• Title/Summary/Keyword: Design Organizations Maturity

Search Result 8, Processing Time 0.025 seconds

Macro Interface: Organizational Design for UI Team (거시 인터페이스: UI(User Interface) 조직 구축에 관한 연구)

  • Pan, Young-Hwan
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.3
    • /
    • pp.43-47
    • /
    • 2006
  • Macro interface is primarily focused at the organization, while micro interface is primarily focused at the products or services. UI(User Interface) or UX(User Experience) organizations in Korea are institutionalized from 2000 years. Since most of the UI organizations are not institutionalized with the strategic plan, structures of them aren't optimized efficiency. The structure of the organization is conceptualized as having three core dimensions: complexity, formalization, and centralization. The status of the UI organizations in Korea is reviewed with these dimensions. This study issued the key success factors for institutionalization for UI team. Organizational maturity is considered in 5 levels based on a model by CMMI. The UI strategy has to be based the maturity level of the organization.

A Study on the Evaluation Items of BIM Process Maturity Measurement Model (BIM 프로세스 성숙도 측정 모델의 평가항목에 대한 연구)

  • Lee, Jae-sung;Ock, Jong-ho
    • Korean Journal of Computational Design and Engineering
    • /
    • v.21 no.3
    • /
    • pp.281-295
    • /
    • 2016
  • Lately, the management of domestic BIM performance is quite lacking, as the evaluation and management data from successful cases of BIM implementation both on projects and in companies, and related effects (time, cost and other physical gains) are not well kept for future use in BIM development. In order to overcome the above obstacles, a systematic approach to evaluating BIM adoption with focus on particular elements like BIM implementation environment and processes, and the physical factors yielded by BIM, is necessary. In this study, objective and detailed assessment indicators and weights that are appropriate for the domestic situation were derived through research for purposes of developing a web-based BIM maturity measurement program that is tailor-made for the Korean construction atmosphere. Through a company's self-maturity measurement, excellent quality of BIM deliverables and output can be achieved and managed. Furthermore, the domestic BIM capacity can gradually increase since design firms' BIM capability can be judged during procurement basing on measurement indicators.

Key Indicators for Evaluating BIM Collaboration Performances.

  • Sacchettini, Lou;Park, Moonseo;Lee, Hyun-Soo;Lee, Jin Gang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.236-240
    • /
    • 2015
  • The accelerating adoption of BIM (Building Information Modeling) is challenging collaboration practices established in the construction industry. The implementation of BIM involves changes in participants work, organization, processes and collaboration methods. Therefore there is a need to be able to measure effectively and accurately collaboration, in order to analyze and determine current practices and their performances in organizations (company, team project) as well as changes required. Previous researches scope from evaluating BIM maturity of an organization to BIM collaboration requirements but lack of proper tools and methods to analyze collaboration performances. This is especially true when it comes to evaluate the efficiency and collaboration performances of processes rather than systems or organizations. Thus this research aims to analyze systematically and comprehensively previous researches proposing diversified methods to evaluate BIM performances and collaboration. Furthermore it aims to suggest key indicators to evaluate collaboration performances of processes and project organizations. This research may contribute to better understanding of collaboration performances within organizations using BIM and further development of evaluation method for analyzing BIM design project.

  • PDF

Design of A Model of Software Process Concept Based On Ontology (온톨로지 기반의 소프트웨어 프로세스 개념 모델 설계)

  • Shin, Byung-Ho;Choi, Eui-Kwon;Lee, Sang-Bum;Chung, Joon-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.13 no.2
    • /
    • pp.1-9
    • /
    • 2008
  • As the size of software becomes larger and the features of it become complex. it is really hard to successfully complete the project without following development guidelines. Software process is the best practices and procedures that organizations of high maturity and capability of software development carry out in common, and it is a set of progressive ideas of management. However, complicated and unfamiliar concepts can interrupt the introduction and improvement of software process of the organizations. Even though many kinds of frameworks such as standard of process and maturity measurement models are introduced, it is still difficult to follow software process without fully understanding their relations. The purpose of this study is to support successful internalization of organizations that introduce and use software process. It also suggests the design of standard ontology, standard relationship domain ontology, and the lifestyle of software process and the relations between them.

  • PDF

A Study on the Design of EA Performance Evaluation Model and the Application Case (EA성과평가 모델의 설계 및 적용사례에 관한 연구)

  • Lee, Seok-Kyun;Lee, Young-Min;Rhew, Sung-Yul
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.395-406
    • /
    • 2009
  • Korean government has operated EA by the act on efficient introduction of information system and operation, etc. But the evaluation system for EA and the criteria don't prepare well. Particularly, There is no model for EA performance measurement and the way is insufficient. In this study, we derived 8 areas and 17 criteria for the performance evaluation based on the Performance Reference Model of U.S FEA and Korea. And we also derived 8 areas and 10 criteria for it based on the OMB EA Assessment Framework and the EA maturity model in Korea. We propose the performance evaluation model of the five areas that consists of the business performance, customer performance, process, human resource and the technology for EA performance evaluation. To verify the model, we applied the model to three organizations and evaluated EA performance. In addition, we compared the performance result with the performance evaluation area of EA maturity model of Korea to verify the result. We also analyzed the criteria of the proposed performance evaluation model with the current EA maturity model and Performance Reference Model of Korea. As a result of the evaluation, we verified of the proposed performance evaluation model, too.

