• Title/Summary/Keyword: Delay cost

Search Result 822, Processing Time 0.028 seconds

HESnW: History Encounters-Based Spray-and-Wait Routing Protocol for Delay Tolerant Networks

  • Gan, Shunyi;Zhou, Jipeng;Wei, Kaimin
    • Journal of Information Processing Systems
    • /
    • v.13 no.3
    • /
    • pp.618-629
    • /
    • 2017
  • Mobile nodes can't always connect each other in DTNs (delay tolerant networks). Many DTN routing protocols that favor the "multi-hop forwarding" are proposed to solve these network problems. But they also lead to intolerant delivery cost so that designing a overhead-efficient routing protocol which is able to perform well in delivery ratio with lower delivery cost at the same time is valuable. Therefore, we utilize the small-world property and propose a new delivery metric called multi-probability to design our relay node selection principles that nodes with lower delivery predictability can also be selected to be the relay nodes if one of their history nodes has higher delivery predictability. So, we can find more potential relay nodes to reduce the forwarding overhead of successfully delivered messages through our proposed algorithm called HESnW. We also apply our new messages copies allocation scheme to optimize the routing performance. Comparing to existing routing algorithms, simulation results show that HESnW can reduce the delivery cost while it can also obtain a rather high delivery ratio.

A Development of DCS Binding Delay Analysis System based on PC/Ethernet and Realtime Database

  • Gwak, Kwi-Yil;Lee, Sung-Woo;Lim, Yong-Hun;Lee, Beom-Seok;Hyun, Duck-Hwa
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1571-1576
    • /
    • 2005
  • DCS has many processing components and various communication elements. And its communication delay characteristic is affected diverse operating situation and context. Especially, binding signal which traversed from one control-node to another control-node undergo all sort of delay conditions. So its delay value has large deviation with the lapse of time, and the measurement of delay statistics during long time is very difficult by using general oscilloscope or other normal instruments. This thesis introduces the design and implementation of PC-based BDAS(Binding Delay Analysis System) System developed to overcomes these hardships. The system has signal-generator, IO-card, data-acquisition module, delay-calculation and analyzer module, those are implemented on industrial standard PC/Ethernet hardware and Windows/Linux platforms. This system can detect accurate whole-system-wide delay time including io, control processing and network delay, in the resolution of msec unit, and can analyze each channel's delay-historic data which is maintained by realtime database. So, this system has strong points of open system architecture, for example, user-friendly environment, low cost, high compatibility, simplicity of maintenance and high extension ability. Of all things, the measuring capability of long-time delay-statistics obtained through historic-DB make the system more valuable and useful, which function is essential to analyze accurate delay performance of DCS system. Using this system, the verification of delay performance of DCS for nuclear power plants is succeeded in KNICS(Korea Nuclear Instrumentation & Control System) projects

  • PDF

LFH: Low-Cost and Fast Handoff Scheme in Proxy Mobile IPv6 Networks with Multicasting Support (프록시 모바일 IPv6 네트워크에서 멀티캐스팅을 지원하는 저비용의 빠른 이동성관리 기법)

  • Kim, Eunhwa;Jeong, Jongpil
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.6
    • /
    • pp.265-278
    • /
    • 2013
  • With the recent advancements in various wireless communication technologies, the importance of mobile multicasting is coming to the fore, in an effort to use network resources more efficiently. In the past, when various mobile IP-based multicast techniques were proposed, the focus was put on the costs needed for network delivery for providing multicast services, as well as on minimizing the multicast handover delay. For techniques using MIPv6 (Mobile IPv6), a host-based mobility management protocol, however, it is fundamentally difficult to resolve the problems of handover delay and tunnel convergence. To resolve these problems, a network-based mobility management protocol called PMIPv6 (Proxy Mobile IPv6) was standardized. Although performance is improved in PMIPv6 over MIPv6, it still suffers from the problems of handover delay and tunnel convergence. In this paper, to overcome these limitations, a technique called LFH (Low-cost and Fast Handoff) is proposed for fast and low-cost mobility management with multicasting support in PMIPv6 networks. To reduce the interactions between the complex multicast routing protocol and the multicast messages, a simplified proxy method called MLD (Multicast Listener Discovery) is implemented and modified. Furthermore, a TCR (Tunnel Combination and Reconstruction) algorithm was used in the multicast handover procedure within the LMA (Local Mobility Anchor) domain, as well as in the multicast handover procedure between domains, in order to overcome the problem of tunnel convergence. As a result, it was found that LFH has reduced multicast delay compared to other types of multicast techniques, and that it requires lower costs as well.

