The 2th International Conference on Construction Engineering and Project Management
/
pp.69-78
/
2007
In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.
최근 대내외적인 건설환경의 급격한 변화와 건설공사의 대형화${\cdot}$복잡화 추세는 내외부적으로 많은 리스크 요인을 증대시키고 있기 때문에, 이에 대한 합리적이고 효율적인 관리방안의 중요성이 크게 대두되고 있다. 본 연구에서는 이러한 리스크 관리방안의 하나로서, 사업추진과정에서의 공사비 증액이 매우 제한되어 있어 입찰단계에서 견적금액의 불확실성 요소(예비비)를 고려해야만 하는 턴키공사 등 대형 건설공사를 대상으로, 이에 내재된 리스크요인의 정량화를 통해 합리적이고 적절한 예비비를 산정할 수 있는 모델을 제시하고자 한다. 예비비 산정모델의 개발을 위하여 실제 수행된 프로젝트를 선정하여 각 공사의 예비비 집행현황, 공사비 현황 등의 자료를 토대로 공사비에 영향을 미치는 인자를 도출하였으며, 몬테칼로 시뮬레이션(Monte Carlo Simulation)과 영향도(Influence Diagram), 의사결정 수형도(Decision Tree)를 혼합한 CRM(Cost Risk Model)을 적용하여 이러한 리스크 인자의 영향을 구조화하였다. 또한 구축된 모델을 기 완료된 대형공사에 적용하여 그 타당성을 검증하고자 하였다.
상수도 관망시설에서 각 관로는 시간이 경과함에 따라 각종 부식이 일어나 통수능이 저하된다. 그러므로 적절한 시기에 갱생이나 교체 등의 처리를 해주어야 한다. 본는 연구에서는 각 수요절점에서 요구수량, 요구압력 등 수리학적 조건을 만족시켜주며 동시에 최소의 비용으로 노구된 관로를 처리해주는 의사결정모형을 개발하였다. 교체비용, 관파열보수비용, 양수비용, 관 파열율, 연이율 등은 각 관로의 교체시기를 경제적으로 결정하는데 이용된다. 그리고 배수시설의 수리학적 만족여부는 관망계산 프로그램 KYPIPE에 의해 점검된다. 시스템이 수리학적 조건을 만족지 못할 경우 교체시기는 조건이 만족될 때까지 앞당겨진다. 본 모형은 기존 송배수시설인 수도권 광역상수도 제1단계에 적용되었다. 모형을 이용해 산출한 최적교체시키는 수리학적으로 모의해본 결과 문제가 없으며를 알 수 있었다.
Data Warehouses integrate data from multiple heterogeneous information sources and transform them into a multidimensional representation for decision support applications. Data warehousing has emerged as one of the most powerful tools in delivering information to users. Most previous researches have focused on marketing, customer service, financing, and insurance industry. Further, relatively less research has been done on data warehouse systems in the complex manufacturing industry such as ship production, which is characterized complex product structures and production processes. In the ship production, data warehouse systems is a requisite for effective cost analysis because collecting and analysis of diverse and large of cost-related(material/production cost, productivity) data in its operational systems, was becoming increasingly cumbersome and time consuming. This paper proposes architecture of the data warehouse systems to support cost analysis in the ship production. Also, in order to illustrate the usefulness of the proposed architecture, the prototype system is designed and implemented with the object of the enterprise of producing a large-scale ship.
90년대에 들어서 국내에서는 많은 지리정보 사업이 실행되고 있다. 바로 이 시점이 지리정보 사업의 여러 가지 기술개발과 적용, 지리정보 사업의 공공 정책적 접근방법 및 연구가 필요한 시점이라고 본다. 본 연구는 공공기관에서 시행되는 지리정보 사업에 대한 정책적 중요성을 검토하고 정책 분석적 측면에서 사업은 어떻게 평가되어야 하며, 어떤 내용들이 어떠한 절차와 단계를 거쳐 검토되어야 하는가를 연구한 것이다. 이러한 정가와 분석을 위해서 '비용편익 분석'을 하나의 분석방법으로 제시하면서, 이 방법이 지리정보 사업을 평가하는데 어떠한 장정과 단점을 갖는지를 연구했다. 주요 이점은 자료 분석의 용이, 지도 출력 및 수정 변경의 비용 절감 등이 유형의 이점으로 볼 수 있는 반면, 저리정보의 질적 향상과 보다 정확한 지리정보의 관리 및 운영, 의사결정지원 등이 무형의 이점으로 나타났다. 그러나 이러한 이점들은 지리정보 사업 시행 이전의 비용편익 분석에서 효과적으로 분석될 수 있는 부문이 있는 반면, 무형의 이점들은 여전히 비용 편익 개념에서 제대로 파악될 수 없는 경우가 있다. 이러한 문제점들은 향후 연구 과제로써 일반적인 계량적 평가 방법과 아울러 질적인 무형의 이점까지도 평가할 수 있는 다양한 분석 방법 및 평가 수단의 계속적인 연구가 필요하다.
