• Title/Summary/Keyword: Debris reduction

Search Result 76, Processing Time 0.025 seconds

A Study on the Comparison and Analysis of Debris Reduction System on Small Bridge (소교량 유송잡물 저감시설의 비교 분석 연구)

  • Kim, Sung-Joong;Jung, Do-Joon;Kang, Joon-Gu;Yeo, Hong-Koo;Kim, Jong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.3
    • /
    • pp.31-41
    • /
    • 2016
  • Damage to structures, such as bridge piers, are increasing rapidly due to the debris moving along rivers at the time of flooding. Therefore, the debris fin, debris deflector and debris sweeper, which are debris reduction systems, were produced in this study and an accumulation experiment was carried out on the experimental channel according to the existence of the reduction system. The debris fin is the reduction system that creates parallel flow on debris accumulated on the bridge to pass through the bridge, which was produced using wood. In addition, the debris deflector was produced using steel pipes and it has the type of detouring the direction of debris. The debris sweeper passes the debris using the magnetic force rotation of a screw-shaped cylindrical structure by water flow and it was produced using acrylic material. The experiment was carried out by analyzing the level of accumulation according to the hardness and dropping method of the debris and comparing the accumulation rate of reduction systems, and the experiment was carried out 5 times. According to the experimental results, there was a difference in the accumulation rate according to the type of reduction system and the shape of debris, and it often depended significantly on the initial shape of debris accumulation. The direct debris reduction effect on the bridge was higher in the order of the debris deflector, debris sweeper and debris fin, but in case of the debris deflector, damage, such as stream turbulence, changes in water level and river bed, and the loss of deflector can occur due to debris accumulated directly on the debris deflector. Therefore, it is necessary to design the debris deflector considering these issues.

Field Investigation of Debris Flow Hazard Area on the Roadside and Evaluating Efficiency of Debris barrier

  • Lee, Jong Hyun;Lee, Jung Yub;Yoon, Sang Won;Oak, Young Suk;Kim, Jae Jeong;Kim, Seung Hyun
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.439-447
    • /
    • 2015
  • In this study, specific sections vulnerable to debris flow damage were selected, and a complete enumeration survey was performed for the sections with debris flow hazards. Based on this, the characteristics of the sections with debris flow hazards and the current status of actions against debris flow were examined, and an efficient installation plan for a debris flow damage prevention method that is required in the future was suggested. The results indicated that in the Route 56 section where the residential density is relatively higher between the two model survey sections, facilities for debris flow damage reduction were insufficient compared to those in the Route 6 section which is a mountain area. It is thought that several sites require urgent preparation of a facility for debris flow damage reduction. In addition, a numerical analysis showed that for debris barriers installed as a debris flow damage prevention method, distributed installation of a number of small-scale barriers facilities within a valley part was more effective than single installation of a large-scale debris barrier at the lower part of a valley.

Efficiency of Soil Erosion to a Debris Barrier using GIS (GIS를 이용한 사방댐의 토사유실 저감효과 분석)

  • Lee, Geun-Sang;Lee, Moung-Jin;Hong, Hyun-Jung;Hwang, Eui-Ho
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.10 no.1
    • /
    • pp.158-168
    • /
    • 2007
  • This study analyzed the reduction efficiency to a debris barrier planed with the Office of Forestry and local provinces among diverse measurements for the diminution of high-density turbid water and soil erosion of Soyang reservoir. As the analysis of soil erosion of Soyang river basin applying rainfall data (2005) and GIS database, soil erosion is estimated as 4,819,494 ton. Also, in the analysis of unit soil erosion, Chugok-, Jaun-, and Ohang stream shows high value comparing with other watersheds. Debris barrier watersheds are extracted as the center of 94 debris barrier points using GIS spatial analysis. As the analysis of soil erosion and sediment delivery ratio (SDR) of debris barrier watershed, the reduction efficiency of soil erosion of debris barrier of 2005 is analyzed as 6.8%, that is 330,203 ton. Also, the reduction efficiency of soil erosion of debris barrier of 2005 increases as 10.5%, that is 506,783 ton, when the locations of debris barrier are changed into the high soil erosion area over 5,000 ton.

