Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

An Analysis for Irregularity of Tropospheric Delay due to Local Weather Change Effects on Network RTK (지역적 기상 차이에 의한 대류권 지연 변칙이 네트워크 RTK 환경에 미치는 영향 분석)

  • Han, Younghoon;Shin, Mi Young;Ko, Jaeyoung;Cho, Deuk Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.12
    • /
    • pp.1690-1696
    • /
    • 2014
  • Network RTK generates spatial corrections by using differenced measurements from reference stations in the network, and the corrections are then provided to a rover. The rover, generally, uses linear interpolation, which assumes that the corrections at each reference station are spatially correlated, to obtain a precise correction of its location. However, an irregularity of the tropospheric delay is a real-world factor that violates this assumption. Tropospheric delay is a result of weather conditions, such as humidity, temperature and pressure, and it can cause spatial decorrelation when there are changes in the local climate. In this paper, we have defined the non-linear characteristics of the tropospheric delay between reference stations or user within a region as the "irregularity of tropospheric delay". Such an irregularity can negatively impact the network RTK performance. Therefore, we analyze the influence of the irregularity of tropospheric delay in network RTK based on meteorological data.

An Analysis on Work Delaying Factors in Apartment Building Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.496-501
    • /
    • 2006
  • Work delay is the one of facts that make the reliability of construction business decrease. Building a causal classification system of work delay and deducing the managemental item for it gives a great competition to the construction industry. It is, however, so rare to study about work delay so far. Therefore, this research analyzed a questionnaire, which is focussing on the public apartment construction, to look into the causal root factors and deduce the work delay factors. Finally, we suggest a major managing point to remove effectively the work delay factors.

  • PDF

A new WDM/TDM protocol for very high speed optical networks (고속광통신망용 새로운 WDM/TDM 프로토콜)

  • 이상록;이성근;박진우
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.33A no.2
    • /
    • pp.50-58
    • /
    • 1996
  • This paper proposes the channel-access protocol suitable to a very high speed photonic WDM network with star configuration, which can provide a high channel utilization and insensitivity to the propagation delay. The proposed protocol employs a control channel and a simple status table to deal with the propagation delay which has been a major limiting factor in the performance of the very high speed optical communication networks. The control channel transmits control information in order to reserve access on data channels, and each node constitutes a status table after the reception of control pckets which holds information about the availbility of destination node and data channel. The proposed protocol is insensitive to the propagation delay time by removing necessity of the retransmission and by allowing parallel transmission of control packet and data packets. It is proved in analysis and discrete event simulation that the proposed protocol is superior in throughput and mean delay, especially at the high load conditions compared to the existing high speed channel-access protocols.

  • PDF

A Study on the Factors that Affect the On-Time Performances of Airline Companies (항공사 정시성에 영향을 주는 요인에 관한 연구)

  • Kwon, Bo-Hun;Jung, Jin-Young;Kim, Hyeon-Deok
    • Journal of Advanced Navigation Technology
    • /
    • v.25 no.5
    • /
    • pp.320-326
    • /
    • 2021
  • In airlines, on-time performance (OTP) is a measure of an airline's reliability and can be used as an important indicator when compared to other airlines. This study analyzed the effects and strength of delay factors on airline punctuality by analyzing the data of domestic K airlines for one year before and after March 2020, when the number of flights drastically decreased due to the corona virus. In addition, delays caused by seasonal weather effects were analyzed, and how the number of passengers who plummeted due to the corona situation had an effect on delay factors was studied. As for the delay factors, the delay codes of K airline which added its own codes to the delay codes of IATA, were applied. Based on the results of the analysis, we would like to suggest a method to minimize the delay.

Stability Analysis and Improvement of the Capacitor Current Active Damping of the LCL Filters in Grid-Connected Applications

  • Xu, Jinming;Xie, Shaojun;Zhang, Binfeng
    • Journal of Power Electronics
    • /
    • v.16 no.4
    • /
    • pp.1565-1577
    • /
    • 2016
  • For grid-connected LCL-filtered inverters, dual-loop current control with an inner-loop active damping (AD) based on capacitor current feedback is generally used for the sake of current quality. However, existing studies on capacitor current feedback AD with a control delay do not reveal the mathematical relation among the dual-loop stability, capacitor current feedback factor, delay time and LCL parameters. The robustness was not investigated through mathematical derivations. Thus, this paper aims to provide a systematic study of dual-loop current control in a digitally-controlled inverter. At first, the stable region of the inner-loop AD is derived. Then, the dual-loop stability and robustness are analyzed by mathematical derivations when the inner-loop AD is stable and unstable. Robust design principles for the inner-loop AD feedback factor and the outer-loop current controller are derived. Most importantly, ensuring the stability of the inner-loop AD is critical for achieving high robustness against a large grid impedance. Then, several improved approaches are proposed and synthesized. The limitations and benefits of all of the approaches are identified to help engineers apply capacitor current feedback AD in practice.

