• Title/Summary/Keyword: Defense R&D projects

Search Result 38, Processing Time 0.024 seconds

Analyzing the Efficiency of Defense Basic Research Projects using DEA (자료포락분석(DEA)을 활용한 국방 기초연구개발 사업의 효율성 분석)

  • Lim, Yong-Hwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.517-524
    • /
    • 2020
  • In line with the recent wave of the 4th Industrial Revolution, the environment for defense R&D is transforming into a center of high-tech military technology. In particular, developed countries are strengthening control of technology exports and technology transfer to protect advanced defense science and technology. For this reason, the budget demand for securing the ability to develop independently high-tech weapons and core technologies suitable for the future battlefield environment is increasing, and increasing efficiency in R&D investment has been highlighted for efficient distribution of limited budgets. This study examined the efficiency of the defense basic R&D project using the non-parametric approach, DEA. The R&D budget, R&D researcher, and R&D period were selected as the input variables, and the number of papers and patents were used as output variables. The efficiency of basic R&D projects was analyzed through CCR, BCC models, and SE. Lastly, based on the efficiency measurements, the cause of the inefficiency of R&D projects was suggested, and ways to improve efficiency were suggested. This study is expected to be used as useful information that can be applied to project performance management through efficiency analysis of basic defense R&D projects and be reflected in the project planning stage through feedback.

Risk Management for R&D Projects in the Military Aircraft Systems (군용항공기 연구개발 사업의 리스크 관리)

  • Kim, Sung Hun;Lee, Hyun Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.76-84
    • /
    • 2021
  • Military aircraft R&D projects require large-scale investment in cost and time, and involve a complex coordination process in decision-making. The R&D project manager should determine the development management priorities as accurately as possible and focus on R&D capabilities, thereby reducing the risks of the aircraft R&D project. To this end, this study aims to reduce R&D risk by prioritizing cost, schedule, and performance, which are basic management factors used in R&D project management in defense project management regulations. Analytic Hierarchy Process (AHP) is applied using a questionnaire for managers in charge of aviation R&D under the Defense Acquisition Program Administration. As a primary result, the importance of the factors that the aircraft R&D project manager should consider was derived in the order of performance, cost, and schedule, and the priorities of performance and cost in the lower layer were also identified. In addition, in order to provide practical risk management measures to aircraft R&D project managers, the results of analyzing 28 cases of US National Transportation Safety Board accidents were compared and analyzed with the AHP analysis results, and management measures suitable for the situation were specified.

An Analysis of the Applicability of Technical Risk Index in the Weapons System Research & Development Projects (무기체계 연구개발사업에서 기술적 위험지표 적용 가능성 분석)

  • Lee, Sunhun;Kim, Minjun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.6
    • /
    • pp.835-843
    • /
    • 2017
  • The Technology Readiness Assessment(TRA) has the advantage of identifying immature technologies in promoting weapon system research and development project. However, a more diverse set of information is required for the determination of phase shift and technical risk management for weapons system R&D projects. In this paper, we investigate the various indexes the various indexes proposed to overcome the limitations of the Technology Readiness Level(TRL) and analyze the possibility of applying to the actual weapons system R&D projects. Based on the analysis, it was possible to provide additional information that could not be presented in TRA using technical risk indexes other than TRL, confirming that it could be used for technical risk management for weapons system R&D projects.

The Development of Evaluation Indicators for the Performance of Defense Core-Technology R&D Projects Using SMR/AHP (SMR/AHP 기법을 활용한 국방핵심기술 연구개발사업 성과평가지표 개발)

  • Lee, Hyung-Jun;Kim, Chan-Soo;Kim, Woo-Je
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.12 no.1
    • /
    • pp.70-79
    • /
    • 2009
  • Currently, the investment on Research and Development(R&D) for defense core technology is continuously increasing to maintain advanced country's R&D level. In accordance with this trend, the national defense R&D investment management system is being more strengthening, and importance of performance evaluation is being emphasized more and more. However, the existing indicators of performance evaluation for defense core technology R&D is limited in efficient management because of the qualitative evaluation items and subjective allocation of points. In this paper, we developed a novel indicator for defense core technology R&D performance evaluation through domestic and foreign related literature and inquiry, brainstorming, and analysis techniques by Stepwise Multiple linear Regression(SMR) and Analytic Hierarchy Process(AHP). And we verified effectiveness of proposed indicators of performance evaluation by comparing with the existing evaluation indicators. Our proposed indicators for performance evaluation will create superiority performance on defense R&D fields.

A study on a schedule-cost analysis model for defense R&D project planning (국방 R&D프로젝트의 일정-비용분석모델의 연구)

  • 황홍석;류정철;정덕길
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.213-216
    • /
    • 1996
  • R'||'&'||'D project management is a process of decisions concerned with the achievement of goals of objectives. Especially, defense R'||'&'||'D project planning is the key in the successfull management of defense development. The defense project managers are constantly having to perform "what if\ulcorner" exercise, such as what if the project is extended out for an additional cost\ulcorner In this reserch, we developed a schedule-cost analysis model based upon Critical Path Method(CPM) and Venture Evaluation and Review Technique(VERT) for schedule-cost trade off analysis defense R'||'&'||'D projects. In the first step, a deterministic model is developed as a heuristic which deterministic model is developed as a heuristic which determines the schedule extension and reduction cost as a function desired schedule. In the second step, a stochastic network simulation model is developed to analyse the project risk (sucess and failure). The expected time and cost can be determined for desired schedule under the assumptions of stochastic arc data (time and cost) with a various precedence relationships. This model provides the defense R'||'&'||'D managers with an estimated and expected cost for curtailing or extending a project a given amount of time. The effectiveness and efficiency of the proposed methods, a heuristic and stochastic networks simulations, have been demonstrated through examples.

