• Title/Summary/Keyword: Defense Acquisition Program

Search Result 164, Processing Time 0.041 seconds

SE Case Study in Eagle Acquisition Program (독수리구매사업 시스템엔지니어링 적용사례)

  • Lee, Hi-Jang;Lee, Dong-Seok;Ham, Hyuck-Sang;Rho, Kyun-Hyup;Kwon, Young-Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.9-16
    • /
    • 2007
  • To Manage the Defense Acquisition Process more efficiently, DAPA has looked over the applying SE process to the Eagle Acquisition Program. Based on comparing 'Requirement' with 'items suggested in the proposal' in RFP and analyzing the result by using Cradle, those items have been discovered with IPT, actualized and corrected. In addition, the computerized data base system makes easier to trace all changed and more efficiency to manage programs. Therefore, this study using SE in other acquisition program.

  • PDF

The Directions and Indicators Derivation for the Efficiency of Naval Ship Acquisition Programs' Performance Evaluation (효과적인 함정사업 성과평가를 위한 발전방향 및 성과평가 지표 도출)

  • Guck Cheol Bang;Sung Chul Shin;Joong Yoon Lee;Peom Park
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.2
    • /
    • pp.117-125
    • /
    • 2023
  • Systematic performance evaluation of the Defense Acquisition Program is very important, since they are directly related to national security. In this paper, we reviewed various performance evaluation models from a methodological perspective for pragmatic performance evaluation, and the limitations of each model. In order to evaluate the performance of the Defense acquisition program efficiently, especially for the Naval ship Projects and considering their unique characteristics, both various stakeholders' participation, standard indicators for performance measurement, and tailoring them considering the projects' circumstances are necessary. We also propose indicators, contents, and detailed criteria example for the Requirements management. This approach enables a pragmatic and consistent evaluation of defense projects, and through this, meaningful insights could be acquired with accumulate data.

Systems Engineering Application of Imaginary WIG(Wing-In-Ground Effect) Ship Acquisition Project (가상 함정획득사업의 Systems Engineering 적용 (INCOSE SE Handbook ver. 3.1 중심으로))

  • Lee, Su Oek;Shin, Seung Chun;Choi, Nag Jun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.5 no.1
    • /
    • pp.57-65
    • /
    • 2009
  • The purpose of Defense Acquisition Project is that the superior weapons validated needs and performance are supplied to military user with limited financial resources and time. The Warship Acquisition Project is not only like this, But also has special characteristics of long project period and first-constructed ship's operation employment. So, The Warship Acquisition Project need systematic and efficient procedure & management. And this paper researches System engineering application of imaginary WIG(Wing-In-Ground Effect) ship acquisition project based Systems Engineering Handbook ver.3.1 published by INCOSE, the lead of field. The Imaginary WIG(Wing-In-Ground Effect) ship acquisition project applied the four processes(technical project, Enterprise & Agreement, Enabling Systems), the basis of INCOSE Engineering Handbook ver.3.1, and the each process output compared with DAPA(Defense Acquisition Program Administration)'s warship acquisition procedure.

  • PDF

A Study on the Factors to Activate the Defense Industry Export and Import Management System using Technology Acceptance Model (기술수용모델을 활용한 방산수출입관리체계 활성화 요인에 관한 연구)

  • Kim, Tae-Yeon;Gim, Gwang-Yong;Joe, Sung-Keun;Noh, Hyun-Il;Choi, Kyung-Hwan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.17 no.4
    • /
    • pp.492-500
    • /
    • 2014
  • The defense industry export of Korea has been steadily risen since 2006. It is attained $340million, the highest export amounts ever, in 2013. As the defense industry export increase, Defense Acquisition Program Administration (DAPA) built defense industry export and import management system to assist export and to protect defense technologies. In this paper, we study factors to activate the defense industry export and import management system using Technology Acceptance Model(TAM) in compulsive usage environment. The significance of this study is as follows: First, we prove the reliability and feasibility of measurement variables in defense industry of compulsive usage environment. Second, we suggest factors to activate the defense industry export and import management system. Third, we present methodology to find factors in computation systems of public institute using TAM.

A Study on the Application of PRICE Model in the Environment of Korean Defense Industry (한국 방산환경에서의 PRICE모델 적용방안 연구)

  • 김만재;최석철
    • Journal of the military operations research society of Korea
    • /
    • v.28 no.1
    • /
    • pp.67-82
    • /
    • 2002
  • In this paper, we consider a rule of application of PRICE(Parametric Review of Information for Costing and Evaluation) model to the environment of Korean defense industry. The PRICE model which is a computer model to estimate the cost of an acquisition program, was developed for the regulation of defense acquisition program in the United States. Therefore, it is essential for us to figure out how we can adopt it under our defense acquisition regulations. We will give an alternative method to apply the PRICE model to the mapping problem between two regulations.

