Journal of the Institute of Electronics Engineers of Korea SD
/
v.44
no.12
/
pp.18-24
/
2007
As VLSI technology scales to nano-meter order, relatively increasing global wire-delay has added complexity to system design. Global wire-delay could be reduced by inserting pipeline-elements onto wire but it should be coupled with LIP(Latency Intensive Protocol) to have correct system timing. This combination however, drops the throughput although it ensures system functionality. In this paper, we propose a computation method useful for minimizing throughput deterioration when pipeline-elements are inserted to reduce global wire-delay. We apply this method while placing blocks in the floorplanning stage. When the necessary for this computation is reflected on the floorplanning cost function, the throughput increases by 16.97% on the average when compared with the floorplanning that uses the conventional heuristic throughput-evaluation-method.
Journal of Electrical Engineering and information Science
/
v.2
no.6
/
pp.28-35
/
1997
A new approach concurrent transistor sizing and buffer insertion for low power optimization is proposed in this paper. The method considers the tradeoff between upsizing transistors and inserting buffers and chooses the solution with the lowest possible power and area cost. It operates by analyzing the feasible region of the cost-delay curves of the unbuffered and buffered circuits. As such the feasible region of circuits optimized by our method is extended to encompass the envelop of cost-delay curves which represent the union of the feasible regions of all buffered ad unbuffered versions of the circuit. The method is efficient and tunable in that optimality can be traded for compute time and as a result it can in theory near optimal results.
International conference on construction engineering and project management
/
2007.03a
/
pp.150-159
/
2007
More often than not, cost claims which are legitimately due and entitled to the contractor for works done, or for loss and expense incurred arising from disruption, prolongation and delay, are surprising not successfully recovered, whether in whole or in part, or none at all. One of the main reasons attributing to such scenario, is due to either the contractor, employer or the consultants and their poor understanding of and adherence to established and proper contractual rubric that is embodied in the building construction contract for the works. This paper explores some such pitfalls that could very well spell the ultimate financial disaster for many contractors, and highlights salient and essential intimations that contractors and consultants should watch out for.
이 논문에서는 통신망 설계 응용분야의 문제를 그래프 이론 문제로써 고려해 보았다. 개별 기업체가 서로 떨어진 두 곳을 연결하고자 할 때 공용통신망의 회선을 빌려 통신망을 구축하게 되는데 많은 경우 여러 종류의 회선들이 공급됨으로 어떤 회선을 선택하느냐의 문제가 생긴다. 일반적으로 빠른 회선(low delay)은 느린 회선(high delay)에 비해 비싸다. 그러나 서비스의 질(Quality of Service)이라는 요구사항이 종종 종단지연(end-to-end delay)시간에 의해 결정되므로, 무조건 낮은 가격의 회선만을 사용할 수는 없다. 결국 개별 기업체의 통신망을 위한 통로를 공용 통신망 위에 덮어씌워(overlaying) 구축하는 것의 여부는 두 개의 상반된 인자인 가격과 속도의 조절에 달려 있다. 따라서 일반적인 최소경로 찾기의 변형이라 할 수 있는 다음의 문제가 본 논문의 관심사이다. 두 개의 지점을 연결하는데 종단지연시간의 한계를 만족하면서 최소경비를 갖는 경로에 대한 해결을 위하여, 그래프 채색(coloring) 문제와 최단경로문제를 함께 포함하는 그래프 이론의 문제로 정형화시켜 살펴본다. 배낭문제로의 변환을 통해 이 문제는 {{{{NP-complete임을 증명하였고 {{{{O($\mid$E$\mid$D_0 )시간에 최적값을 주는 의사선형 알고리즘과O($\mid$E$\mid$)시간의 근사 알고리즘을 보였다. 특별한 경우에 대한 {{{{O($\mid$V$\mid$ + $\mid$E$\mid$)시간과 {{{{O($\mid$E$\mid$^2 + $\mid$E$\mid$$\mid$V$\mid$log$\mid$V$\mid$)시간 알고리즘을 보였으며 배낭 문제의 해결책과 유사한 그리디 휴리스틱(greedy heuristic) 알고리즘이 그물 구조(mesh) 그래프 상에서 좋은 결과를 보여주고 있음을 실험을 통해 확인해 보았다.Abstract This paper considers a graph-theoretic problem motivated by a telecommunication network optimization. When a private organization wishes to connect two sites by leasing physical lines from a public telecommunications network, it is often the cases that several categories of lines are available, at different costs. Typically a faster (low delay) lines costs more than a slower (high delay) line. However, low cost lines cannot be used exclusively because the Quality of Service (QoS) requirements often impose a bound on the end-to-end delay. Therefore, overlaying a path on the public network involves two diametrically opposing factors: cost and delay. The following variation of the standard shortest path problem is thus of interest: the shortest route between the two sites that meets a given bound on the end-to-end delay. For this problem we formulate a graph-theoretical problem that has both a shortest path component as well as coloring component. Interestingly, the problem could be formulated as a knapsack problem. We have shown that the general problem is NP-complete. The optimal polynomial-time algorithms for some special cases and one heuristic algorithm for the general problem are described.
Journal of Korean Society of Industrial and Systems Engineering
/
v.16
no.27
/
pp.91-104
/
1993
This paper is concerned with flow shop scheduling problems having the common due date. V-shape property is used for algorithms with early and tardy penalty cost. The objective of this paper is developing efficient heuristic scheduling algorithms for minimizing total penalty cost function and determining the optimal common due date. The between job delay and the work in process are considered for developing algorithms as penalty cost. Algorithms is simulated to analyze interrelated factors. A numerical example is given for illustrating the proposed algorithms.
International Journal of Control, Automation, and Systems
/
v.3
no.4
/
pp.640-645
/
2005
Closed-loop model-free optimization of positive feedback time delay controllers for dominant time delay systems is presented. Iterative feedback tuning (IFT) is applied to the tuning of positive feedback time delay controller. Three experiments are carried out to perform the model-free gradient descent optimization. The initial controller parameters and duration in specifying the cost function are suggested. The effects of step size, filter function and time weighting function on the performance of the optimized controlled are given. Simulation and experimental studies are included to demonstrate the effectiveness of the tuning scheme.
Korean Journal of Construction Engineering and Management
/
v.7
no.5
/
pp.177-190
/
2006
Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.
Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
Proceedings of the Korean Institute of Building Construction Conference
/
2011.05a
/
pp.191-192
/
2011
The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.
International Journal of Advanced Culture Technology
/
v.9
no.3
/
pp.271-276
/
2021
In this paper we analyze the effect of the credit period on inventory policy under trade credit with ordering cost including a fixed cost and freight cost, where the freight cost has a quantity discount. For marketing purposes, some supplier offers credit period to his buyer to stimulate the demand for the product he produces. The delay in payments during the credit period has the effect of reducing the buyer's capital opportunity cost. It is also assumed that the buyer pays the freight cost for the order and hence, the ordering cost consists of a fixed ordering cost and a variable freight cost which depends on the order quantity. As a result, the possibilities of trade credit and discounts on freight costs are expected to play an important role in the buyer's inventory policy. Based on the economic order quantity inventory model, we analyze how the buyer can determine the optimal inventory policy and we examine the effect of the length of credit period on the buyer's inventory policy.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.