DOI QR코드

DOI QR Code

The Directions and Indicators Derivation for the Efficiency of Naval Ship Acquisition Programs' Performance Evaluation

효과적인 함정사업 성과평가를 위한 발전방향 및 성과평가 지표 도출

  • 방극철 (방위사업청 함정사업부) ;
  • 신승철 (방위사업청 함정사업부) ;
  • 이중윤 (아주대학교 시스템공학과) ;
  • 박범 (아주대학교 시스템공학과)
  • Received : 2023.11.08
  • Accepted : 2023.12.21
  • Published : 2023.12.31

Abstract

Systematic performance evaluation of the Defense Acquisition Program is very important, since they are directly related to national security. In this paper, we reviewed various performance evaluation models from a methodological perspective for pragmatic performance evaluation, and the limitations of each model. In order to evaluate the performance of the Defense acquisition program efficiently, especially for the Naval ship Projects and considering their unique characteristics, both various stakeholders' participation, standard indicators for performance measurement, and tailoring them considering the projects' circumstances are necessary. We also propose indicators, contents, and detailed criteria example for the Requirements management. This approach enables a pragmatic and consistent evaluation of defense projects, and through this, meaningful insights could be acquired with accumulate data.

Keywords

References

  1. 방위사업청, 23-27 방위산업발전기본계획, p17. 2023.
  2. 김현기, 무기구입 및 관리의 투명성 제고방안, 자유기업원칼럼, No.052, 2002.
  3. 방위사업청 예규 제755호, 방위사업청 무기체계연구개발의 투자주체 선정 등에 관한 지침, 2021.
  4. 방위사업청. 함정사업 업무편람, pp. 14-15, 2014.
  5. 대한민국 법률 제19476호, 방위사업법, 2023.
  6. 국방부 훈령 제2845호, 국방전력발전업무훈령, 2023.
  7. 방위사업청, 비용분석 교안(방위사업분석과 작성), pp. 14-19, 2021.
  8. Rebekah Peterman, Understanding Task Dependency Types in Project Management, 2022.
  9. Stephen Devaux, Network Pratice Exercise 1: Computing Critical Path Drag, Drag Cost, EMV and the DIPP, 2020.
  10. Marija Kojic, Time Estimation in Project Management Guide, 2023.3.23.
  11. Rahmat Llham Zazzali, Application Earned Value Management to Measure the Progress of Forecast, 2021.
  12. Syoso Yamato, Quantitative Project assessment using the AHP Absolute Measurement Method, 일본 프로젝트 매니지먼트 학회, 2008년도 추계연구발표논문집 pp. 314-326. 2008.
  13. What is a Balanced Scorecard, www.intrafocus.com(Available on 26 Nov 2023)
  14. Eileen O'Loughlin, Project Success Metrics: Keeping Projects on Time & on Budget, 2018.
  15. Md.Asadur Rahman, Four-Class Motor Imagery EEG Signal Classification using PCA. Wavelet and Two-Stage Neural Network, International Jounal of Advanced Computer Science and Applications, Vol.10(5), 2019.
  16. International Standard, ISO/IEC/IEEE 15288(Systems and software engineering-System life cycle processes), 2023.
  17. CMMI Product Team, CMMI for Development, Version1.3, CMU/SEI, 2010.
  18. Project Management Institude, PMBOK® Guide 7th Edition, 2021.