  • PDF

A basic study for Decision of Debris Barrier Model it is suitable to Mountains among the Kangwon (강원산간지형에 적합한 사방댐 모델결정을 위한 기초적 연구)

  • Hwang, Suk-Min;Lee, Seung-Ho;Moon, Jung-Shik;Kim, Yu-Tae
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.530-533
    • /
    • 2007
  • Our country occurs yearly damage, because of every year in the summer season characteristic localized torrential downpour. Therefor, we will research damage instance and natural calamity reduction effective plan through research against a landslide relation Debris Barrier, And the Debris Barrier decide suitability of Mountains among the Kangwon.

  • PDF

An Experimental Study on Debris Reduction System for Culvert (암거의 유송잡물 저감시설에 관한 실험 연구)

  • Kim, Sung-Joong;Kang, Joon-Gu;Kim, Jong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.696-706
    • /
    • 2017
  • The purpose of this study was to verify experimentally debris reduction facilities for culverts installed in small rivers. A culvert is defined as a structure laid under a road or a railroad that passes through an inner urban area or downtown area to make an artificial canal. Culverts are generally categorized into road culverts or waterway culverts, among which the latter are artificial structures designed to discharge running water into a river. At the time of floods, the structural safety of waterway culverts can be undermined by the accumulation of debris, such as soil, boughs and weeds, and they may be at risk of overflowing due to blockages. Debris reduction facilities are necessary to prevent such damage. In this study, the effects of the three existing types of debris reduction facilities were examined through hydraulic experiments. The results of the experiments showed that vertical separation to divert debris reduced the accumulation rate by 27.65 to 31.39 percent. The two types of screen designed to block and divert debris, respectively, were found to have excellent debris blocking abilities. However, when the effects of the rising water level are considered simultaneously, the screen to divert debris was found to show superior effects. The screen to block debris can be considered to have excellent debris blocking ability, but requires the continuous collection of the debris, due to the high risk of rising water levels caused by its accumulation.

Numerical simulation of 3-D probabilistic trajectory of plate-type wind-borne debris

  • Huang, Peng;Wang, Feng;Fu, Anmin;Gu, Ming
    • Wind and Structures
    • /
    • v.22 no.1
    • /
    • pp.17-41
    • /
    • 2016
  • To address the uncertainty of the flight trajectories caused by the turbulence and gustiness of the wind field over the roof and in the wake of a building, a 3-D probabilistic trajectory model of flat-type wind-borne debris is developed in this study. The core of this methodology is a 6 degree-of-freedom deterministic model, derived from the governing equations of motion of the debris, and a Monte Carlo simulation engine used to account for the uncertainty resulting from vertical and lateral gust wind velocity components. The influence of several parameters, including initial wind speed, time step, gust sampling frequency, number of Monte Carlo simulations, and the extreme gust factor, on the accuracy of the proposed model is examined. For the purpose of validation and calibration, the simulated results from the 3-D probabilistic trajectory model are compared against the available wind tunnel test data. Results show that the maximum relative error between the simulated and wind tunnel test results of the average longitudinal position is about 20%, implying that the probabilistic model provides a reliable and effective means to predict the 3-D flight of the plate-type wind-borne debris.

A Study on the Deposition Characteristics of Debris Flow Using Small-scaled Laboratory Test (실내 모형실험을 통한 토석류 퇴적 특성 연구)

  • Chang, Hyungjoon;Ryou, Kukhyun;Lee, Hojin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.2
    • /
    • pp.25-33
    • /
    • 2021
  • This study was conducted to understand the deposition characteristics of debris flow and to analyze the reduction effect of debris flow damage by installing a berm. Flume experiments were performed in consideration of various channel slope and volumetric sediment concontration. In order to analyze the reduction effect of debris flow damage by installing a berm, the cases of not installing a berm and the cases of installing a berm were compared. In this study, the runout distance, total travel distance, and mobility ratio were analyzed among the deposition characteristics of debris flow. First, the deposition characteristics of debris flow according to the change of the channel slope were analyzed, and the deposition characteristics of debris flow due to the change of volumetric sediment concentration were analyzed. In addition, the change rate of debris flow deposition characteristics when a berm was installed was calculated based on the case when a berm was not installed. As a result of the experiments, it was confirmed that the channel slope and volumetric sediment concentration had a significant effect on the deposition characteristics of debris flow. In addition, when a berm is installed on the slope, the runout distance and mobility ratio of debris flow are greatly decreased, and the total travel distance is increased. This means that installing a berm delays the movement of debris flow and reduces the potential mobility of debris flow. The results of this study will provide useful information for understanding the deposition characteristics of debris flow. Furthermore, it is expected to help in the design of a berm.