  • PDF

Research on Improving Schedule Forecasting Method for Delayed Defense Research & Development Project (지연된 국방 연구개발 프로젝트의 일정 예측방식 개선 연구)

  • Cho, Jungho;Lim, Jaesung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.3
    • /
    • pp.286-293
    • /
    • 2020
  • Since Dr. Lipke announces earned schedule management(ESM) in 2002, it has been used in project management to make up for the insufficient schedule management function of earned value management technique. However, it is difficult to accurately forecast the schedule of delayed defense research and development(R&D) projects with the ESM technique. Therefore, this paper proposes a new schedule forecasting method considering the progress of delayed work in ESM technique. This concept can also be adopted to the traditional project progress management (PPM) technique. We verify the effectiveness of the proposed concept through several defense R&D projects and prove that it is possible to supplement the schedule forecasting of the ESM and PPM technique.

A Study on the Effective Implementation Methodology of Evolutionary Development in Defence Weapon System Research & Development Project (국방 무기체계 연구개발 사업에서 진화적 개발의 실효적 수행 방안에 관한 연구)

  • Kim, Jung Myong;Cha, Seung Hoon;Lee, Hye Jin;Yoo, Jae Sang;Choi, Sang Wook
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.1
    • /
    • pp.35-42
    • /
    • 2021
  • Recent defense R&D projects have been required as weapons systems applied with advanced technology considering exports. As a result, the complexity of the applied technology increases, and the risk of system development increases. Under these circumstances, an effectives method of performing evolutionary development for economical and timely deployment is presented. To this end, we hope that this study, which proposed the maintenance of related laws and measures for realistic and active evolutionary development, will help the R&D of the weapons systems.

The Process of R&B Project-Priority Ordering in Defense Technology (국방과학기술 연구개발 우선순위설정에 관한 연구)

  • Lee Jeong-Dong;Lee Choon-Joo;Jang Won-Joon;Park Hong-Suk
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.122-132
    • /
    • 2004
  • The aim of this paper is to show the process of R&D Project-Priority Ordering in the Defense Technology field. We propose specific methods (Delphi, Analytic Hierarchy Process (AHP), Scoring) to order the R&D Project-Priority. In general, to decide the priority of R&D projects most of researches depend on questionnaires which are surveyed by experts. However, it is criticized that this process cannot reflect the limitation of experience and knowledge of experts. In this process, we separate evaluators in two parts: the first is strategic experts, the second is technical experts. Evaluators can choose and evaluate the alternatives which they are familiar with, so we can obtain reliable results. Finally, based on our process of the R&D Project-Priority Ordering we formulate policy implications for managing the defense technology.

A Study on Calibration of PRICE Model Using Historical Cost Data (실적자료를 활용한 PRICE 모델의 보정방안 연구)

  • Jung, Tae-Kyun;Lee, Yong-Bok;Kang, Sung-Jin
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.1
    • /
    • pp.29-38
    • /
    • 2010
  • In Korea weapon system acquisition processes, it's required a cost estimation report obtained from a commercial cost model. The PRICE model is generally used as a cost estimation model in Korea. However, the model uses American historical R&D data and it's output cost component is different from our cost component of defense accounting system. Also, we found that estimating results show about 10% of difference when we comparing with actual costs in 44 finished weapon acquisition projects. There are some limitations in calibration to increase an accuracy of the PRICE model because it's difficult obtain good real input data, detailed cost and technical data in low level WBS. So, only 8% of the defense R&D projects are calibrated and validation of calibration results is more difficult. Therefore, we studied the standard calibration process and performed the calibration about the MCPLXS/E parameters of the PRICE model based on actual cost data. In order to obtain a good calculation result, we collected the actual material costs from the defense industry companies. Our results can be used for an reference in similar weapon system R&D and production cost estimation cases.

A Study on the Improvement of the Criteria for Calculating Compensation of Deferment of Defense Acquisition Projects (무기체계 연구개발시 지체상금 개선방안에 관한 연구)

  • Kim, SeongHo;Ryoo, YeonUk;Chun, SamHyun
    • Convergence Security Journal
    • /
    • v.17 no.4
    • /
    • pp.31-37
    • /
    • 2017
  • This study compares the main features of the Act of National Contract with the Act of Defense Aquisition Program, which is the only one in Korea for long-term contracts. When applying the progress payments system to the defense R&D project, We can prevent disputes between parties and create a stable development environment through smooth partnerships. Smaller, direct and indirect losses can be alleviated, such as the waste of administrative power required to deal with disputes due to the payment of delayed prizes and restrictions on business activities due to the difficulty of forecasting the results of companies. In large measure, we will be able to procure a high-quality weapon system in a timely manner to support the security of the nation as well as international competitiveness through the growth of our defense industry.