A Standardization of Program Management Process based on BPM for Korea Defense Acquisition (BPM 기반 국방사업관리 프로세스 표준화)

  • Lee, Hee-Sung;Kim, Ho-Kyung;Park, Jin-Sub
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.84-87
    • /
    • 2008
  • 방위사업청은 방위력개선업무의 투명성, 효율성, 전문성을 제고하는 한편, 방산 경쟁력을 강화하기 위해 "통합사업관리정보체계" 구축 사업을 추진 중이다. 동 체계는 전사적개념으로 국방사업관리 전반에 BPM을 적용한 최초의 사례로서, 이의 적용을 통해 업무정보의 효율적인 공유, 신속한 업무처리, 효율적인 협업 및 의사소통이 기대된다. 본 논문에서는 "통합사업관리정보체계"에 BPM을 도입하는 과정을 소개하는 한편, 이를 통한 업무에 대한 면밀한 분석 및 통합, 업무 프로세스의 표준화 및 체계 구현 결과를 기술하고, 동 체계내 BPMS 구축과정에서 발생한 이론과 실제의 차이와 교훈, 발전방향을 도출한다.

  • PDF

A Study on the Critical Success Factors for the Efficient Management of Defense Acquisition Program (효율적인 무기체계 획득을 위한 사업 관리 핵심성공요인 연구)

  • Jeon, Nam-Hee;Kim, Byung-Sam;Kim, Dong-Ho;Gim, Gwang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.2
    • /
    • pp.53-69
    • /
    • 2010
  • The long-term purpose of Military Acquisition Program Management (MAPM) is to fulfill requested performance, budget, and timing of military capability building. The Defense Acquisition Program Administration was established in 2006 and it adopted Integrated Control System. Moreover, there have no much studies done to examine the condition of Defense Capability Improvement Project in Korea through an empirical research although there are sixty one organizations are operating currently under Defense Capability Improvement Project. The objective of this study is to recognize Military Acquisition Program Management as a single project and to critically review relationship between Critical Success Factors (CSF) and Military Acquisition Program Management. Accordingly, three determinants to lead to successful Military Acquisition Program Management are "Communication" "User Participation" and "User Requirement." This study also demonstrates that Critical Success Factors have distinctive influences on successful Military Acquisition Program Management based on characteristic, size and phase of project. In retrospect, it is meaningful that Integrated Project Team (IPT) could classify priority of management according to characteristic, size and phase of project in the course of implementation.

A Study on the Organization and Procedures for Acquiring Power Support System and the Development of Collaborative System (전력지원체계 획득조직 및 절차와 협업체계 발전방안 연구)

  • Kyojoon Choo;Myoungjin Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.304-311
    • /
    • 2023
  • The 4th Industrial Revolution and the continuous development of Science and Technology have also required a speedy business promotion method in the defense industry. Advanced countries including the United States are already boldly innovating the existing high-cost and long-term acquisition system with the highest priority in weapons development to cope with the military rise of Russia and China. The Ministry of National Defense and the Defense Acquisition Program Administration have also recently introduced a quick acquisition system and are applying it to business promotion. In addition, some small-scale projects and weapons systems are being reorganized so that they can be managed by the units demanding them. After an organizational diagnosis of the Project Acquisition Group by the Ministry of National Defense in 2020, it has been reassigned as a subordinate unit of the Army Logistics Command from a direct unit managed by the Army HQ. As a result, problems such as work conflict or redundancy have been identified. In addition, a system has been implemented to shorten the acquisition period by applying a rapid acquisition program in the field of weapons systems by benchmarking the rapid acquisition program of advanced countries. The force support system project process will also need to introduce such a quick acquisition system. In addition, the Ministry of National Defense is considering ways to delegate some weapon systems to each military, which will then carry out tasks ranging from requirements determination to project management. Accordingly, it is now time to expand the organization for the management of the Army's weapons system acquisition project. Therefore, in this paper, the Army Project Acquisition Group was analyzed on its organization, acquisition procedures, and cooperation systems, with presentations of development plans for each field.

A Systems Engineering Case Study to Improve Defence R&D Program Effectiveness (국방 R&D사업 시스템엔지니어링 적용사례 및 발전방안 연구 - 저고도레이더 업체주관 연구개발사업 사례 중심으로 -)

  • Park, Kyeong-Il;Pyun, Wan-Joo;Park, Young-Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.35-43
    • /
    • 2008
  • Application of system engineering should be realized on necessary condition being to propel National Defense R&D Program. But, these necessity is yet not realized easily to many project managers of Defense Acquisition Program Administration(DAPA). As one person of DAPA project manager, system engineering hard to approaches easily by the word itself. There are a lot of difficult sections where should apply how. This paper established DAPA Project Manager and Acquisition Point of Contact of demand Military by main customer (reader), and wished to make understood more easily and approach system engineering application to these. Also, this paper studied project management example that scientific project management techniques of Earned Value Management(EVM) and Cost As an Independent Variable(CAIV) etc. is taken abuzz in DAPA inside by Project management technique that become reform, arc Integrated in system engineering.

  • PDF

A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program (수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구)

  • Byun, Hyung Kyun;Lee, Sang Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.51-62
    • /
    • 2012
  • The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.