A Case Study of Japanese Local Self-Governments Universal Design Policy (일본 자치체의 유니버설디자인 정책 사례연구)

  • Lee, Ho-Soong
    • Archives of design research
    • /
    • v.19 no.1 s.63
    • /
    • pp.27-38
    • /
    • 2006
  • Recently, in each local self-governments Japan, the importation of universal design policy is actively being expanded as a plan to maximize living satisfaction of.citizens within the region. This research investigates the background on how the local self-governments ended up importing the universal design administrative policy, investigates the policies which each self governing bodies have been promoting and presents necessary stipulations following those policies. When we sum up the necessity of promoting universal design by local self-governments, although the we carry various problems in the promoting process in the settlement of provincial era and promoting substantiality of it, we can point out the low birth rate phenomenon, progression of aged people's society, diversification of values as a result of social and economic maturity, etc. as social and economic background. For people's values, as they escape from the economic they attach great importance to economic supremacy, they respect culture, environment, etc. with higher level than economic aspect and the improvement of life's quality is becoming important. Meanwhile, the universal design which is known to many users as a usable design concept as reach to a point where it is getting attention as a basic concept of 21st century design. Today, each of local self-governments in Japan are making various efforts for unperturbed importation and application of universal design to local communities through homepage, universal design guideline or report, various workshops, etc. Especially, there are universal design policies of public areas, facilities, manufacture of other products and information for the contents of the policy. The enforcement of universal design policy puts importance in 1) the process of planning, alteration, policy scheme and decision making 2) the process of policy's enforcement 3) the probation process of all processes and I could find out that equal participation of roles by local citizens, citizen's organizations, companies with the administration hasn't been adopted for each of these processes.

  • PDF

Generation of Business Process Reference Model Considering Multiple Objectives

  • Yahya, Bernardo Nugroho;Wu, Jei-Zheng;Bae, Hye-Rim
    • Industrial Engineering and Management Systems
    • /
    • v.11 no.3
    • /
    • pp.233-240
    • /
    • 2012
  • The implementation of business process management (BPM) systems in large number of business organizations transforms BPM system into such a level of maturity and tends to collect large repositories of business process (BP) models. This issue encourages BP flexibility that leads to a large number of process variants derived from the same model, but differing in structure, to be stored in the large repositories of BP models. Therefore, the repositories may include thousands of activities and related business objects with variation of requirements and quality of service. It is a common practice to customize processes from reference processes or templates in order to reduce the time and effort required to design and deploy processes on all levels. In order to address redundancy and underutilization problems, a generic process model, called as reference BP, is absolutely necessary to cover the best of process variants. This study aims to develop multiple-objective business process genetic algorithm (MOBPGA) to find a set of non-dominated (Pareto) solutions of business reference model to enhance conventional approach which considered only a single objective on creating BP reference model by using proximity score measurement. A mixed-integer linear program is constructed to evaluate performance of the proposed MOBPGA on small-scale problems by using standard measures for multiple-objective techniques. The results will show the viability of applying MOBPGA in terms of simultaneously maximizing proximity score measurement, minimizing total duration, and total costs of the selected reference model.

Framework for Improving Mobile Embedded Software Process (모바일 임베디드 소프트웨어 프로세스 개선 프레임워크)

  • Shin, Seung-Woo;Kim, Haeng-Kon;Kim, Soung-Won
    • Journal of Internet Computing and Services
    • /
    • v.10 no.5
    • /
    • pp.195-209
    • /
    • 2009
  • The embedded software has been become more important than the hardware in mobile systems in ubiquitous society. The improvement models such as CMMI(Capability Maturity Model Integration) and SPICE(Software Process Improvement and Capability dEtermination) are used to improve the quality of software in general systems. Software process improvement is also necessary for mobile embedded software development to improve its quality. It is not easy to apply the general software improvement model to the mobile embedded software development due to the high cost effectiveness and heavy process. On the other hand, XP has the characteristics on focused communications with customers and iteration development. It is specially suitable for mobile embedded software development as depending on customer's frequent requirement changes and hardware attributes. In this paper, we propose a framework for development small process improvement based XP(eXtreme Programming)'s practice in order to accomplish CMMI level 2 or 3 in mobile embedded software development at the small organizations. We design and implement the Mobile Embedded Software Process Improvement System(MESPIS) to support process improvement. We also suggest the evaluation method for the mobile embedded software development process improvement framework with CMMI coverage check by comparing other process improvement model. In the future, we need to apply this proposed framework to real project for practical effectiveness and the real cases quantitative. It also include the enhance the functionality of MESPIS.

  • PDF