1 |
Lee, J.S., Kim, M.W. and Ock, J.H., 2015, A Study on the Development of BIM Process Maturity Measurement Model, Proceedings of the Society for Computational Design and Engineering Conference, 611-617.
|
2 |
Kang, T.W., 2013, A Study on the Development Direction of a BIM Performance Assessment Tool, Journal of Korea Spatial Information Society, 21(1), pp.55-56.
|
3 |
Lee, J.H., 2011, A Study on BIM Capability Evaluation for Design Organizations, Journal of Architectural Institute of Korea, 27(6), pp.260.
|
4 |
Kang, H.M., 2013, A Study on Evaluation of the BIM Capability Maturity and Recognition Comparison Analysis for Construction Organization, Master Thesis, Ewha Womans University, pp.34-35.
|
5 |
Lee, S.K., 2014, BIM Acceptance Readiness Evaluation Model Considering Organizational Culture, KwangWoon University.
|
6 |
Yang, B.H., 2013. A Study on the BIM Maturity Measurement of Domestic Field Based BIM Capability Maturity Model, Sungkyunkwan University.
|
7 |
Shin, S.H., Ham, N.H. and Kim, J.J., 2010, Assessment of BIM-Based Government Funded Projects at the Design Phase, Journal of the Korea Institute of Building Construction.
|
8 |
Carnegie Mellon University Software Engineering Institute, 2003, The Capability Maturity Model: Guidelines for Improving the Software Process, Pearson Education Korea.
|
9 |
National Information Society Arency, 2007, 2007 Enterprise Informatization Level Evaluation Report.
|
10 |
Public Procurement Service Press, 2015.
|
11 |
BIM performance, www.buildingsmart.or.kr
|
12 |
bimSCORE, www.sbi.international
|