Objectives This study is conducted to estimate the cost paid by the public suffering from disease possibly caused by chemical and to examine the effect on public health. Methods Cost-benefit analysis is an important factor in analysis and decision-making and is an important policy decision tool in many countries. Cost-of-illness (COI), a kind of scale-based analysis method, estimates the potential value lost as a result of illness as a monetary unit and calculates the cost in terms of direct, indirect and psychological costs. This study estimates direct medical costs, transportation fees for hospitalization and outpatient treatment, and nursing fees through a number of patients suffering from disease caused by chemicals in order to analyze COI, taking into account the cost of productivity loss as an indirect cost. Results The total yearly cost of the diseases studied in 2012 is calculated as 77 million Korean won (KRW) per person. The direct and indirect costs being 52 million KRW and 23 million KRW, respectively. Within the total cost of illness, mental and behavioral disability costs amounted to 16 million KRW, relevant blood immunological parameters costs were 7.4 million KRW, and disease of the nervous system costs were 6.7 million KRW. Conclusions This study reports on a survey conducted by experts regarding diseases possibly caused by chemicals and estimates the cost for the general public. The results can be used to formulate a basic report for a social-economic evaluation of the permitted use of chemicals and limits of usage.
It is well-known that the decision rule in the mini-mum mean-squares-error decision feedback equalizer(MMSE-DFE) is biased, and therefore suboptimum with respect to error probability. We present a new family of algorithms that solve the bias problem in the adaptive DFE. A novel constraint, called the constant-norm con-straint, is introduced unifying the quadratic constraint and the monic one. A new cost function based on the constant-norm constraint and Lagrange multiplier is defined. Minimizing the cost function gives birth to a new family of unbiased adaptive DFE. The simula-tion results demonstrate that the proposed method in-deed produce unbiased solution in the presence of noise while keeping very simple both in computation and im-plementation.
Enterprises and governments currently utilize COTS based information systems which are a kind of component based systems. Especially, COTS are widely utilized as information security systems and information systems including information security functions. This paper suggests an appropriate adaptation level of security functional components and a cost effective priority among them. To make a cost effective decision on adapting security functional components, this paper develops a hierarchical model of information security technologies and analyzes findings through multiple decision-making criteria.
Recently much research efforts have focused on how to manage carbon emissions in logistics operations. This paper formulates a model to determine an optimal shipment size with aims to minimize the total cost consisting not only of inventory and transportation costs but also cost for carbon emissions. Unlike the literature assuming carbon emission factors as a given condition, we consider the emission factors as decision variables. It is allowed to make an investment in improving carbon emission factors. The optimal investment decision is shown to be of a threshold type with respect to unit investment costs. Moreover, the findings in this work provide insights on the various elements of the investment decision and their impacts.
This paper analyzes how IT adoption affects differently on the shippers' make-buy decision, depending on the changes through agency and coordination problems. Empirical findings are consistent with the theoretical predictions on the changes of shippers' decision, summarized as follows. First, while the adoption of agency-cost reducing IT leads to the increase in the proportion of private fleets, the adoption of coordination-cost reducing IT leads to the increase in proportion of for-hire carriage. Second, the extent of private fleets changes depends on the primary product type that trucks load, with products of important service task experiencing more increase. Third, the extent of for-hire carriage changes depends on the truck's trip distance, with long-trip trucks experiencing more increase. With the results, we present different policy implications from the conventionally advocated ones.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.