Optimal Release times of a Software Cost Model with Consideration of Various Costs

  • Lee Chong Hyung;Jang Kyu Beom;Park Dong Ho
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.251-257
    • /
    • 2005
  • Software system which is essential in operating the computer has gradually become an indispensable element in many aspects of our daily lives and an important factor in numerous systems. In recent years, software cost sometimes exceeds the cost of maintaining the hardware system. In addition to the cost necessary to develop the new software system and to maintain the system, the penalty costs incurred due to software failures are even more significant. In this paper, a cost model incorporating the warranty cost, debugging costto remove each fault detected in the software system, and delivery delay cost is developed. A software reliability model based on non-homogeneous Poisson process(NHPP) is established and the optimal software release policies to minimize the expected total software cost are discussed. Numerical examples are provided to illustrate the results.

  • PDF

LQ-PID Controller Tuning for the Second-Order System with Time-Delay (시간지연을 갖는 2차 시스템의 LQ-PID 제어기 동조)

  • 박택선;서병설
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.41 no.2
    • /
    • pp.1-8
    • /
    • 2004
  • This paper presents an optimal robust LQ-PID controller design method for the second order system with time-delay to meet design specifications. By LQR formulation of the second order system with time-delay, the tuning parameters of PID controller are related by weighting factors Q and R of cost function. The selection of weighting factors Q and R are chosen to satisfy such the design specifications as overshoot and settling time.

Performance Analysis of Registration Delay Time by Varying Number of foreign Agent in Regional Registration (지역 등록 방법에서 외부 에이전트 수의 변화에 따른 등록 지연시간의 성능분석)

  • 이용덕;곽경섭
    • Journal of Korea Multimedia Society
    • /
    • v.7 no.1
    • /
    • pp.106-112
    • /
    • 2004
  • Mobile IP is a solution for mobility on the global Internet. However, it causes service delay incase of frequent movement of mobile node and mobile users. Mobile IP regional registration is Proposed to reduce the service delay. In this paper, we introduce an optimal regional location management mechanism for Mobile IP that reduces the registration delay. The movement of mobile node is described by a discrete analytical model. The proposed model explains analytically average packet rate and registration cost as the size of regional networks with mobility of mobile node.

  • PDF

Analysis of Progress Schedule and Delay Element of Frame Works in Apartments (아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구)

  • 최은준;최민권;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

Model Predictive Control for Input Constrained Systems with Time-varying Delay (시변 시간지연을 가지는 입력제한 시스템의 모델예측제어)

  • Lee, S.M.
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.7
    • /
    • pp.1019-1023
    • /
    • 2012
  • This paper considers a model predictive control problem of discrete-time constrained systems with time-varying delay. For this problem, a delay dependent state feedback control approach is used to achieve asymptotic stabilization of systems with input constraints. Based on Lyapunov stability theory, a new stability condition is obtained via linear matrix inequality formulation to find cost monotonicity condition of the model predictive control algorithm which guarantee the closed loop stability. Finally, the proposed method is applied to a numerical example in order to show the effectiveness of our results.

Sensing of Three Phase PWM Voltages Using Analog Circuits (아날로그 회로를 이용한 3상 PWM 출력 전압 측정)

  • Jou, Sung-Tak;Lee, Kyo-Beum
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.11
    • /
    • pp.1564-1570
    • /
    • 2015
  • This paper intends to suggest a sensing circuit of PWM voltage for a motor emulator operated in the inverter. In the emulation of the motor using a power converter, it is necessary to measure instantaneous voltage at the PWM voltage loaded from the inverter. Using a filter can generate instantaneous voltage, while it is difficult to follow the rapidly changing inverter voltage caused by the propagation delay and signal attenuation. The method of measuring the duty of PWM using FPGA can generate output voltage from the one-cycle delay of PWM, while the cost of hardware is increasing in order to acquire high precision. This paper suggests a PWM voltage sensing circuit using the analogue system that shows high precision, one-cycle delay of PWM and low-cost hardware. The PWM voltage sensing circuit works in the process of integrating input voltage for valid time by comparing levels of three-phase PWM input voltage, and produce the output value integrated at zero vector. As a result of PSIM simulation and the experiment with the produced hardware, it was verified that the suggested circuit in this paper is valid.

Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.