• Title/Summary/Keyword: Delay Factor Analysis

Search Result 180, Processing Time 0.023 seconds

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

Causes of Construction Delays of Apartment Construction Projects: Comparative Analysis between Vietnam and Korea

  • Kim, Young-Mok;Kim, Soo-Yong;Luu, Truong-Van
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.214-226
    • /
    • 2008
  • Construction delay caused considerable losses to project parties. Avoiding construction delays is important to save costs for project stakeholders. The main objective of this paper is to identify major causes of construction delays of apartment construction projects in Vietnam. Sixteen causes of delay were identified through a questionnaire survey of 166 professionals. Factor analysis was employed to categorize these causes. The results of the survey revealed the main causes of delay of apartment projects in Vietnam are: (1) owner's and contractor'S financial difficulties; (2) lack of experienced contractors; (3) late delivery of materials; (4) late construction site handover; (5) owner's late payments for completed works; (6) low bid prices; (7) inappropriate construction method; and (8) defective works and unnecessary reworks. Factor analysis uncovered that causes of delay can be grouped under five categories labeled the five INs: incompetence, ineffectiveness, inadequateness, inapplicableness and inconceivableness. Comparative analysis between the Vietnam construction industry (VCI) and the Korea construction industry (KCI) has been performed to infer valuable lessons for researchers and practitioners in the VCI and the KCI. Comparative analysis indicated that main causes of delay in the VCI somewhat differ from main causes of delay in the KCI. However, "contractor'S financial difficulties", "late construction site handover", "unnecessary rework", "incapable designers", "site clearance difficulties" are common causes of delay in the VCI as well as the KCI. The findings of this research can be used as a guideline to overcome problems in the VCI as well as in other construction industries. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in Korea.

A Large-Signal Analysis of a Ring Oscillator with Feed-Forward and Negative Skewed Delay (부 스큐 지연 방식과 피드포워드 방식을 사용한 링 발진기의 대신호 해석)

  • Lee, Jeong-Kwang;Yi, Soon-Jai;Jeong, Hang-Geun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.7
    • /
    • pp.1332-1339
    • /
    • 2010
  • This paper presents a large signal analysis of ring-type oscillators with feed forward and negative skewed delay scheme. The analysis yields the frequency increase factor due to two schemes. The large signal analysis is needed, because small signal model is limited to the initial stage of oscillation[1]. For verification of the frequency increase factor, simulation were done under the same conditions for the two different types of ring oscillators, i.e., with and without feed forward and negative skewed delay scheme. Simulation results are in good agreement with predictions based on analysis.

The Estimation of Road Delay Factor using Urban Network Map and Real-Time Traffic Information (도로망도와 실시간 교통정보를 이용한 도로 지연계수 산정)

  • Jeon, Jeongbae;Kim, Solhee;Kwon, Sungmoon
    • Journal of Cadastre & Land InformatiX
    • /
    • v.51 no.1
    • /
    • pp.97-110
    • /
    • 2021
  • This study estimated the delay factor, which is the ratio of travel time at the speed limit and travel time at the actual speed using real-time traffic information in Seoul. The actual travel speed on the road was lower than the maximum speed of the road and the travel speed was the slowest during the rush hour. As a result of accessibility analysis based on travel speed during the rush hour, the travel time at the actual speed was 37.49 minutes on average. However, the travel time at the speed limit was 15.70 minutes on average. This result indicated that the travel time at the actual speed is 2.4 times longer than that at the speed limit. In addition, this study proposedly defined the delay factor as the ratio of accessibility by the speed limit and accessibility to actual travel speed. As a result of delay factor analysis, the delay factor of Seoul was 2.44. The results by the administrative district showed that the delay factor in the north part areas of the Han River is higher than her south part areas. Analysis results after applying the relationship between road density and traffic volume showed that as the traffic volume with road density increased, the delay factor decreased. These results indicated that it could not be said that heavy traffic caused longer travel time. Therefore, follow-up research is needed based on more detailed information such as road system shape, road width, and signal system for finding the exact cause of increased travel time.

A Study on the Consumer's Purchasing Motives toward Casual Hanbok - in the areas of Pusan - (생활한복의 구매동기에 관한 연구 -부산지역을 중심으로-)

  • 최은경
    • Journal of the Korean Society of Costume
    • /
    • v.45
    • /
    • pp.71-84
    • /
    • 1999
  • This study was to identify the dimensions of consumer's purchasing motives and purchasing delay reasons toward casual hanbok. Other objective was to examine relationship between these variables and future purchasing intention. Th 22 purchasing motive questions and 19 purchasing delay reasons were selected through the result of self-questionnaire analysis. 302 purchaser and 297 consumers who delay for particular reasons in Pusan responsed to the second questionnaire of purchasing motives and purchasing delay reasons toward casual Hanbok. The results as follows: 1. For factor analysis 22 purchasing motive questions were subjected to the principle component analysis with orthogonal rotation after extraction of 6 major factors. Six dimensions are consciousness of nation goodness of design conformity with fashion charming apperance relaxation fo body and mind nation goodness of design conformity with fashion charming appearance relaxation of body and mind and pursuit of individuality. These factors explained 62.0% of total variables. 2. Consumer's purchasing motives such as consciousness of nation goodness of design charming appearance and relaxation of body and mind has predicting power to the re-purchasing intention of casual hanbok 3. For factor analysis 19 delay reason question were subjected to the principle component analysis with orthogonal rotation after extraction of 5 major factors. Five dimensions are non-fitness for occasion and body shape unsatisfaction with design unsatisfaction with price need of information search for better product and preference for traditional hangok. These factors explained 60.4% of total variables. 4. Delay reasons of unsatisfaction with design and price were positively related to the future purchasing intention. This delay reason is caused by forces external to the consumer and the consumer has engaged in information search. This result explained this type of consumer has the strong future purchasing intention.

  • PDF

Delay Factor Analysis and Process Enhancement System Development Focusing on Masonry Work (조적공사에서의 작업 지연 요소 도출 및 개선 시스템 제안)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.119-120
    • /
    • 2015
  • Appropriate management of the finish works in construction project is one of most important activities that must be conducted considering the total duration of the project. Masonry work is a fundamental process that is performed in the preliminary steps of finish works. However, it has been investigated that the analysis of delay factors affecting masonry work has been neglected in the domestic construction site. Therefore, this study deducts delay factors affecting masonry work by literature review and survey on site engineers and labors. This study has been conducted as a preliminary step of developing a construction project interference management system which is expected to suggest objective information for the decision making in construction sites.

  • PDF

A study of the factors affecting delay in apartment projects in Vietnam

  • Luu, Truong-Van;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.718-721
    • /
    • 2007
  • Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.

  • PDF

Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction (공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측)

  • Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

Performance Analysis of Pseudolite Tropospheric Delay Models Using Radiosonde Meteorological Data

  • So, Hyoungmin;Park, Junpyo;Song, Kiwon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.2 no.1
    • /
    • pp.49-57
    • /
    • 2013
  • When pseudolite navigation system is applied to wide area, the tropospheric delay is the main error factor. In this study, we experimentally compared and analyzed the performance of the conventional pseudolite tropospheric delay models. The integration method using radiosonde meteorological data was suggested to derive the reference value for the comparison and analysis. Flight tests were carried out to analyze the performance of the tropospheric delay models according to the elevation angle and distance conditions between the user receiver and the pseudolite. As the results of this study, we provided the basis for the choice of tropospheric delay model appropriate to the relative location characteristics of the pseudolite and the user.