Total Delay for Treatment among Cancer Patients: a Theory-guided Survey in China

  • Feng, Rui;Wang, De-Bin;Chai, Jing;Cheng, Jing;Li, Hui-Ping
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.10
    • /
    • pp.4339-4347
    • /
    • 2014
  • Purpose: This study aimed at exploring treatment delay (TD) among cancer patients in China with an attempt to develop a practical methodology facilitating frontline Chinese clinicians in promoting earlier cancer diagnosis and treatment. Materials and Methods: The study comprised framework development, qualitative interviews and paired factor rating. Framework development utilized systematic literature review, soft systems thinking and consensus groups. Qualitative interviews employed a checklist of open questions soliciting information about all the domains included the framework from cancer patients drawn via stratified randomized sampling of inpatients at 10 hospitals in Hefei, China. Paired factor rating used a self-developed computer aid and the interviewed patients as referring cases to weigh the relative importance of the factors listed in the framework in terms of their contributions to specific components of total delay (TD). Results: a) A conceptual framework was proposed consisting of a 6-step path to TD and 36 category determinants. b) A total of 227 patients were interviewed; their TD was 267.3 mean or 108 median days ranging from 0 to 2475 days; average appraisal, illness, behavioral, preparation and treatment delay accounted for 52.1%, 9.4%, 0.30%, 8.8% and 29.4% of the TD respectively. Individual side factors were rated substantially more important than environmental side factors (60% vs. 40%); most influential TD factors included cancer symptoms, overall health, family relations and knowledge about cancer and health. Conclusions: The framework proposed together with the interviewing and rating approaches used provide a potential new methodology for understanding cancer patients' TD and promoting earlier cancer treatment.

An Experimental Delay Analysis Based on M/G/1-Vacation Queues for Local Audio/Video Streams

  • Kim, Doo-Hyun;Lee, Kyung-Hee;Kung, Sang-Hwan;Kim, Jin-Hyung
    • ETRI Journal
    • /
    • v.19 no.4
    • /
    • pp.344-362
    • /
    • 1997
  • The delay which is one of the quality of service parameters is considered to be a crucial factor for the effective usage of real-time audio and video streams in interactive multimedia collaborations. Among the various causes of the delay, we focus in this paper on the local delay concerned with the schemes which handle continuous inflow of encoded data from constant or variable bit-rate audio and video encoders. We introduce two kinds of implementation approaches, pull model and push model. While the pull model periodically pumps out the incoming data from the system buffer, the push model receives events from the device drivers. From our experiments based on Windows NT 3.51, it is shown that the push model outperforms the other for both constant and variable bit-rate streams in terms of the local delay, when the system suffers reasonable loads. We interpret this experimental data with M/G/1 multiple vacation queuing theories, and show that it is consistent with the queuing theoretic interpretations.

  • PDF

Study on Determining Appropriate Turnaround Time to Improve Aircraft Delay (항공기 지연 개선을 위한 적정 수준의 Turnaround Time 도출 연구)

  • JaeWoo Park;HyunSoo Cho;SungKwan Ku
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.32 no.3
    • /
    • pp.205-214
    • /
    • 2024
  • The aircraft delay rate has increased nearly three times in 2023 due to change in Korea policy of delay criteria. One of the primary causes of delays in domestic flights is related to reactionary delays, with Turnaround Time being a key factor. To mitigate reactionary delays and reduce aircraft delays, it is essential to establish an appropriate Turnaround Time and integrate it into flight schedules. This study aims to analyze the appropriate Turnaround Time for aircraft operating at Gimpo, Gimhae, and Jeju International Airports, which handle a high frequency of domestic flights. The research applies air traffic simulation, using variables such as current flight schedules, actual flight times, Turnaround Time, and flight routes to simulate actual conditions. Based on this analysis, the study seeks to identify the fitting Turnaround Time across various scenarios. The findings are expected to address reactionary delays and help reduce overall delay rates in domestic flights.

A Methodology for Analyzing on the Correlation of Factors Affecting the Acquisition of Military Weapons Systems : Focused on Factor Analysis of Naval Ship Acquisition Delay Cases (국방무기체계 획득영향요인 상호관계 분석 : 함정획득지연 사례 및 요인 분석을 중심으로)

  • Hwang, Jeong-Oh;Oh, Hyun-Seung;Choi, Bong-Wan;Yim, Dong-Soon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.48-58
    • /
    • 2020
  • Naval weapons systems of the Republic of Korea are acquired through the Defense Planning Management System. Recently, acquisition of some naval ships have been delayed, and the causes of the delays have been recognized as inappropriate project management at the Execution Phase. However, we argue that the delay problem in naval ships acquisition should be approached, with due regard for the entire Defense Planning Management System. That is, We should try to investigate from Planning Phase to those of Programming, Budgeting and Execution Phases. Therefore, in this study, we investigated the actual cases of the delay in naval acquisition at all phases of the Defense Planning Management System. Based on the investigation, we tried to identify the naval ship Acquisition Delay Factors and find out the Weights of those factors. As the next step, we calculated the Influence Measures on the naval missions, including the Cost of Naval Capability Gap derived from the delays in acquisition of naval ships. As a final step, we calculated the Acquisition Delay Measures based on the interrelationship between the Acquisition Delay Factors and the Influence Measures. Then we evaluated and analyzed what the results stand for. Finally, we made suggestions for future improvement. The improvement suggestions we made for preventing delay in acquisition of naval ships in this study are as follows. First, we need a shift in perception. It is necessary to measure the Acquisition Delay Factors in acquiring naval ships and manage them from the Planning Phase. Second, resolution must be concerted efforts. All relevant agencies, not just a few, should work together to resolve the problems of acquisition delay. Third, analysis must be based on the accumulation of data. This allows the elaborating of naval ship Acquisition Delay Factors and Delay Measures. If this research method is applied to other military weapons systems in the future, we may be able to not just identify the Acquisition Delay Factors in acquisition of other military weapons systems, but also pursue improvement in those cases.