Influence of an in-vessel debris bed on the heat load to a reactor vessel under an IVR condition

  • Joon-Soo Park;Hae-Kyun Park;Bum-Jin Chung
    • Nuclear Engineering and Technology
    • /
    • v.55 no.1
    • /
    • pp.180-189
    • /
    • 2023
  • We measured the heat load to a reactor vessel with and without the in-vessel debris bed under an IVR-ERVC condition. Mass transfer methodology was adopted based on heat and mass transfer analogy to achieve high Ra'H of order ~1015 with compact test rigs. We postulated the in-vessel debris bed has a flat top and particulate debris was simulated as an identical diameter spheres. We conducted experiments varying the height of the debris bed and the results showed that Nusselt numbers decreased in both uppermost and curved surfaces with the increasing bed height. Once the debris bed is formed, it acts as an obstacle to the natural convective flow, which reduces the buoyancy. The reduction of driving force results in the impaired heat transfer in both upward and downward heat transfers.

A new rotational force model for quasi-steady theory of plate-like windborne debris in uniform flow

  • Lin, Huatan;Huang, Peng;Gu, Ming
    • Wind and Structures
    • /
    • v.35 no.2
    • /
    • pp.109-120
    • /
    • 2022
  • The force coefficients of rotating plates in the acceleration stage will vary with rotation rate from 0 to stable rotation rate w0, which are important for quasi-steady theory of plate-like windborne debris to simulate the trajectory. In this paper, a wind tunnel experiment is carried out to study the effects of geometry and the Reynolds number on the variations of mean force coefficients of rotating plates. The rotational lift coefficients are sensitive to both geometry effect and Reynolds number effect, while the rotational drag and moment coefficients are only sensitive to geometry effect. In addition, new empirical formulas for the rotational lift coefficient and moment coefficients are proposed. Its accuracy is verified by comparing the predicted results with existing test data. Based on the experimental data of rotating plates, a new rotational force model for quasi-steady theory, which can be applied to a wider scope, is proposed to calculate the trajectory of plate-like windborne debris. The results show that the new model provides a better match with the tested trajectories than previous quasi-steady theories.

Verification on Debris Reduction Ability of the Sweeper by Real Scale Experiment (실규모 실험검증을 통한 스위퍼의 유송잡물 저감능력 검토)

  • Kim, Sung-Joong;Jung, Do-Joon;Kang, Joon-Gu;Yeo, Hong-Koo;Kim, Jong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.9
    • /
    • pp.34-44
    • /
    • 2016
  • This study is an experimental study about a facility for preventing the accumulation of floating debris at a bridge by flooding at a small river. Generally, structures installed at a small river are damaged frequently by floating debris during typhoons or localized rainfall events. On the other hand, there is no method available for preventing such damage. The facilities used in other countries to prevent such damage by the accumulation of floating debris include debris fins, deflectors, and sweeper. Among these facilities, the present study was conducted with a sweeper to investigate the damage-reducing capability through a real-scale accumulation experiment. A sweeper was installed in front of a bridge to bypass floating debris by self-rotation so that the floating debris may not be accumulate at the bridge. A small bridge model was prepared in a real-scale for the real-scale experiment. The accumulation reducing capability was compared through an accumulation experiment before and after the sweeper installation depending on the length of the debris and flow conditions. The result showed that the accumulation rate increased with increasing length of the debris or decreasing flow rate. The installation of a sweeper decreased the debris accumulation rate by a minimum of 55% to a maximum of 88% compared to the case without an installed sweeper. The result of the present study showed that the installation of a sweeper at a small river having a high potential of generating floating debris may help secure the stability of a bridge in the case of floating debris accumulation.