yield as shown in table 7. 8 was more increased in unirrigated plots(90~IOO% moisture content) than the control plots (120% moisture content) by up to 8.2% and also 3. 2% in more unirrigated plots than that of control by periods is shown: usual plots final, initial, inter mediate treatment plots in turn. 7. The above resutts lead to the conclusion that no remarkable, differences in yields and soil properties are made by the unirrigation. However, it is apparent that this treatment has .some advantages in the points that one could spare the amount of water supply for irrigation with more increase in yield. In addition, a higher temperature and a brisk oxygen supply would be possible throug h this treatments. Accordingly, these treatment would be a more reasonable and economical cultivation method of rice for the better harvest.

  • PDF

Study on Shear Strength Using a Portable Dynamic Cone Penetration Test and Relationship between N-Nc (소형동적콘관입시험을 이용한 전단강도 산정 및 N-Nc 상관관계 연구)

  • Kim, Hyukho;Lim, Heuidae
    • Economic and Environmental Geology
    • /
    • v.50 no.2
    • /
    • pp.145-157
    • /
    • 2017
  • Because of Recent intensive rainfall, nationally landslides and slope failure phenomenon has been frequently occur. Providing proposed-measures to the natural disasters that occur in these localities and the slope, must be derived ground of strength parameters(shear strength) as a design input data. However, it is such as extra deforestation and a lot of economic costs in order to make the access to the current area and the slopes ground survey is required. Thus, by small dynamic cone penetration test machine using the human to carry in the field, it is possible to easily measure the characteristics and strength constant of the ground of more than one region. In this study through researching analysis of the domestic and foreign small dynamic cone penetration test method, it has proposed a cone material and test methods suitable for the country. Cone penetration test Nc in the field has comparated with analysis of the value and the standard penetration test N value. And, in addition to this, direct shear test and borehole shear test were performed by depth, bedrock, and soil type and passing #200 and the correlation of the Nc value. In particular, in the present study, for the sandy soil that has distict distribute in mountain, it is proposed relation of shear strength corresponding to the Nc value (cohesion and internal friction angle) in order to calculate such effective ground shear strength.

Improvement and Application of Pump Station Operating System and Economic Analysis of the Application (빗물펌프장 운영시스템 개선 및 적용과 경제효과분석)

  • Joo, Jin- Gul;Yoo, Do-Guen;Yang, Jae-Mo;Jung, Dong-Hwi;Kim, Joong-Hoon
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.3
    • /
    • pp.155-165
    • /
    • 2010
  • In low-lying districts of urban areas, pump stations were built to protect flooding by the heavy rain. Particularly, the automatic pump operation system was installed for efficiency in the pump stations of Seoul. However, the effective pump operation is difficult under existing operating system because the system only performs operation by reservoir depth. This study would like to improve the real time operating system suggested by Jun et al.(2007) and to apply the system Gasan 1 pump station in Seoul. For various design rainfall events, maximum water levels simulated by the suggested system were 10~70cm lower than results by the existing system. And overflow volume at upstream manholes were 50% reduced. We converted the flood control effects by establishment of the suggested system to economic indicators. To obtain the same effect, approximately 4.9 billion won needs to expand pump capacities or 3.2~6.9 hundreds million won needs to construct storm water detention on upstream area. The suggested system could improve the flood control stability by efficient operation of the existing pump station.

Dynamic-stability Evaluation of Unsaturated Road Embankments with Different Water Contents (함수비에 따른 불포화 도로성토의 동적 안정성 평가)

  • Lee, Chung-Won;Higo, Yosuke;Oka, Fusao
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.6
    • /
    • pp.5-21
    • /
    • 2014
  • It has been pointed out that the collapses of unsaturated road embankments caused by earthquake are attributed to high water content caused by the seepage of the underground water and/or the rainfall infiltration. Hence, it is important to study influences of water content on the dynamic stability and deformation mode of unsaturated road embankments for development of a proper design scheme including an effective reinforcement to prevent severe damage. This study demonstrates dynamic centrifugal model tests with different water contents to investigate the effect of water content on deformation and failure behaviors of unsaturated road embankments. Based on the measurement of displacement, the pore water pressure and the acceleration during dynamic loading, dynamic behavior of the unsaturated road embankments with about optimum water content and the higher water content than the optimum one have been examined. In addition, an image analysis has revealed the displacement field and the distributions of strains in the road embankment, by which deformation mode of the road embankment with higher water content has been clarified. It has been confirmed that in the case of higher water content the settlement of the crown is large mainly owing to the volume compression underneath the crown, while the small confining pressure at the toe and near the slope surface induces large shear deformation with volume expansion.